Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Santa Cruz Excludes Dam Construction County, Arizona.
Davis-Bacon Heavy
Wage determination AZ20260053, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Electrician | $33.00 | $13.04 | $46.04 |
| Electrician: Lineperson | $62.08 | $22.49 | $84.57 |
| Electrician: Groundperson | $36.00 | $16.88 | $52.88 |
| Electrician: Line Equipment Operator | $46.56 | $19.15 | $65.71 |
| Power Equipment Operator: Crane/Derrick | $36.64 | $18.12 | $54.76 |
| Power Equipment Operator: Loader/Front End Loader | $35.56 | $18.12 | $53.68 |
| Truck Driver: Hydrovac | $32.29 | $18.12 | $50.41 |
| Laborer: General | $27.41 | $9.26 | $36.67 |
| Laborer: Jackhammer | $29.05 | $9.26 | $38.31 |
| Laborer: Pipelayer | $29.91 | $9.26 | $39.17 |
| Power Equipment Operator: Forklift | $30.88 | $9.26 | $40.14 |
| Laborer: Mason Tender | $27.41 | $9.26 | $36.67 |
| Laborer: Asphalt, Includes Raker, Shoveler, Spreader And Distributor | $29.05 | $9.26 | $38.31 |
| Laborer: Grade Setter | $29.91 | $9.26 | $39.17 |
| Truck Driver: Concrete | $30.88 | $9.26 | $40.14 |
| Truck Driver: Dump | $30.88 | $9.26 | $40.14 |
| Truck Driver: Water | $30.88 | $9.26 | $40.14 |
| Carpenter: Formwork Concrete | $31.98 | $9.26 | $41.24 |
| Power Equipment Operator: Backhoe/Backhoe & Loader Combo/Track Backhoe | $27.38 | $0.00 | $27.38 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.