Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Greene Excludes Dredging County, Alabama.
Davis-Bacon Heavy
Wage determination AL20260121, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Electrician | $31.00 | $16.22 | $47.22 |
| Operating Engineers: Oiler | $28.45 | $13.98 | $42.43 |
| Operating Engineers: Backhoe, Crane, Cherry Picker, Front End Loader, Hoist, And Mechanic | $31.52 | $13.98 | $45.50 |
| Ironworker, Structural | $33.75 | $14.03 | $47.78 |
| Truck Driver | $10.00 | $0.00 | $10.00 |
| Operator: Trackhoe | $11.50 | $0.44 | $11.94 |
| Operator: Roller | $11.48 | $2.70 | $14.18 |
| Operator: Grader/Blade | $15.58 | $4.66 | $20.24 |
| Operator: Forklift | $19.40 | $5.76 | $25.16 |
| Operator: Excavator | $14.00 | $0.00 | $14.00 |
| Operator: Bulldozer | $17.00 | $0.65 | $17.65 |
| Operator: Asphalt Spreader | $13.36 | $0.00 | $13.36 |
| Laborer: Pipelayer | $10.07 | $1.37 | $11.44 |
| Laborer: Common Or General | $8.96 | $0.00 | $8.96 |
| Cement Mason/Concrete Finisher | $11.94 | $0.40 | $12.34 |
| Carpenter, Includes Form Work | $14.60 | $0.00 | $14.60 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.