Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Covington Excludes Dredging County, Alabama.
Davis-Bacon Heavy
Wage determination AL20260063, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Operating Engineers: Oiler | $28.95 | $20.55 | $49.50 |
| Operating Engineers: Cranes With 500 Feet Boom And/Or 600 Ton Capacity | $34.20 | $20.55 | $54.75 |
| Operating Engineers: Cranes With 350 Feet Or More Boom And/Or 400 To 600 Ton Capacity | $33.85 | $20.55 | $54.40 |
| Operating Engineers: (Cranes (Conventional & Hydraulic 100 To 400 Tons), And Tower Cranes) | $32.75 | $20.55 | $53.30 |
| Operating Engineers: (Crane (Conventional & Hydraulic Up To 100 Tons), And Derrick (Stationary Crane With 2 Or More Drums)) | $29.90 | $20.55 | $50.45 |
| Truck Driver | $10.09 | $0.00 | $10.09 |
| Operator: Trackhoe | $12.00 | $0.00 | $12.00 |
| Operator: Scraper | $9.78 | $0.18 | $9.96 |
| Operator: Roller | $9.45 | $0.00 | $9.45 |
| Operator: Loader (Front End) | $11.67 | $0.00 | $11.67 |
| Operator: Grader/Blade | $12.59 | $1.33 | $13.92 |
| Operator: Drill | $9.50 | $2.36 | $11.86 |
| Operator: Bulldozer | $12.72 | $1.09 | $13.81 |
| Operator: Backhoe | $13.25 | $2.17 | $15.42 |
| Laborer: Pipelayer | $9.00 | $1.43 | $10.43 |
| Laborer: Common Or General | $7.50 | $1.19 | $8.69 |
| Electrician | $15.24 | $2.50 | $17.74 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.