Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Navajo Navajo Indian Reservation Only County, Arizona.
Davis-Bacon Residential
Wage determination AZ20260005, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Roofer | $8.76 | $0.00 | $8.76 |
| Power Equipment Operator: Backhoe | $8.75 | $0.00 | $8.75 |
| Plumber | $11.07 | $0.00 | $11.07 |
| Plasterer | $10.00 | $0.00 | $10.00 |
| Painter (Brush, Roller, Spray) | $8.79 | $0.00 | $8.79 |
| Lather | $10.00 | $0.00 | $10.00 |
| Laborer, General | $7.25 | $0.00 | $7.25 |
| Insulator, Batt & Blown | $7.25 | $0.00 | $7.25 |
| Floor Layer: Carpet (Carpet, Vinyl, Linoleum) | $11.00 | $0.00 | $11.00 |
| Electrician | $12.76 | $0.00 | $12.76 |
| Cement Mason/Concrete Finisher | $8.96 | $0.00 | $8.96 |
| Carpenter (Including Formwork And Framing) | $10.00 | $0.00 | $10.00 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.