Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Yuma Dam Construction Projects County, Arizona.
Davis-Bacon Heavy
Wage determination AZ20260006, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Boilermaker | $36.07 | $30.59 | $66.66 |
| Intersection Of Central Ave. And Washington St., Phoenix, Az) Zone A: 0-60 Miles- Base Rate Zone B: 61-75 Miles- Base Rate Plus $2.00 Per Hour Zone C: 75-100 Miles- Base Rate Plus $3.00 Per Hour Zone D: 101-200 Miles- Base Rate Plus $3.50 Per Hour Zone E: Over 200 Miles- Base Rate Plus $6.50 Per Hour | $25.95 | $8.49 | $34.44 |
| Piledriverman | $27.38 | $12.44 | $39.82 |
| Carpenter (Including Form Work) | $28.08 | $12.74 | $40.82 |
| Piledriverman | $27.38 | $12.44 | $39.82 |
| Carpenter (Including Form Work) | $28.08 | $12.74 | $40.82 |
| Millwright Zone Definitions For Millwrights: Mileage Shall Be Calculated From The Construction Site To The City Hall In Phoenix Or Tucson, Or To The Workmen'S Residence, Whichever Is Less: Zone 1: 0-30 Miles Zone 2: 31-49 Miles Zone 3: 50 Miles And Over | $40.61 | $17.53 | $58.14 |
| Diver (Wet): Zone 3 Zone Definitions: Mileage Shall Be Calculated From The Construction Site To The City Hall In Phoenix Or Tucson, Or To The Workmen'S Residence, Whichever Is Less: Zone 1: 0-30 Miles Zone 2: 31-49 Miles Zone 3: 50 Miles And Over | $48.29 | $8.93 | $57.22 |
| Diver (Wet): Zone 2 Zone Definitions: Mileage Shall Be Calculated From The Construction Site To The City Hall In Phoenix Or Tucson, Or To The Workmen'S Residence, Whichever Is Less: Zone 1: 0-30 Miles Zone 2: 31-49 Miles Zone 3: 50 Miles And Over | $45.17 | $8.93 | $54.10 |
| Diver (Wet): Zone 1 Zone Definitions: Mileage Shall Be Calculated From The Construction Site To The City Hall In Phoenix Or Tucson, Or To The Workmen'S Residence, Whichever Is Less: Zone 1: 0-30 Miles Zone 2: 31-49 Miles Zone 3: 50 Miles And Over | $43.79 | $8.93 | $52.72 |
| Diver (Standby): Zone 3 Zone Definitions: Mileage Shall Be Calculated From The Construction Site To The City Hall In Phoenix Or Tucson, Or To The Workmen'S Residence, Whichever Is Less: Zone 1: 0-30 Miles Zone 2: 31-49 Miles Zone 3: 50 Miles And Over | $28.49 | $8.93 | $37.42 |
| Diver (Standby): Zone 2 Zone Definitions: Mileage Shall Be Calculated From The Construction Site To The City Hall In Phoenix Or Tucson, Or To The Workmen'S Residence, Whichever Is Less: Zone 1: 0-30 Miles Zone 2: 31-49 Miles Zone 3: 50 Miles And Over | $25.37 | $8.93 | $34.30 |
| Diver (Standby): Zone 1 Zone Definitions: Mileage Shall Be Calculated From The Construction Site To The City Hall In Phoenix Or Tucson, Or To The Workmen'S Residence, Whichever Is Less: Zone 1: 0-30 Miles Zone 2: 31-49 Miles Zone 3: 50 Miles And Over | $22.98 | $8.93 | $31.91 |
| 10 Cu. Yd.), Slip Form Paving Machine (Including Gunnert, Zimmerman And Similar Types), Tower Crane Or Similar Type, Universal Equipment Operator (Backhoe, Clamshell, Dragline, Shovel Etc., Up To 10 Cu. Yd.); Operating Engineers Electrician Including Tower Erector, Lineman & Cable Splicer (Load Side Of Main Disconnect) | $31.39 | $11.72 | $43.11 |
| Skip Loader (All Types With A Rated Capacity Over 3 But Less Than 6 Cu. Yd.), Slip Form (Power Driven Lifting Device For Concrete Forms), Soil Cement Road Mixingmachine (Single Pass Type), Heater And Planer, Tractor (Dozer, Pusher-All), Traveling Pipe-Wrapping Machine, Trenching Machine, Tugger (Two Or More) | $30.31 | $11.72 | $42.03 |
| Chip Spreading Machine, Skiploader (3 Cu. Yd. And Less), Slurry Seal Machine (Moto Paver Driver), Small Self-Propelled Compactor (With Blade)-Backfill, Ditch Operation, Straw Blower, Tractor (D-5 And Under), Tripper, Tugger, Welding Machine, Wheel-Type Tractor (Ford, Ferguson Type With Attachments, Bee Gee Etc.) | $27.04 | $11.72 | $38.76 |
| Repairman; Scaler (Driller); Form Setter And/Or Builder; Welder And/Or Pipelayer Installing Process Piping; Driller-Core, Diamond, Wagon, Air Track, Joy, Mustang, Pr-143, 220 Gardner-Denver, Hydrasonic, Powderman; Water Blaster Operator Note: $0.50 Per Hour Premium For Performing Hazardous Waste Removal | $31.98 | $9.26 | $41.24 |
| Pressman, Installer, Operator; Hand-Guided Trencher And Similarly Operated Equipment; Driller (Jackhammer And/Or Pavement Breaker); Grade Setter (Pipeline); Pipe Layer Including But Not Limited To Non-Metallic Transite And Plastic Pipe, Water Pipe, Sewer Pipe, Drain Pipe, And Underground Tile Pipe And Conduit); Chuck Tender (Except Tunnel) | $30.88 | $9.26 | $40.14 |
| And Electric Tools; Concrete Vibrating Machines, Chain Saw (On Clearing And Grubbing); Hydraulic Jacks And Similar Mechanical Tools Not Separately Herein Classified; Pipe Caulker And/Or Backup Man-Pipeline; Riggers And Signal Man-Pipeline; Pipe Wrapper; Cribber & Shorer (Except Tunnel); Pneumatic Gopher; Pre-Cast Manhole Erector | $29.91 | $9.26 | $39.17 |
| Laborers: Group 2 Concrete Laborer (Belt, Pipe And/Or Hoseman); Cement Mason Tender; Cutting Torch Operator; Power Type Concrete Buggy; Bander; Guinea Chaser | $29.05 | $9.26 | $38.31 |
| Diggers And Installers; Astro Turf Layer; Clean Up-Bull Gang Trackman, Railroad; Chipper (Clearing And Grubbing); Kettleman-Tarman; Spikers, Wrenchers-Creosote Tieman; Floor Sanders-Concrete; Sandblaster (Pot Tender); Powderman Tender; Fine Grader; All Tenders Not Herein Separately Classified; Window Cleaner; Flagger | $27.41 | $9.26 | $36.67 |
| Painter | $25.47 | $8.00 | $33.47 |
| Cement Mason/Concrete Finisher | $28.78 | $9.17 | $37.95 |
| Plumber/Pipefitter (Maricopa, Mohave, Pinal, And Yuma) | $54.15 | $19.80 | $73.95 |
| Electrician | $16.00 | $2.84 | $18.84 |
| Truck Driver Group 5- 6-Axle Dump Footnote: Health & Welfare $1,330.26 Per Month In Additional Fringe Benefits. As Of September 1, 2024 | $27.80 | $1.65 | $29.45 |
| Truck Driver Group 4- 5 Axle Dump, Water Truck 4000 Gal And Over Footnote: Health & Welfare $1,330.26 Per Month In Additional Fringe Benefits. As Of September 1, 2024 | $28.68 | $1.65 | $30.33 |
| Truck Driver Group 3- 4 Axle Dump, Water Truck Drive- (2500 Gal But Less Than 4000 Gal) Footnote: Health & Welfare $1,330.26 Per Month In Additional Fringe Benefits. As Of September 1, 2024 | $27.43 | $1.65 | $29.08 |
| Truck Driver Group 2: 2 Or 3 Axle Dump , Water Truck Under 2500 Gal. Footnote: Health & Welfare $1,330.26 Per Month In Additional Fringe Benefits. As Of September 1, 2024 | $26.95 | $1.65 | $28.60 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.