Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Shelby Excludes Dredging County, Alabama.
Davis-Bacon Heavy
Wage determination AL20260116, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Truck Driver: Dump Truck, Includes Water Sewer Lines | $12.25 | $2.58 | $14.83 |
| Operator: Loader, Includes Water Sewer Lines | $17.64 | $2.14 | $19.78 |
| Operator: Backhoe/Excavator/Trackhoe, Includes Water Sewer Lines | $18.13 | $3.66 | $21.79 |
| Laborer: Pipelayer, Includes Water Sewer Lines | $13.91 | $2.04 | $15.95 |
| Laborer: Common Or General, Includes Water Sewer Lines | $13.04 | $1.41 | $14.45 |
| Electrician | $20.86 | $4.04 | $24.90 |
| Cement Mason/Concrete Finisher, Includes Water Sewer Lines | $13.71 | $0.00 | $13.71 |
| Carpenter, Includes Form Work | $20.26 | $8.59 | $28.85 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.