Prevailing wage rates in La Paz Excludes Dam Construction County, Arizona

Current Davis-Bacon and Service Contract Act wage determinations for La Paz Excludes Dam Construction County, Arizona (2026), from the official SAM.gov wage determinations. Updated monthly.

Davis-Bacon rates (construction)

Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in La Paz Excludes Dam Construction County, Arizona.

Davis-Bacon Heavy

Wage determination AZ20260052, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.

TradeRateFringeTotal / hour
Electrician$33.00$13.04$46.04
Electrician: Lineperson$62.08$22.49$84.57
Electrician: Groundperson$36.00$16.88$52.88
Electrician: Line Equipment Operator$46.56$19.15$65.71
Power Equipment Operator: Crane/Derrick$36.64$18.12$54.76
Power Equipment Operator: Loader/Front End Loader$35.56$18.12$53.68
Truck Driver: Hydrovac$32.29$18.12$50.41
Laborer: Jackhammer$29.05$9.26$38.31
Laborer: Pipelayer$29.91$9.26$39.17
Power Equipment Operator: Forklift$30.88$9.26$40.14
Laborer: Mason Tender$27.41$9.26$36.67
Laborer: Asphalt, Includes Raker, Shoveler, Spreader And Distributor$29.05$9.26$38.31
Truck Driver: Concrete$30.88$9.26$40.14
Truck Driver: Dump$30.88$9.26$40.14
Truck Driver: Water$30.88$9.26$40.14
Carpenter: Formwork Concrete$31.98$9.26$41.24
Power Equipment Operator: Backhoe/Backhoe & Loader Combo/Track Backhoe$27.38$0.00$27.38
Laborer: General$23.89$0.00$23.89

Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.