Prevailing wage rates in Wade Hampton Borough, Alaska

Current Davis-Bacon and Service Contract Act wage determinations for Wade Hampton Borough, Alaska (2026), from the official SAM.gov wage determinations. Updated monthly.

Davis-Bacon rates (construction)

Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Wade Hampton Borough, Alaska.

Davis-Bacon Building, Heavy

Wage determination AK20260001, revision 4, updated 0. Basic hourly rate plus fringe benefit per hour.

TradeRateFringeTotal / hour
Asbestos Workers/Insulator (Includes Application Of All Insulating Materials Protective Coverings, Coatings And Finishings To All Types Of Mechanical Systems)$41.35$16.46$57.81
Hazardous Material Handler (Includes Preparation, Wetting, Stripping, Removal Scrapping, Vacuming, Bagging, And Disposing Of All Insulation Materials, Whether They Contain Asbestos Or Not, From Mechanical Systems)$37.38$19.55$56.93
Boilermaker$58.33$28.79$87.12
Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker$52.77$12.36$65.13
Tile & Terrazzo Finisher$40.91$12.48$53.39
Carpenter (Including Lather And Drywall Hanging)$50.79$26.42$77.21
Millwright$56.44$25.87$82.31
Task And Decompression Are Complete. The Diver Rate Shall Be Paid For All Saturation Hours. Work In Combination Of Classifications: Employees Working In Any Combination Of Classifications Within The Diving Crew (Except Dive Supervisor) In A Shift Are Paid In The Classification With The Highest Rate For That Shift$61.42$25.34$86.76
Task And Decompression Are Complete. The Diver Rate Shall Be Paid For All Saturation Hours. Work In Combination Of Classifications: Employees Working In Any Combination Of Classifications Within The Diving Crew (Except Dive Supervisor) In A Shift Are Paid In The Classification With The Highest Rate For That Shift$53.03$25.34$78.37
Task And Decompression Are Complete. The Diver Rate Shall Be Paid For All Saturation Hours. Work In Combination Of Classifications: Employees Working In Any Combination Of Classifications Within The Diving Crew (Except Dive Supervisor) In A Shift Are Paid In The Classification With The Highest Rate For That Shift$92.83$26.42$119.25
Piledriver (Piledriver; Skiff Operator And Rigger) $ 48.72 26.42 Piledriver (Sheet Stabber)$48.72$26.42$75.14
Piledriver (Welder)$54.28$26.42$80.70
Cable Splicer$55.44$30.33$85.77
Electrician$55.44$30.33$85.77
Cable Splicer (Line Construction)$74.34$35.70$110.04
Linemen: Line Construction (Including Equipment Operators, Technician)$72.59$35.65$108.24
Powderman, Line Construction$70.59$35.59$106.18
Tree Trimmer, Line Construction$42.23$30.10$72.33
Paid Holidays: New Year'S Day; Memorial Day; Independence Day; Labor Day; Veteran'S Day; Thanksgiving Day; Friday After Thanksgiving, And Christmas Day$71.44$38.44$109.88
Machine; Shovels, Backhoes, Excavators With All Attachments, And Gradealls (3 Yards And Under); Sub Grader (Gurries, Reclaimer, And Similar Types); Tack Tractor; Truck Mounted: Concrete Pump, Conveyor/Tele-Belt, And Creter; Off Road Hauler (Including Articulating And Haul Trucks); Water Kote Machine$55.75$30.60$86.35
Asphalt); Power Plants: 1000 Kw And Over; Quad; Roto Mill, Profiler, And Reclaimer; Scrapers Over 40 Yards; Screed; Shovels, Backhoes, Excavators With All Attachments (Over 3 Yards); Sidebooms Over 45 Tons; Slip Form Paver, C.M.I., And Similar Types; Topside (Asphalt Paver, Slurry Machine, Spreaders, And Similar Types)$57.95$30.60$88.55
(Except As Listed In Group I); Hoists On Steel Erection, Tower-Mobiles, And Air Tuggers; Horizontal/Directional Drill Locator; Locomotives: Rod And Geared Engines; Mixers; Screening, Washing Plant; Sideboom (Cradling Rock Drill Regardless Of Size); Skidder; Trenching Machines Under 16 Inches; Water/Wastewater Treatment Operator$54.80$30.60$85.40
Mechanics (Light Duty); Oil, Blower Distribution; Posthole Diggers, Mechanical; Pot Fireman (Power Agitated); Power Plant, Turbine Operator, Under 200 K.W.; Pumps-Water; Rollers (Other Than Asphalt); Saws, Concrete; Skid Hustler; Skid Steer With All Attachments; Straightening Machine; Stake Hopper; Tow Tractor$53.90$30.60$84.50
Grader (Gurries, Reclaimer, And Similar Types); Tack Tractor; Truck Mounted: Concrete Pump, Conveyor/Tele-Belt, And Creter; Off Road Hauler (Including Articulating And Haul Trucks); Water Kote Machine. Footnote: Groups 1-4 Receive 10% Premium While Performing Tunnel Or Underground Work$61.33$30.60$91.93
40 Yards; Screed; Shovels, Backhoes, Excavators With All Attachments (Over 3 Yards); Sidebooms Over 45 Tons; Slip Form Paver, C.M.I., And Similar Types; Topside (Asphalt Paver, Slurry Machine, Spreaders, And Similar Types). Footnote: Groups 1-4 Receive 10% Premium While Performing Tunnel Or Underground Work$63.75$30.60$94.35
Drill Regardless Of Size); Skidder; Trenching Machines Under 16 Inches; Water/Wastewater Treatment Operator. Footnote: Groups 1-4 Receive 10% Premium While Performing Tunnel Or Underground Work. Rig Oiler/Crane Assistant Engineer Shall Be Required On Cranes Over 85 Tons Or Over 100 Feet Of Boom$60.28$30.60$90.88
Ironworker (Bender Operator)$46.98$39.48$86.46
Ironworker (Bridge, Structural, Ornamental, Reinforcing Machinery Mover, Rigger, Sheeter, Stage Rigger, Bender Operator)$46.98$39.48$86.46
Ironworker (Fence, Barrier Installer)$43.48$39.48$82.96
Ironworker (Guardrail Installers)$44.48$39.48$83.96
Ironworker (Guardrail Layout Man)$44.22$39.48$83.70
Ironworker (Helicopter, Tower)$47.89$39.48$87.37
Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building And Erecting; Slurry Work; Stake Hopper; Steam Point Or Water Jet Operator; Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer And Conduit Installer; Watchman (Construction Projects); Window Cleaner$42.25$35.01$77.26
Man Or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building And Erecting; Slurry Work; Stake Hopper; Steam Point Or Water Jet Operator; Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer And Conduit Installer; Watchman (Construction Projects); Window Cleaner$46.48$35.01$81.49
Decorative Block Above 4 Feet); Mason Tender And Mud Mixer (Sewer Work); Pilot Car; Plasterer, Bricklayer And Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, Chain Saw Operator, Filer; Timberman$43.25$35.01$78.26
Above 4 Feet); Mason Tender And Mud Mixer (Sewer Work); Pilot Car; Plasterer, Bricklayer And Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, Chain Saw Operator, Filer; Timberman$47.58$35.01$82.59
Laborer: Group 3 (South Of The 63Rd Parallel & West Of Longitude 138 Degrees) Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger And Tree Topper; High Scaler; Multiplate; Slurry Seal Squeegee Man$44.15$35.01$79.16
Laborer: Group 3 Tunnels, Shafts, And Raises (South Of The 63Rd Parallel & West Of Longitude 138 Degrees) Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger And Tree Topper; High Scaler; Multiplate; Slurry Seal Squeegee Man$48.57$35.01$83.58
Laborer: Group 3A (South Of The 63Rd Parallel & West Of Longitude 138 Degrees) Asphalt Raker, Asphalt Belly Dump Lay Down; Drill Doctor (In The Field); Drillers (Including, But Not Limited To, Wagon Drills, Air Track Drills; Hydraulic Drills); Powderman; Pioneer Drilling And Drilling Off Tugger (All Type Drills); Pipelayers$48.68$35.01$83.69
(South Of The 63Rd Parallel & West Of Longitude 138 Degrees) Asphalt Raker, Asphalt Belly Dump Lay Down; Drill Doctor (In The Field); Drillers (Including, But Not Limited To, Wagon Drills, Air Track Drills; Hydraulic Drills); Powderman; Pioneer Drilling And Drilling Off Tugger (All Type Drills); Pipelayers$53.55$35.01$88.56
Laborer: Group 3B (South Of The 63Rd Parallel & West Of Longitude 138 Degrees) Grade Checker (Setting Or Transfering Of Grade Marks, Line And Grade)$57.71$29.06$86.77
Laborer: Group 3B Tunnels, Shafts, And Raises (South Of The 63Rd Parallel & West Of Longitude 138 Degrees) Grade Checker (Setting Or Transfering Of Grade Marks, Line And Grade)$63.48$29.06$92.54
Laborer: Group 4 (South Of The 63Rd Parallel & West Of Longitude 138 Degrees) Final Building Cleanup Tunnels, Shafts, And Raises Classifications$31.82$35.01$66.83
Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building And Erecting; Slurry Work; Stake Hopper; Steam Point Or Water Jet Operator; Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer And Conduit Installer; Watchman (Construction Projects); Window Cleaner$42.25$35.01$77.26
Man Or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building And Erecting; Slurry Work; Stake Hopper; Steam Point Or Water Jet Operator; Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer And Conduit Installer; Watchman (Construction Projects); Window Cleaner$46.48$35.01$81.49
Decorative Block Above 4 Feet); Mason Tender And Mud Mixer (Sewer Work); Pilot Car; Plasterer, Bricklayer And Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, Chain Saw Operator, Filer; Timberman$43.25$35.01$78.26
Above 4 Feet); Mason Tender And Mud Mixer (Sewer Work); Pilot Car; Plasterer, Bricklayer And Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, Chain Saw Operator, Filer; Timberman$47.58$35.01$82.59
Laborer: Group 3 (North Of The 63Rd Parallel & East Of Longitude 138 Degrees) Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger And Tree Topper; High Scaler; Multiplate; Slurry Seal Squeegee Man$44.15$35.01$79.16
Laborer: Group 3 Tunnels, Shafts, And Raises (North Of The 63Rd Parallel & East Of Longitude 138 Degrees) Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger And Tree Topper; High Scaler; Multiplate; Slurry Seal Squeegee Man$48.57$35.01$83.58
Laborer: Group 3A (North Of The 63Rd Parallel & East Of Longitude 138 Degrees) Asphalt Raker, Asphalt Belly Dump Lay Down; Drill Doctor (In The Field); Drillers (Including, But Not Limited To, Wagon Drills, Air Track Drills; Hydraulic Drills); Powderman; Pioneer Drilling And Drilling Off Tugger (All Type Drills); Pipelayers$48.68$35.01$83.69
(North Of The 63Rd Parallel & East Of Longitude 138 Degrees); Asphalt Raker, Asphalt Belly Dump Lay Down; Drill Doctor (In The Field); Drillers (Including, But Not Limited To, Wagon Drills, Air Track Drills; Hydraulic Drills); Powderman; Pioneer Drilling And Drilling Off Tugger (All Type Drills); Pipelayers$53.55$35.01$88.56
Laborer: Group 3B (North Of The 63Rd Parallel & East Of Longitude 138 Degrees) Grade Checker (Setting Or Transfering Of Grade Marks, Line And Grade)$57.71$29.06$86.77
Laborer: Group 3B Tunnels, Shafts, And Raises (North Of The 63Rd Parallel & East Of Longitude 138 Degrees) Grade Checker (Setting Or Transfering Of Grade Marks, Line And Grade)$63.48$29.06$92.54
Laborer: Group 4 (North Of The 63Rd Parallel & East Of Longitude 138 Degrees) Final Building Cleanup$31.82$35.01$66.83
Painter: Brush/Roller Paint Or Wall Coverer (North Of The 63Rd Parallel)$43.05$26.45$69.50
Painter: General Painter (South Of The 63Rd Parallel)$37.29$30.20$67.49
Painter: Industrial Painter (South Of The 63Rd Parallel)$38.64$30.20$68.84
Glazier (North Of The 63Rd Parallel)$46.76$30.46$77.22
Floor Layer: Carpet$39.48$16.25$55.73
Glazier (South Of The 63Rd Parallel)$47.42$29.10$76.52
Plasterer (North Of The 63Rd Parallel)$49.28$22.28$71.56
Plasterer (South Of The 63Rd Parallel)$49.28$22.28$71.56
Cement Mason/Concrete Finisher (North Of The 63Rd Parallel)$49.28$22.28$71.56
Cement Mason/Concrete Finisher (South Of The 63Rd Parallel)$49.28$22.28$71.56
Plumber; Steamfitter (East Of The 141St Meridian)$41.50$27.62$69.12
Plumber; Steamfitter (South Of The 63Rd Parallel)$50.00$33.20$83.20
Plumber; Steamfitter (North Of The 63Rd Parallel)$55.66$34.90$90.56
Sprinkler Fitter$60.67$31.39$92.06
Roofer$52.07$19.62$71.69
Sheet Metal Worker (South Of The 63Rd Parallel)$55.10$31.72$86.82
Sheet Metal Worker (North Of The 63Rd Parallel)$59.85$32.35$92.20
Deltas, Commanders, Rollogans And Similar Equipment When Pulling Sleds, Trailers Or Similar Equipment; Boat Coxswain; Lowboys Including Attached Trailers And Jeeps, Up To And Including 12 Axles; Ready-Mix Over 12 Yards Up To And Including 15 Yards); Water Wagon (250 Bbls And Above); Tireman, Heavy Duty/Fueler$51.58$26.43$78.01
Truck Driver (Group 1A) Dump Trucks (Including Rockbuggy And Trucks With Pups) Over 60 Yards Up To And Including 100 Yards; Jeeps (Driver Under Load)$53.05$26.43$79.48
(Including Rockbuggy And Trucks With Pups) Over 20 Yards Up To And Including 40 Yards; Lowboys Including Attached Trailers And Jeeps Up To And Including 8 Axles; Super Vac Truck/Cacasco Truck/Heat Stress Truck; Ready-Mix Over 7 Yards Up To And Including 12 Yards; Partsman; Stringing Truck$50.12$26.43$76.55
Truck Driver (Group 3) Dump Trucks (Including Rockbuggy And Trucks With Pups) Over 10 Yards Up To And Including 20 Yards; Batch Trucks 8 Yards And Up; Oil Distributor Drivers; Oil Distributor Drivers; Trucks/Jeeps (Push Or Pull); Traffic Control Technician$49.17$26.43$75.60
Dual Axle; Vacuum Trucks, Truck Vacuum Sweepers; Loadmaster (Air And Water); Air Cushion Or Similar Type Vehicle; Fire Truck/Ambulance Driver; Combination Truck-Fuel And Grease; Compactor (When Pulled By Rubber Tired Equipment); Rigger (Air/Water/Oilfield); Ready Mix, Up To And Including 7 Yards;$48.50$26.43$74.93
Tractor (When Material Handling Or Pulling Wagons On A Construction Project); Foam Distributor, Single Axle; Hydro-Seeders, Single Axle; Team Drivers (Horses, Mules And Similar Equipment); Fuel Handler (Station/Bulk Attendant); Batch Truck, Up To And Including 7 Yards; Gear/Supply Truck; Bus Operator, Up To 30 Passengers; Rigger/Swamper$47.62$26.43$74.05

Davis-Bacon Residential

Wage determination AK20260005, revision 3, updated 0. Basic hourly rate plus fringe benefit per hour.

TradeRateFringeTotal / hour
Machine; Shovels, Backhoes, Excavators With All Attachments, And Gradealls (3 Yards And Under); Sub Grader (Gurries, Reclaimer, And Similar Types); Tack Tractor; Truck Mounted: Concrete Pump, Conveyor/Tele-Belt, And Creter; Off Road Hauler (Including Articulating And Haul Trucks); Water Kote Machine$55.75$30.60$86.35
Asphalt); Power Plants: 1000 Kw And Over; Quad; Roto Mill, Profiler, And Reclaimer; Scrapers Over 40 Yards; Screed; Shovels, Backhoes, Excavators With All Attachments (Over 3 Yards); Sidebooms Over 45 Tons; Slip Form Paver, C.M.I., And Similar Types; Topside (Asphalt Paver, Slurry Machine, Spreaders, And Similar Types)$57.95$30.60$88.55
(Except As Listed In Group I); Hoists On Steel Erection, Tower-Mobiles, And Air Tuggers; Horizontal/Directional Drill Locator; Locomotives: Rod And Geared Engines; Mixers; Screening, Washing Plant; Sideboom (Cradling Rock Drill Regardless Of Size); Skidder; Trenching Machines Under 16 Inches; Water/Wastewater Treatment Operator$54.80$30.60$85.40
Mechanics (Light Duty); Oil, Blower Distribution; Posthole Diggers, Mechanical; Pot Fireman (Power Agitated); Power Plant, Turbine Operator, Under 200 K.W.; Pumps-Water; Rollers (Other Than Asphalt); Saws, Concrete; Skid Hustler; Skid Steer With All Attachments; Straightening Machine; Stake Hopper; Tow Tractor$53.90$30.60$84.50
Grader (Gurries, Reclaimer, And Similar Types); Tack Tractor; Truck Mounted: Concrete Pump, Conveyor/Tele-Belt, And Creter; Off Road Hauler (Including Articulating And Haul Trucks); Water Kote Machine. Footnote: Groups 1-4 Receive 10% Premium While Performing Tunnel Or Underground Work$61.33$30.60$91.93
40 Yards; Screed; Shovels, Backhoes, Excavators With All Attachments (Over 3 Yards); Sidebooms Over 45 Tons; Slip Form Paver, C.M.I., And Similar Types; Topside (Asphalt Paver, Slurry Machine, Spreaders, And Similar Types). Footnote: Groups 1-4 Receive 10% Premium While Performing Tunnel Or Underground Work$63.75$30.60$94.35
Drill Regardless Of Size); Skidder; Trenching Machines Under 16 Inches; Water/Wastewater Treatment Operator. Footnote: Groups 1-4 Receive 10% Premium While Performing Tunnel Or Underground Work. Rig Oiler/Crane Assistant Engineer Shall Be Required On Cranes Over 85 Tons Or Over 100 Feet Of Boom$60.28$30.60$90.88
Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building And Erecting; Slurry Work; Stake Hopper; Steam Point Or Water Jet Operator; Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer And Conduit Installer; Watchman (Construction Projects); Window Cleaner$42.25$35.01$77.26
Man Or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building And Erecting; Slurry Work; Stake Hopper; Steam Point Or Water Jet Operator; Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer And Conduit Installer; Watchman (Construction Projects); Window Cleaner$46.48$35.01$81.49
Decorative Block Above 4 Feet); Mason Tender And Mud Mixer (Sewer Work); Pilot Car; Plasterer, Bricklayer And Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, Chain Saw Operator, Filer; Timberman$43.25$35.01$78.26
Above 4 Feet); Mason Tender And Mud Mixer (Sewer Work); Pilot Car; Plasterer, Bricklayer And Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, Chain Saw Operator, Filer; Timberman$47.58$35.01$82.59
Laborer: Group 3 (South Of The 63Rd Parallel & West Of Longitude 138 Degrees) Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger And Tree Topper; High Scaler; Multiplate; Slurry Seal Squeegee Man$44.15$35.01$79.16
Laborer: Group 3 Tunnels, Shafts, And Raises (South Of The 63Rd Parallel & West Of Longitude 138 Degrees) Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger And Tree Topper; High Scaler; Multiplate; Slurry Seal Squeegee Man$48.57$35.01$83.58
Laborer: Group 3A (South Of The 63Rd Parallel & West Of Longitude 138 Degrees) Asphalt Raker, Asphalt Belly Dump Lay Down; Drill Doctor (In The Field); Drillers (Including, But Not Limited To, Wagon Drills, Air Track Drills; Hydraulic Drills); Powderman; Pioneer Drilling And Drilling Off Tugger (All Type Drills); Pipelayers$48.68$35.01$83.69
(South Of The 63Rd Parallel & West Of Longitude 138 Degrees) Asphalt Raker, Asphalt Belly Dump Lay Down; Drill Doctor (In The Field); Drillers (Including, But Not Limited To, Wagon Drills, Air Track Drills; Hydraulic Drills); Powderman; Pioneer Drilling And Drilling Off Tugger (All Type Drills); Pipelayers$53.55$35.01$88.56
Laborer: Group 3B (South Of The 63Rd Parallel & West Of Longitude 138 Degrees) Grade Checker (Setting Or Transfering Of Grade Marks, Line And Grade)$57.71$29.06$86.77
Laborer: Group 3B Tunnels, Shafts, And Raises (South Of The 63Rd Parallel & West Of Longitude 138 Degrees) Grade Checker (Setting Or Transfering Of Grade Marks, Line And Grade)$63.48$29.06$92.54
Laborer: Group 4 (South Of The 63Rd Parallel & West Of Longitude 138 Degrees) Final Building Cleanup Tunnels, Shafts, And Raises Classifications$31.82$35.01$66.83
Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building And Erecting; Slurry Work; Stake Hopper; Steam Point Or Water Jet Operator; Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer And Conduit Installer; Watchman (Construction Projects); Window Cleaner$42.25$35.01$77.26
Man Or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building And Erecting; Slurry Work; Stake Hopper; Steam Point Or Water Jet Operator; Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer And Conduit Installer; Watchman (Construction Projects); Window Cleaner$46.48$35.01$81.49
Decorative Block Above 4 Feet); Mason Tender And Mud Mixer (Sewer Work); Pilot Car; Plasterer, Bricklayer And Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, Chain Saw Operator, Filer; Timberman$43.25$35.01$78.26
Above 4 Feet); Mason Tender And Mud Mixer (Sewer Work); Pilot Car; Plasterer, Bricklayer And Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, Chain Saw Operator, Filer; Timberman$47.58$35.01$82.59
Laborer: Group 3 (North Of The 63Rd Parallel & East Of Longitude 138 Degrees) Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger And Tree Topper; High Scaler; Multiplate; Slurry Seal Squeegee Man$44.15$35.01$79.16
Laborer: Group 3 Tunnels, Shafts, And Raises (North Of The 63Rd Parallel & East Of Longitude 138 Degrees) Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger And Tree Topper; High Scaler; Multiplate; Slurry Seal Squeegee Man$48.57$35.01$83.58
Laborer: Group 3A (North Of The 63Rd Parallel & East Of Longitude 138 Degrees) Asphalt Raker, Asphalt Belly Dump Lay Down; Drill Doctor (In The Field); Drillers (Including, But Not Limited To, Wagon Drills, Air Track Drills; Hydraulic Drills); Powderman; Pioneer Drilling And Drilling Off Tugger (All Type Drills); Pipelayers$48.68$35.01$83.69
(North Of The 63Rd Parallel & East Of Longitude 138 Degrees) Asphalt Raker, Asphalt Belly Dump Lay Down; Drill Doctor (In The Field); Drillers (Including, But Not Limited To, Wagon Drills, Air Track Drills; Hydraulic Drills); Powderman; Pioneer Drilling And Drilling Off Tugger (All Type Drills); Pipelayers$53.55$35.01$88.56
Laborer: Group 3B (North Of The 63Rd Parallel & East Of Longitude 138 Degrees) Grade Checker (Setting Or Transfering Of Grade Marks, Line And Grade)$57.71$29.06$86.77
Laborer: Group 3B Tunnels, Shafts, And Raises (North Of The 63Rd Parallel & East Of Longitude 138 Degrees) Grade Checker (Setting Or Transfering Of Grade Marks, Line And Grade)$63.48$29.06$92.54
Laborer: Group 4 (North Of The 63Rd Parallel & East Of Longitude 138 Degrees) Final Building Cleanup$31.82$35.01$66.83
Carpenter (Excluding Batt & Blow Insulation And Drywall Hanging)$17.68$0.00$17.68
Cement Mason/Concrete Finisher$20.00$0.00$20.00
Drywall Finisher/Taper$20.10$0.00$20.10
Drywall Hanger$15.00$0.00$15.00
Electrician/Wireman$17.45$3.18$20.63
Fence Erector (Including Wood And Chain Link)$13.18$0.00$13.18
Floor Layer: Carpet$20.64$0.00$20.64
Installer (Batt & Blown)$18.55$0.00$18.55
Laborer, General (Excluding Site And Street Work)$13.88$0.00$13.88
Painter (Excluding Drywall Finishing)$20.60$4.47$25.07
Pipefitter (HVAC Piping)$14.00$0.00$14.00
Plumber/Pipefitter (Excluding HVAC Work)$22.80$0.00$22.80
Roofer$19.27$0.00$19.27
Sheet Metal Worker (HVAC Duct Work)$16.79$0.00$16.79
Truck Driver ((1A) Dump, Over 8 Yards)$48.50$26.43$74.93

Davis-Bacon Highway

Wage determination AK20260006, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.

TradeRateFringeTotal / hour
Truck Driver: Group 5$47.62$29.42$77.04
Truck Driver: Group 4$48.50$29.42$77.92
Truck Driver: Group 3$49.17$29.42$78.59
Truck Driver: Group 2$50.12$29.42$79.54
Truck Driver: Group 1A$53.05$29.42$82.47
Truck Driver: Group 1$51.58$29.42$81.00
Power Equipment Operator: Group 4$44.06$29.40$73.46
Power Equipment Operator: Group 3$51.46$29.40$80.86
Power Equipment Operator: Group 2$52.32$29.40$81.72
Power Equipment Operator: Group 1A$55.33$29.40$84.73
Power Equipment Operator: Group 1$53.23$29.40$82.63
Plumber/Pipefitter: South Of N 63 Latitude$47.50$32.45$79.95
Plumber/Pipefitter: North Of N 63 Latitude$51.66$32.90$84.56
Plumber/Pipefitter: First Judicial District$50.50$30.87$81.37
Piledriver Person: Piledriver-Welder$51.79$26.32$78.11
Piledriver Person: Piledriver, Sheet Stabber$50.79$26.32$77.11
(South Of N 63 Latitude)$37.32$28.52$65.84
Latitude)$35.97$28.52$64.49
Latitude)$40.33$26.17$66.50
Line Construction: Tree Trimmer$42.23$30.25$72.48
(Including Equipment Operator)$72.59$35.90$108.49
Line Construction: Powderperson$70.59$35.84$106.43
Line Construction: Line Installer$53.53$34.54$88.07
W 138 Longitude)$42.15$34.41$76.56
W 138 Longitude)$42.15$34.41$76.56
W 138 Longitude)$41.25$34.41$75.66
W 138 Longitude)$41.25$34.41$75.66
W 138 Longitude)$40.25$34.41$74.66
W 138 Longitude)$40.25$34.41$74.66
Ornamental, And Reinforcing$46.49$36.85$83.34
Ironworker: Guardrail Layout Man$43.73$36.85$80.58
Ironworker: Guardrail Installer$43.99$36.85$80.84
Ironworker: Fence Barrier Installer$42.99$36.85$79.84
Electrician: Inside Journeyman Wireman (Technician)$53.44$30.52$83.96
Carpenter (South Of N63 Latitude)$50.79$26.86$77.65
Carpenter (North Of 63 Latitude)$50.79$26.32$77.11

Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.