Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Mobile Excludes Dredging County, Alabama.
Davis-Bacon Heavy
Wage determination AL20260110, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Power Equipment Operator: Bulldozer (Pipeline) | $48.89 | $18.00 | $66.89 |
| Power Equipment Operator: Backhoe, Excavator, Trackhoe (Pipeline) | $48.89 | $18.00 | $66.89 |
| Truck Driver: Dump Truck, Includes Water Sewer Lines | $12.56 | $2.12 | $14.68 |
| Operator: Loader, Includes Water Sewer Lines | $17.64 | $2.14 | $19.78 |
| Operator: Backhoe/Excavator/Trackhoe, Includes Water Sewer Lines (Excludes, Pipeline) | $13.56 | $0.00 | $13.56 |
| Laborer: Pipelayer, Includes Water Sewer Lines | $11.95 | $0.00 | $11.95 |
| Laborer: Common Or General, Includes Water Sewer Lines | $15.21 | $6.16 | $21.37 |
| Electrician | $19.56 | $0.00 | $19.56 |
| Cement Mason/Concrete Finisher, Includes Water Sewer Lines | $13.78 | $0.00 | $13.78 |
| Carpenter, Includes Form Work | $19.05 | $7.86 | $26.91 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.