Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in San Joaquin County, California.
Davis-Bacon Building, Heavy, Highway
Wage determination CA20260018, revision 8, updated 4. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Includes Preparation, Wetting, Stripping, Removal, Scrapping, Vacuuming, Bagging And Disposing Of All Insulation Materials From Mechanical Systems, Whether They Contain Asbestos Or Not (Area 1: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito, San Joaquin, Santa Cruz, Stanislaus, & Toulmne Counties) | $34.56 | $11.40 | $45.96 |
| Asbestos Removal Worker/Hazardous Material Handler: Includes Preparation, Wetting, Stripping, Removal, Scrapping, Vacuuming, Bagging And Disposing Of All Insulation Materials From Mechanical Systems, Whether They Contain Asbestos Or Not (Area 2: Alameda, Contra Costa, San Francisco, San Mateo, & Santa Clara Counties) | $44.73 | $12.75 | $57.48 |
| Asbestos Workers/Insulator: Includes The Application Of All Insulating Materials, Protective Coverings, Coatings, And Finishes To All Types Of Mechanical Systems (Area 1: Alameda, Contra Costa, Monterey, San Benito, San Francisco, San Mateo, Santa Clara, & Santa Cruz) | $84.76 | $25.07 | $109.83 |
| Asbestos Workers/Insulator: Includes The Application Of All Insulating Materials, Protective Coverings, Coatings, And Finishes To All Types Of Mechanical Systems (Area 2: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San Joaquin, Stanislaus, & Tuolumne) | $64.56 | $25.07 | $89.63 |
| Boilermaker (Area 1: Alameda, Contra Costa, San Francisco, San Mateo & Santa Clara Counties) | $49.62 | $41.27 | $90.89 |
| Boilermaker (Area 2: Remaining Counties) | $45.60 | $38.99 | $84.59 |
| Marble Finisher | $42.06 | $19.80 | $61.86 |
| Marble Mason | $61.72 | $30.31 | $92.03 |
| Bricklayer ( 1) Fresno, Kings, Madera, Mariposa, Merced | $51.17 | $25.80 | $76.97 |
| Bricklayer ( 7) San Francisco, San Mateo | $57.02 | $28.50 | $85.52 |
| Bricklayer ( 9) Calaveras, San Joaquin, Stanislaus, Toulumne | $52.76 | $25.01 | $77.77 |
| Bricklayer (16) Monterey, Santa Cruz | $54.18 | $27.82 | $82.00 |
| Bricklayer (8) Alameda, Contra Costa, San Benito, Santa Clara) | $56.94 | $26.28 | $83.22 |
| Terrazzo Finisher | $44.93 | $20.98 | $65.91 |
| Terrazzo Worker/Setter | $60.58 | $29.79 | $90.37 |
| Tile Finisher (Area 1: Alameda, Contra Costa, Monterey, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz) | $37.75 | $19.28 | $57.03 |
| Tile Finisher (Area 2: Calaveras, San Joaquin, Stanislaus, Tuolumne) | $34.76 | $19.22 | $53.98 |
| Tile Finisher (Area 3: Fresno, Kings, Madera, Mariposa, Merced) | $32.68 | $18.32 | $51.00 |
| Tile Layer (Area 1: Alameda, Contra Costa, Monterey, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz) | $59.92 | $22.62 | $82.54 |
| Tile Layer (Area 2: Calaveras, San Joaquin, Stanislaus, Tuolumne) | $55.17 | $22.52 | $77.69 |
| Tile Layer (Area 3: Fresno, Kings, Madera, Mariposa, Merced) | $50.28 | $22.05 | $72.33 |
| Carpenters: Bridge Builder/Highway Carpenter (San Francisco County) | $60.39 | $33.52 | $93.91 |
| Carpenters: Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer (San Francisco County) | $60.54 | $33.52 | $94.06 |
| Carpenters: Journeyman Carpenter (San Francisco County) | $60.39 | $33.52 | $93.91 |
| Carpenters: Millwright (San Francisco County) | $60.49 | $35.11 | $95.60 |
| Less Than 48"" In Height, The Premium Will Be $1.00 Per Foot.) (Work In Combination Of Classifications: Employees Working In Any Combination Of Classifications Within The Diving Crew (Except Dive Supervisor) In A Shift Are Paid In The Classification With The Highest Rate For That Shift.) | $54.10 | $34.69 | $88.79 |
| Other Enclosure Less Than 48"" In Height, The Premium Will Be $1.00 Per Foot.) (Work In Combination Of Classifications: Employees Working In Any Combination Of Classifications Within The Diving Crew (Except Dive Supervisor) In A Shift Are Paid In The Classification With The Highest Rate For That Shift.) | $60.51 | $34.69 | $95.20 |
| Other Enclosure Less Than 48"" In Height, The Premium Will Be $1.00 Per Foot.) (Work In Combination Of Classifications: Employees Working In Any Combination Of Classifications Within The Diving Crew (Except Dive Supervisor) In A Shift Are Paid In The Classification With The Highest Rate For That Shift.) | $59.51 | $34.69 | $94.20 |
| Other Enclosure Less Than 48"" In Height, The Premium Will Be $1.00 Per Foot.) (Work In Combination Of Classifications: Employees Working In Any Combination Of Classifications Within The Diving Crew (Except Dive Supervisor) In A Shift Are Paid In The Classification With The Highest Rate For That Shift.) | $103.62 | $34.69 | $138.31 |
| Less Than 48"" In Height, The Premium Will Be $1.00 Per Foot.) (Work In Combination Of Classifications: Employees Working In Any Combination Of Classifications Within The Diving Crew (Except Dive Supervisor) In A Shift Are Paid In The Classification With The Highest Rate For That Shift.) | $64.51 | $34.69 | $99.20 |
| Less Than 48"" In Height, The Premium Will Be $1.00 Per Foot.) (Work In Combination Of Classifications: Employees Working In Any Combination Of Classifications Within The Diving Crew (Except Dive Supervisor) In A Shift Are Paid In The Classification With The Highest Rate For That Shift.) | $59.51 | $34.69 | $94.20 |
| Piledriver | $54.10 | $34.69 | $88.79 |
| Modular Furniture Installer: Installer (Area 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara Counties) | $28.76 | $22.53 | $51.29 |
| Modular Furniture Installer: Installer (Area 2: Monterey, San Benito, Santa Cruz Counties) | $26.11 | $22.53 | $48.64 |
| Modular Furniture Installer: Installer (Area 3: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San Joaquin, Stanislaus, Tuolumne Counties) | $25.16 | $22.53 | $47.69 |
| Modular Furniture Installer: Lead Installer (Area 2: Monterey, San Benito, Santa Cruz Counties).......$ 29.08 23.03 Modular Furniture Installer: Lead Installer (Area 3: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San Joaquin, Stanislaus, Tuolumne Counties) | $27.96 | $23.03 | $50.99 |
| Modular Furniture Installer: Lead Installer (Area 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara Counties) | $32.21 | $23.03 | $55.24 |
| Modular Furniture Installer: Master Installer (Area 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara Counties) | $36.43 | $23.03 | $59.46 |
| Modular Furniture Installer: Master Installer (Area 2: Monterey, San Benito, Santa Cruz Counties).......$ 32.71 23.03 Modular Furniture Installer: Master Installer (Area 3: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San Joaquin, Stanislaus, Tuolumne Counties) | $31.38 | $23.03 | $54.41 |
| Drywall Installers/Lathers (Area 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara Counties) | $52.65 | $31.26 | $83.91 |
| Drywall Installers/Lathers (Area 2: Monterey, San Benito, Santa Cruz Counties) | $46.77 | $31.26 | $78.03 |
| Drywall Installers/Lathers (Area 3: San Joaquin) | $47.27 | $31.26 | $78.53 |
| Drywall Installers/Lathers (Area 4: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, Stanislaus, Tuolumne Counties) | $45.92 | $31.26 | $77.18 |
| Drywall Stocker/Scrapper (Area 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara Counties) | $26.33 | $18.22 | $44.55 |
| Drywall Stocker/Scrapper (Area 2: Monterey, San Benito, Santa Cruz Counties) | $23.39 | $18.22 | $41.61 |
| Drywall Stocker/Scrapper (Area 3: San Joaquin) | $23.64 | $18.22 | $41.86 |
| Drywall Stocker/Scrapper (Area 4: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, Stanislaus, Tuolumne Counties) | $22.97 | $18.22 | $41.19 |
| Carpenters: Bridge Builder/Highway Carpenter (Contra Costa County) | $52.65 | $30.82 | $83.47 |
| Carpenters: Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer (Contra Costa County) | $52.80 | $30.82 | $83.62 |
| Carpenters: Journeyman Carpenter (Contra Costa County) | $52.65 | $30.82 | $83.47 |
| Carpenters: Millwright (Contra Costa County) | $52.75 | $32.41 | $85.16 |
| Carpenters: Bridge Builder/Highway Carpenter (San Joaquin County) | $52.65 | $30.82 | $83.47 |
| Carpenters: Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer (San Joaquin County) | $46.92 | $30.82 | $77.74 |
| Carpenters: Journeyman Carpenter (San Joaquin County) | $46.77 | $30.82 | $77.59 |
| Carpenters: Millwright (San Joaquin County) | $49.27 | $32.41 | $81.68 |
| Carpenters: Bridge Builder/Highway Carpenter (Calaveras, Mariposa, Merced, Stanislaus And Tuolumne Counties) | $52.65 | $30.82 | $83.47 |
| Carpenters: Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer Calaveras, Mariposa, Merced, Stanislaus And Tuolumne Counties | $45.57 | $30.82 | $76.39 |
| Carpenters: Journeyman Carpenter (Calaveras, Mariposa, Merced, Stanislaus And Tuolumne Counties) | $45.42 | $30.82 | $76.24 |
| Carpenters: Millwright (Calaveras, Mariposa, Merced, Stanislaus And Tuolumne Counties) | $47.92 | $32.41 | $80.33 |
| Carpenters: Bridge Builder/Highway Carpenter (San Mateo County) | $60.39 | $33.52 | $93.91 |
| Carpenters: Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer (San Mateo County) | $60.54 | $33.52 | $94.06 |
| Carpenters: Journeyman Carpenter (San Mateo County) | $60.39 | $33.52 | $93.91 |
| Carpenters: Millwright (San Mateo County) | $60.49 | $35.11 | $95.60 |
| Carpenters: Bridge Builder/Highway Carpenter (Santa Clara County) | $54.85 | $31.49 | $86.34 |
| Carpenters: Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer (Santa Clara County) | $55.00 | $31.49 | $86.49 |
| Carpenters: Journeyman Carpenter (Santa Clara County) | $54.85 | $31.49 | $86.34 |
| Carpenters: Millwright (Santa Clara County) | $54.95 | $33.08 | $88.03 |
| Carpenters: Bridge Builder/Highway Carpenter (San Benito County) | $54.85 | $31.49 | $86.34 |
| Carpenters: Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer (San Benito County) | $49.12 | $31.49 | $80.61 |
| Carpenters: Journeyman Carpenter (San Benito County) | $48.97 | $31.49 | $80.46 |
| Carpenters: Millwright (San Benito County) | $51.47 | $33.08 | $84.55 |
| Carpenters: Bridge Builder/Highway Carpenter (Santa Cruz County) | $54.85 | $31.49 | $86.34 |
| Carpenters: Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer (Santa Cruz County) | $49.12 | $31.49 | $80.61 |
| Carpenters: Journeyman Carpenter (Santa Cruz County) | $48.97 | $31.49 | $80.46 |
| Carpenters: Millwright (Santa Cruz County) | $51.47 | $33.08 | $84.55 |
| Carpenters: Bridge Builder/Highway Carpenter (Monterey County) | $54.85 | $31.49 | $86.34 |
| Carpenters: Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer (Monterey County) | $49.12 | $31.49 | $80.61 |
| Carpenters: Journeyman Carpenter (Monterey County) | $48.97 | $31.49 | $80.46 |
| Carpenters: Millwright (Monterey County) | $51.47 | $33.08 | $84.55 |
| Carpenters: Bridge Builder/Highway Carpenter (Fresno And Madera Counties) | $54.85 | $31.49 | $86.34 |
| Carpenters: Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer (Fresno And Madera Counties) | $47.77 | $31.49 | $79.26 |
| Carpenters: Journeyman Carpenter (Fresno And Madera Counties) | $47.62 | $31.49 | $79.11 |
| Carpenters: Millwright (Fresno And Madera Counties) | $50.12 | $33.08 | $83.20 |
| Carpenters: Bridge Builder/Highway Carpenter (Alameda County) | $54.85 | $31.49 | $86.34 |
| Carpenters: Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer (Alameda County) | $55.00 | $31.49 | $86.49 |
| Carpenters: Journeyman Carpenter (Alameda County) | $54.85 | $31.49 | $86.34 |
| Carpenters: Millwright (Alameda County) | $54.95 | $33.08 | $88.03 |
| Carpenters: Bridge Builder/Highway Carpenter (Kings County) | $54.85 | $31.49 | $86.34 |
| Carpenters: Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer Kings County | $47.77 | $31.49 | $79.26 |
| Carpenters: Journeyman Carpenter (Kings County) | $47.62 | $31.49 | $79.11 |
| Carpenters: Millwright (Kings County) | $50.12 | $33.08 | $83.20 |
| Fire Alarm Work When Installed In Raceways (Including Wire And Cable Pulling), On Projects Which Involve New Or Major Remodel Building Construction, For Which The Conductors For The Fire Alarm System Are Installed In The Conduit, Shall Be Performed By The Inside Electrician.) (San Francisco County) | $58.83 | $31.51 | $90.34 |
| Fire Alarm Work When Installed In Raceways (Including Wire And Cable Pulling), On Projects Which Involve New Or Major Remodel Building Construction, For Which The Conductors For The Fire Alarm System Are Installed In The Conduit, Shall Be Performed By The Inside Electrician.) (San Francisco County) (San Francisco County) | $67.65 | $31.78 | $99.43 |
| Electrician (San Francisco County) | $91.25 | $48.05 | $139.30 |
| Electrician (Fresno, Kings, And Madera Counties) | $50.00 | $30.15 | $80.15 |
| Raceways (Including Wire And Cable Pulling) Shall Be Performed At The Electrician Wage Rate, When Either Of The Following Two (2) Conditions Apply: 1. The Project Involves New Or Major Remodel Building Trades Construction. 2. The Conductors For The Fire Alarm System Are Installed In Conduit.) (Fresno, Kings, Madera) | $45.28 | $28.01 | $73.29 |
| Raceways (Including Wire And Cable Pulling) Shall Be Performed At The Electrician Wage Rate, When Either Of The Following Two (2) Conditions Apply: 1. The Project Involves New Or Major Remodel Building Trades Construction. 2. The Conductors For The Fire Alarm System Are Installed In Conduit.) (Fresno, Kings, Madera) | $52.07 | $28.21 | $80.28 |
| Electrician Zone A : All Of Santa Cruz, Monterey, And San Benito Counties Within 25 Air Miles Of Highway 1 And Dolan Road In Moss Landing, And An Area Extending 5 Miles East And West Of Highway 101 South To The San Luis Obispo County Line (Monterey, San Benito And Santa Cruz Counties) | $70.41 | $33.76 | $104.17 |
| Electrician Zone B: Any Area Outside Of Zone A (Monterey, San Benito And Santa Cruz Counties) | $77.45 | $33.97 | $111.42 |
| (Footnote: Fire Alarm Work When Installed In Raceways (Including Wire And Cable Pulling), On Projects Which Involve New Or Major Remodel Building Construction, For Which The Conductors For The Fire Alarm System Are Installed In The Conduit, Shall Be Performed By The Inside Electrician.) (Monterey, San Benito, And Santa Cruz Counties) | $47.93 | $24.09 | $72.02 |
| (Footnote: Fire Alarm Work When Installed In Raceways (Including Wire And Cable Pulling), On Projects Which Involve New Or Major Remodel Building Construction, For Which The Conductors For The Fire Alarm System Are Installed In The Conduit, Shall Be Performed By The Inside Electrician.) (Monterey, San Benito, And Santa Cruz Counties) | $55.12 | $24.30 | $79.42 |
| Cable Splicer (Contra Costa County) | $74.54 | $36.09 | $110.63 |
| Electrician (Contra Costa County) | $66.26 | $35.84 | $102.10 |
| Fire Alarm Work When Installed In Raceways (Including Wire And Cable Pulling), On Projects Which Involve New Or Major Remodel Building Construction, For Which The Conductors For The Fire Alarm System Are Installed In The Conduit, Shall Be Performed By The Inside Electrician.) (Contra Costa County) | $53.08 | $30.84 | $83.92 |
| Fire Alarm Work When Installed In Raceways (Including Wire And Cable Pulling), On Projects Which Involve New Or Major Remodel Building Construction, For Which The Conductors For The Fire Alarm System Are Installed In The Conduit, Shall Be Performed By The Inside Electrician.) (Contra Costa County) | $61.04 | $31.08 | $92.12 |
| Protected By Permanent Guard Rails At A Distance Of 40 To 60 Ft. From The Ground Or Supporting Structures: To Be Paid One And One-Half Times The Straight-Time Rate Of Pay. Work On Structures Of 60 Ft. Or Over (As Described Above): To Be Paid Twice The Straight-Time Rate Of Pay.) (Santa Clara County) | $104.68 | $49.46 | $154.14 |
| Structures And Where The Workers Are Not Protected By Permanent Guard Rails At A Distance Of 40 To 60 Ft. From The Ground Or Supporting Structures: To Be Paid One And One-Half Times The Straight-Time Rate Of Pay. Work On Structures Of 60 Ft. Or Over (As Described Above): To Be Paid Twice The Straight-Time Rate Of Pay.) (Santa Clara County) | $91.03 | $49.05 | $140.08 |
| Fire Alarm Work When Installed In Raceways (Including Wire And Cable Pulling), On Projects Which Involve New Or Major Remodel Building Construction, For Which The Conductors For The Fire Alarm System Are Installed In The Conduit, Shall Be Performed By The Inside Electrician.) (Santa Clara County) | $58.33 | $31.00 | $89.33 |
| Fire Alarm Work When Installed In Raceways (Including Wire And Cable Pulling), On Projects Which Involve New Or Major Remodel Building Construction, For Which The Conductors For The Fire Alarm System Are Installed In The Conduit, Shall Be Performed By The Inside Electrician.) (Santa Clara County) | $67.08 | $31.26 | $98.34 |
| Cable Splicer (Alameda County) | $91.14 | $51.29 | $142.43 |
| Electrician (Alameda County) | $79.25 | $50.94 | $130.19 |
| Cable Splicer (Calaveras And San Joaquin Counties) | $59.34 | $32.26 | $91.60 |
| Electrician: All Other Work (Calaveras And San Joaquin Counties) | $49.45 | $31.96 | $81.41 |
| Electrician: Tunnel Work (Calaveras And San Joaquin Counties) | $51.92 | $32.04 | $83.96 |
| Fire Alarm Work When Installed In Raceways (Including Wire And Cable Pulling), On Projects Which Involve New Or Major Remodel Building Construction, For Which The Conductors For The Fire Alarm System Are Installed In The Conduit, Shall Be Performed By The Inside Electrician.) (Alameda County) | $58.33 | $31.00 | $89.33 |
| Fire Alarm Work When Installed In Raceways (Including Wire And Cable Pulling), On Projects Which Involve New Or Major Remodel Building Construction, For Which The Conductors For The Fire Alarm System Are Installed In The Conduit, Shall Be Performed By The Inside Electrician.) (Alameda County) | $67.08 | $31.26 | $98.34 |
| Fire Alarm Work When Installed In Raceways (Including Wire And Cable Pulling), On Projects Which Involve New Or Major Remodel Building Construction, For Which The Conductors For The Fire Alarm System Are Installed In The Conduit, Shall Be Performed By The Inside Electrician.) (Calaveras And San Joaquin Counties) | $45.28 | $28.01 | $73.29 |
| Fire Alarm Work When Installed In Raceways (Including Wire And Cable Pulling), On Projects Which Involve New Or Major Remodel Building Construction, For Which The Conductors For The Fire Alarm System Are Installed In The Conduit, Shall Be Performed By The Inside Electrician.) (Calaveras And San Joaquin Counties) | $52.07 | $28.21 | $80.28 |
| Electrician (San Mateo County) | $86.00 | $51.07 | $137.07 |
| Fire Alarm Work When Installed In Raceways (Including Wire And Cable Pulling), On Projects Which Involve New Or Major Remodel Building Construction, For Which The Conductors For The Fire Alarm System Are Installed In The Conduit, Shall Be Performed By The Inside Electrician.) (San Mateo County) | $58.33 | $31.00 | $89.33 |
| Fire Alarm Work When Installed In Raceways (Including Wire And Cable Pulling), On Projects Which Involve New Or Major Remodel Building Construction, For Which The Conductors For The Fire Alarm System Are Installed In The Conduit, Shall Be Performed By The Inside Electrician.) (San Mateo County) | $67.08 | $31.26 | $98.34 |
| Electrician (Mariposa, Merced, Stanislaus And Tuolumne Counties) Cable Splicer = 110% Of Journeyman Electrician | $48.50 | $30.09 | $78.59 |
| Raceways (Including Wire And Cable Pulling), On Projects Which Involve New Or Major Remodel Building Construction, For Which The Conductors For The Fire Alarm System Are Installed In The Conduit, Shall Be Performed By The Inside Electrician.) (Mariposa, Merced, Stanislaus And Tuolumne Counties) | $45.28 | $28.01 | $73.29 |
| Raceways (Including Wire And Cable Pulling), On Projects Which Involve New Or Major Remodel Building Construction, For Which The Conductors For The Fire Alarm System Are Installed In The Conduit, Shall Be Performed By The Inside Electrician.) (Mariposa, Merced, Stanislaus And Tuolumne Counties) | $52.07 | $28.21 | $80.28 |
| Line Construction: (1) Lineman; Cable Splicer (Holidays: New Year'S Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day And Day After Thanksgiving, Christmas Day) | $70.16 | $24.71 | $94.87 |
| (Operates Crawler Tractors, Commercial Motor Vehicles, Backhoes, Trenchers, Cranes (50 Tons And Below), Overhead & Underground Distribution Line Equipment) (Holidays: New Year'S Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day And Day After Thanksgiving, Christmas Day) | $53.30 | $22.26 | $75.56 |
| Line Construction: (3) Groundman (Holidays: New Year'S Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day And Day After Thanksgiving, Christmas Day) | $40.76 | $21.76 | $62.52 |
| Contributes 8% Of Regular Hourly Rate As Vacation Pay Credit For Employees With More Than 5 Years Of Service, And 6% For 6 Months To 5 Years Of Service. B. Paid Holidays: New Year'S Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Friday After Thanksgiving, And Christmas Day.) | $84.05 | $38.44 | $122.49 |
| Operator: Power Equipment, Piledriving: Group 1 (Lifting Devices)- Derrick Barge Pedestal Mounted Over 100 Tons; Clamshell Over 7 Cu. Yds.; Self-Propelled Boom-Tyhpe Lifting Device Over 100 Tons; Truck Crane Or Crawler, Land Or Barge Mounted Over 100 Tons | $52.64 | $31.15 | $83.79 |
| Operator: Power Equipment, Piledriving: Group 1 (Oiler)- Derrick Barge Pedestal Mounted Over 100 Tons; Clamshell Over 7 Cu. Yds.; Self-Propelled Boom-Tyhpe Lifting Device Over 100 Tons; Truck Crane Or Crawler, Land Or Barge Mounted Over 100 Tons | $43.38 | $31.15 | $74.53 |
| Operator: Power Equipment, Piledriving: Group 1 (Truck Crane Oiler)- Derrick Barge Pedestal Mounted Over 100 Tons; Clamshell Over 7 Cu. Yds.; Self-Propelled Boom-Tyhpe Lifting Device Over 100 Tons; Truck Crane Or Crawler, Land Or Barge Mounted Over 100 Tons | $45.66 | $31.15 | $76.81 |
| (Lifting Devices)- Derrick Barge Pedestal Mounted 45 Tons To And Including 100 Tons; Clamshell Up To And Including 7 Cu. Yds.; Self-Propelled Boom-Type Lifting Device Over 45 Tons; Truck Crane Or Crawler, Land Or Barge Mounted, Over 45 Tons Up To And Including 100 Tons; Fundex F-12 Hydraulic Pile Rig | $50.82 | $31.15 | $81.97 |
| (Oiler)- Derrick Barge Pedestal Mounted 45 Tons To And Including 100 Tons; Clamshell Up To And Including 7 Cu. Yds.; Self-Propelled Boom-Type Lifting Device Over 45 Tons; Truck Crane Or Crawler, Land Or Barge Mounted, Over 45 Tons Up To And Including 100 Tons; Fundex F-12 Hydraulic Pile Rig | $43.11 | $31.15 | $74.26 |
| (Truck Crane Oiler)- Derrick Barge Pedestal Mounted 45 Tons To And Including 100 Tons; Clamshell Up To And Including 7 Cu. Yds.; Self-Propelled Boom-Type Lifting Device Over 45 Tons; Truck Crane Or Crawler, Land Or Barge Mounted, Over 45 Tons Up To And Including 100 Tons; Fundex F-12 Hydraulic Pile Rig | $45.41 | $31.15 | $76.56 |
| Operator: Power Equipment, Piledriving: Group 3 (Lifting Devices)- Derrick Barge Pedestal Mounted Under 45 Tons; Self-Propelled Boom-Type Lifting Device 45 Tons And Under; Skid/Scow Piledriver, Any Tonnage; Truck Crane Or Crawler, Land Or Barge Mounted 45 Tons And Under | $49.14 | $31.15 | $80.29 |
| Operator: Power Equipment, Piledriving: Group 3 (Oiler)- Derrick Barge Pedestal Mounted Under 45 Tons; Self-Propelled Boom-Type Lifting Device 45 Tons And Under; Skid/Scow Piledriver, Any Tonnage; Truck Crane Or Crawler, Land Or Barge Mounted 45 Tons And Under | $42.89 | $31.15 | $74.04 |
| Operator: Power Equipment, Piledriving: Group 3 (Truck Crane Oiler)- Derrick Barge Pedestal Mounted Under 45 Tons; Self-Propelled Boom-Type Lifting Device 45 Tons And Under; Skid/Scow Piledriver, Any Tonnage; Truck Crane Or Crawler, Land Or Barge Mounted 45 Tons And Under | $45.12 | $31.15 | $76.27 |
| Operator: Power Equipment, Piledriving: Group 4 (Lifting Devices)- Assistant Operator In Lieu Of Assistant To Engineer; Forklift, 10 Tons And Over; Heavy-Duty Repair Person/Welder | $47.37 | $31.15 | $78.52 |
| Operator: Power Equipment, Piledriving: Group 5 (Lifting Devices)- Deck Engineer | $44.73 | $31.15 | $75.88 |
| Operator: Power Equipment, Piledriving: Group 6 (Lifting Devices)- Deckhand; Fire Tender | $42.50 | $31.15 | $73.65 |
| Southwestern Part), San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $68.59 | $32.53 | $101.12 |
| Southwestern Part), San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $43.79 | $31.15 | $74.94 |
| San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $46.08 | $31.15 | $77.23 |
| Southwestern Part), San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $66.08 | $32.53 | $98.61 |
| Southwestern Part), San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $42.83 | $31.15 | $73.98 |
| (Except Southwestern Part), San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $45.07 | $31.15 | $76.22 |
| Southwestern Part), San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $64.34 | $32.53 | $96.87 |
| Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $59.98 | $32.53 | $92.51 |
| Southwestern Part), San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $42.55 | $31.15 | $73.70 |
| Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $44.83 | $31.15 | $75.98 |
| Southwestern Part), San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $61.30 | $32.53 | $93.83 |
| Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $65.43 | $32.53 | $97.96 |
| Southwestern Part), San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $63.95 | $32.53 | $96.48 |
| (Except Southwestern Part), San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $62.57 | $32.53 | $95.10 |
| Southwestern Part), San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $61.30 | $32.53 | $93.83 |
| San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $59.98 | $32.53 | $92.51 |
| San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $58.84 | $32.53 | $91.37 |
| Southwestern Part), San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $57.70 | $32.53 | $90.23 |
| Southwestern Part), San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $55.49 | $32.53 | $88.02 |
| (Oiler)- Crane Over 100 Tons; Derrick Over 100 Tons; Self-Propelled Boom-Type Lifting Device Over 100 Tons............................................$ 43.72 31.15 Operator: Power Equipment, Steel Erection: Group 1 (Truck Crane Oiler)- Crane Over 100 Tons; Derrick Over 100 Tons; Self-Propelled Boom-Type Lifting Device Over 100 Tons | $45.95 | $31.15 | $77.10 |
| Operator: Power Equipment, Steel Erection: Group 2 (Cranes)- Crane Over 45 Tons To 100 Tons; Derrick Under 100 Tons; Self-Propelled Boom-Type Lifting Device Over 45 Tons To 100 Tons; Tower Crane | $67.04 | $32.53 | $99.57 |
| Operator: Power Equipment, Steel Erection: Group 2 (Oiler)- Crane Over 45 Tons To 100 Tons; Derrick Under 100 Tons; Self-Propelled Boom-Type Lifting Device Over 45 Tons To 100 Tons; Tower Crane | $43.45 | $31.15 | $74.60 |
| Operator: Power Equipment, Steel Erection: Group 2 (Truck Crane Oiler)- Crane Over 45 Tons To 100 Tons; Derrick Under 100 Tons; Self-Propelled Boom-Type Lifting Device Over 45 Tons To 100 Tons; Tower Crane | $45.73 | $31.15 | $76.88 |
| Operator: Power Equipment, Steel Erection: Group 3 (Cranes)- Crane, 45 Tons And Under; Self-Propelled Boom-Type Lifting Device, 45 Tons And Under | $65.56 | $32.53 | $98.09 |
| Operator: Power Equipment, Steel Erection: Group 3 (Hydraulic)- Crane, 45 Tons And Under; Self-Propelled Boom-Type Lifting Device, 45 Tons And Under | $45.07 | $31.15 | $76.22 |
| Operator: Power Equipment, Steel Erection: Group 3 (Oiler)- Crane, 45 Tons And Under; Self-Propelled Boom-Type Lifting Device, 45 Tons And Under | $43.23 | $31.15 | $74.38 |
| Operator: Power Equipment, Steel Erection: Group 3 (Truck Crane Oiler)- Crane, 45 Tons And Under; Self-Propelled Boom-Type Lifting Device, 45 Tons And Under | $45.46 | $31.15 | $76.61 |
| Operator: Power Equipment, Steel Erection: Group 4 (Cranes)- Chicago Boom; Forklift, 10 Tons And Over; Heavy-Duty Repair Person/Welder | $63.54 | $32.53 | $96.07 |
| Operator: Power Equipment, Steel Erection: Group 5 (Cranes)- Boom Cat | $62.24 | $32.53 | $94.77 |
| Southwestern Part), San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $63.06 | $32.53 | $95.59 |
| Southwestern Part), San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $65.53 | $32.53 | $98.06 |
| Southwestern Part), San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $61.80 | $32.53 | $94.33 |
| Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $60.47 | $32.53 | $93.00 |
| (Except Southwestern Part), San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $59.33 | $32.53 | $91.86 |
| Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $58.19 | $32.53 | $90.72 |
| Southwestern Part), San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $62.96 | $32.53 | $95.49 |
| San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $65.43 | $32.53 | $97.96 |
| San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $61.70 | $32.53 | $94.23 |
| (Except Southwestern Part), San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $60.37 | $32.53 | $92.90 |
| Southwestern Part), San Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $59.23 | $32.53 | $91.76 |
| Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $58.09 | $32.53 | $90.62 |
| Benito, San Fancisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, Tuolumne (Except Eastern Part) Counties. Area 2: Calaveras (Eastern Part), Fresno (Eastern Part), Madera (Eastern Part), Mariposa (Eastern Part), Monterey (Southwestern Part), Tuolumne (Eastern Part) Counties) | $66.96 | $32.53 | $99.49 |
| Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, And Stanislaus Counties. Calaveras County-Except Eastern Part. Fresno County-Except Eastern Part. Madera County-Except Eastern Part. Mariposa County-Except Eastern Part. Monterrey County-Except Southwestern Part. Tuolumne County-Except Eastern Part | $60.61 | $39.55 | $100.16 |
| Dredging: Clamshell & Dipper Dredging; Hydraulic Suction Dredging- (1) Leverman. Area 2: Calaveras County-Eastern Part; Fresno County-Eastern Part; Madera County-Eastern Part; Mariposa County-Eastern Part; Monterrey County-Southwestern Part; Tuolumne County-Eastern Part | $62.61 | $39.55 | $102.16 |
| Dredging: Clamshell & Dipper Dredging; Hydraulic Suction Dredging- (2) Dredge Dozer; Heavy Duty Repairman. Area 2: Calaveras County-Eastern Part; Fresno County-Eastern Part; Madera County-Eastern Part; Mariposa County-Eastern Part; Monterrey County-Southwestern Part; Tuolumne County-Eastern Part | $57.65 | $39.55 | $97.20 |
| Merced, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, And Stanislaus Counties. Calaveras County-Except Eastern Part. Fresno County-Except Eastern Part. Madera County-Except Eastern Part. Mariposa County-Except Eastern Part. Monterrey County-Except Southwestern Part. Tuolumne County-Except Eastern Part | $55.65 | $39.55 | $95.20 |
| Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, And Stanislaus Counties. Calaveras County-Except Eastern Part. Fresno County-Except Eastern Part. Madera County-Except Eastern Part. Mariposa County-Except Eastern Part. Monterrey County-Except Southwestern Part. Tuolumne County-Except Eastern Part | $54.53 | $39.55 | $94.08 |
| Suction Dredging- (3) Booster Pump Operator; Deck Engineer; Deck Mate; Dredge Tender; Winch Operator. Area 2: Calaveras County-Eastern Part; Fresno County-Eastern Part; Madera County-Eastern Part; Mariposa County-Eastern Part; Monterrey County-Southwestern Part; Tuolumne County-Eastern Part | $56.53 | $39.55 | $96.08 |
| Joaquin, San Mateo, Santa Clara, Santa Cruz, And Stanislaus Counties. Calaveras County-Except Eastern Part. Fresno County-Except Eastern Part. Madera County-Except Eastern Part. Mariposa County-Except Eastern Part. Monterrey County-Except Southwestern Part. Tuolumne County-Except Eastern Part | $51.23 | $39.55 | $90.78 |
| Dredging: Clamshell & Dipper Dredging; Hydraulic Suction Dredging- (4) Bargeman; Deckhand; Fireman; Leveehand; Oiler. Area 2: Calaveras County-Eastern Part; Fresno County-Eastern Part; Madera County-Eastern Part; Mariposa County-Eastern Part; Monterrey County-Southwestern Part; Tuolumne County-Eastern Part | $53.23 | $39.55 | $92.78 |
| Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, And Stanislaus Counties. Calavaras County-Except Eastern Part. Fresno County-Except Eastern Part. Madera County-Except Eastern Part. Mariposal-Except Eastern Part. Monterey County-Except Southwestern Part. Tuolumne County-Except Eastern Part.) | $55.85 | $28.56 | $84.41 |
| Finish Grade Work Regardless Of Equipment Used, And All Equipment With A Rating More Than 65 Hp. (Area 2: Calaveras County-Eastern Part. Fresno County-Eastern Part. Madera County-Eastern Part. Mariposa County-Eastern Part. Monterey County-Southwestern Part. Tuolumne County-Eastern Part.) | $57.85 | $28.56 | $86.41 |
| Kings, Merced, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, And Stanislaus Counties. Calavaras County-Except Eastern Part. Fresno County-Except Eastern Part. Madera County-Except Eastern Part. Mariposal-Except Eastern Part. Monterey County-Except Southwestern Part. Tuolumne County-Except Eastern Part.) | $52.25 | $28.56 | $80.81 |
| Roller, Rubber-Tired And Track Earthmoving Equipment, Skiploader, Straw Blowers, And Trencher 31 Hp Up To 65 Hp. (Area 2: Calaveras County-Eastern Part. Fresno County-Eastern Part. Madera County-Eastern Part. Mariposa County-Eastern Part. Monterey County-Southwestern Part. Tuolumne County-Eastern Part.) | $54.25 | $28.56 | $82.81 |
| Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, And Stanislaus Counties. Calavaras County-Except Eastern Part. Fresno County-Except Eastern Part. Madera County-Except Eastern Part. Mariposal-Except Eastern Part. Monterey County-Except Southwestern Part. Tuolumne County-Except Eastern Part.) | $47.64 | $28.56 | $76.20 |
| Group 3- Landscape Utility Operator: Small Rubber-Tired Tractor, Trencher Under 31 Hp. (Area 2: Calaveras County-Eastern Part. Fresno County-Eastern Part. Madera County-Eastern Part. Mariposa County-Eastern Part. Monterey County-Southwestern Part. Tuolumne County-Eastern Part.) | $49.64 | $28.56 | $78.20 |
| Facility-Sealy, Vendenberg Afb. $4.00 Additional Per Hour At The Following Locations: Army Deense Language Institute-Monterey, Fallon Air Base, Naval Post Graduate School-Monterey, Yermo Marine Corps Logistics Center. $2.00 Additional Per Hour At The Following Locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station-Two Rock | $45.78 | $26.51 | $72.29 |
| Vendenberg Afb. $4.00 Additional Per Hour At The Following Locations: Army Deense Language Institute-Monterey, Fallon Air Base, Naval Post Graduate School-Monterey, Yermo Marine Corps Logistics Center. $2.00 Additional Per Hour At The Following Locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station-Two Rock | $55.33 | $35.15 | $90.48 |
| Vendenberg Afb. $4.00 Additional Per Hour At The Following Locations: Army Deense Language Institute-Monterey, Fallon Air Base, Naval Post Graduate School-Monterey, Yermo Marine Corps Logistics Center. $2.00 Additional Per Hour At The Following Locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station-Two Rock | $45.78 | $26.51 | $72.29 |
| Facility-Sealy, Vendenberg Afb. $4.00 Additional Per Hour At The Following Locations: Army Deense Language Institute-Monterey, Fallon Air Base, Naval Post Graduate School-Monterey, Yermo Marine Corps Logistics Center. $2.00 Additional Per Hour At The Following Locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station-Two Rock | $55.83 | $35.15 | $90.98 |
| Following Locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards Afb, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms-Marine Corps, U.S. Marine Base-Barstow, U.S. Naval Air Facility-Sealy, Vendenberg Afb | $4.00 | $0.00 | $4.00 |
| Additional Per Hour At The Following Locations: Army Deense Language Institute-Monterey, Fallon Air Base, Naval Post Graduate School-Monterey, Yermo Marine Corps Logistics Center. $2.00 Additional Per Hour At The Following Locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station-Two Rock | $45.78 | $26.51 | $72.29 |
| Vendenberg Afb. $4.00 Additional Per Hour At The Following Locations: Army Deense Language Institute-Monterey, Fallon Air Base, Naval Post Graduate School-Monterey, Yermo Marine Corps Logistics Center. $2.00 Additional Per Hour At The Following Locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station-Two Rock | $50.70 | $35.15 | $85.85 |
| Encapsulation, Enclosure And Disposal Of Asbestos-Containing Materials By Hand Or With Equipment Or Machinery; Scaffolding; Fabrication Of Temporary Wooden Barriers; And Assembly Of Decontamination Stations. (Area 1: Alameda, Contra Costa, San Francisco, San Mateo, And Santa Clara Counties) | $39.15 | $30.03 | $69.18 |
| Asbestos-Containing Materials By Hand Or With Equipment Or Machinery; Scaffolding; Fabrication Of Temporary Wooden Barriers; And Assembly Of Decontamination Stations. (Area 2: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito, San Joaquin, Stanislaus, And Tuolumne Counties) | $38.15 | $30.03 | $68.18 |
| Laborer, Traffic Control/Lane Closure: Escort Driver, Flag Person (Calaveras And San Joaquin Counties) | $36.26 | $27.30 | $63.56 |
| Laborer, Traffic Control/Lane Closure: Traffic Control Person I- Layout Of Traffic Control, Crash Cushions, Construction Area And Roadside Signage. (Calaveras And San Joaquin Counties) | $36.56 | $27.30 | $63.86 |
| Laborer, Traffic Control/Lane Closure: Traffic Control Person Ii- Installation And Removal Of Temporary/Permanent Signs, Markers, Delineators And Crash Cushions. (Calaveras And San Joaquin Counties) | $34.06 | $27.30 | $61.36 |
| Laborer: Mason Tender-Brick (San Joaquin County) | $36.29 | $25.55 | $61.84 |
| Tunnel And Shaft Laborers: Group 1- Diamond Driller; Groundmen; Gunite And Shotcrete Nozzlemen | $45.89 | $27.72 | $73.61 |
| Tunnel And Shaft Laborers: Group 2- Rodmen; Shaft Work & Raise (Below Actual Or Excavated Ground Level) | $45.66 | $27.72 | $73.38 |
| Erector, Tunnel Muck Hauler, Steel Form Raiser And Setter; Timberman, Retimberman (Wood Or Steel Or Substitute Materials Therefore); Tugger (For Tunnel Laborer Work); Cable Tender; Chuck Tender; Powderman - Primer House | $45.41 | $27.72 | $73.13 |
| Tunnel And Shaft Laborers: Group 4- Vibrator Operator, Pavement Breaker; Bull Gang - Muckers, Trackmen; Concrete Crew - Includes Rodding And Spreading, Dumpmen (Any Method) | $44.96 | $27.72 | $72.68 |
| Tunnel And Shaft Laborers: Group 5- Grout Crew; Reboundman; Swamper/ Brakeman | $44.42 | $27.72 | $72.14 |
| Tunnel And Shaft Laborers: Shotcrete Specialist | $46.41 | $27.72 | $74.13 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed.(Calaveras And San Joaquin Counties) | $30.37 | $29.89 | $60.26 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Calaveras And San Joaquin Counties) | $38.85 | $29.89 | $68.74 |
| All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Calaveras And San Joaquin Counties) | $38.15 | $29.89 | $68.04 |
| Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Calaveras And San Joaquin Counties) | $38.37 | $29.89 | $68.26 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Calaveras And San Joaquin Counties) | $38.20 | $29.89 | $68.09 |
| All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Calaveras And San Joaquin Counties) | $38.70 | $29.89 | $68.59 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Calaveras And San Joaquin Counties) | $38.00 | $29.89 | $67.89 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Calaveras And San Joaquin Counties) | $37.90 | $29.89 | $67.79 |
| All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Calaveras And San Joaquin Counties) | $31.59 | $29.89 | $61.48 |
| Laborer, Gunite: Group 1- Structural Nozzleman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Calaveras And San Joaquin Counties) | $39.11 | $29.89 | $69.00 |
| Laborer, Gunite: Group 2- Nozzleman, Gunman, Potman, Groundman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Calaveras And San Joaquin Counties) | $38.61 | $29.89 | $68.50 |
| Laborer, Gunite: Group 3- Reboundman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Calaveras And San Joaquin Counties) | $38.02 | $29.89 | $67.91 |
| Laborer, Gunite: Group 4- Guinte Laborer. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Calaveras And San Joaquin Counties) | $37.90 | $29.89 | $67.79 |
| Laborer, Wrecking: Group 1- Skilled Wrecker (Removing And Salvaging Of Sash, Windows, And Materials). Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Calaveras And San Joaquin Counties) | $38.15 | $29.89 | $68.04 |
| Laborer, Wrecking: Group 2- Semi-Skilled Wrecker (Salvaging Of Other Building Materials). Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Calaveras And San Joaquin Counties) | $38.00 | $29.89 | $67.89 |
| Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Calaveras And San Joaquin Counties) | $37.90 | $29.89 | $67.79 |
| Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Calaveras And San Joaquin Counties) | $31.59 | $29.89 | $61.48 |
| Laborer, Plaster Tender. Work On A Swing Stage Scaffold: $1.00 Per Hour Additional. (Calaveras And San Joaquin Counties) | $39.77 | $28.54 | $68.31 |
| Laborer, Traffic Control/Lane Closure: Escort Driver, Flag Person (San Francisco And San Mateo Counties) | $37.26 | $27.30 | $64.56 |
| Laborer, Traffic Control/Lane Closure: Traffic Control Person I- Layout Of Traffic Control, Crash Cushions, Construction Area And Roadside Signage. (San Francisco And San Mateo Counties) | $37.56 | $27.30 | $64.86 |
| Laborer, Traffic Control/Lane Closure: Traffic Control Person Ii- Installation And Removal Of Temporary/Permanent Signs, Markers, Delineators And Crash Cushions. (San Francisco And San Mateo Counties) | $35.06 | $27.30 | $62.36 |
| Tunnel And Shaft Laborers: Group 1- Diamond Driller; Groundmen; Gunite And Shotcrete Nozzlemen (San Francisco And San Mateo Counties) | $45.89 | $27.72 | $73.61 |
| Tunnel And Shaft Laborers: Group 2- Rodmen; Shaft Work & Raise (Below Actual Or Excavated Ground Level) (San Francisco And San Mateo Counties) | $45.66 | $27.72 | $73.38 |
| Erector, Tunnel Muck Hauler, Steel Form Raiser And Setter; Timberman, Retimberman (Wood Or Steel Or Substitute Materials Therefore); Tugger (For Tunnel Laborer Work); Cable Tender; Chuck Tender; Powderman - Primer House (San Francisco And San Mateo Counties) | $45.41 | $27.72 | $73.13 |
| Tunnel And Shaft Laborers: Group 4- Vibrator Operator, Pavement Breaker; Bull Gang - Muckers, Trackmen; Concrete Crew - Includes Rodding And Spreading, Dumpmen (Any Method) (San Francisco And San Mateo Counties) | $44.96 | $27.72 | $72.68 |
| Tunnel And Shaft Laborers: Group 5- Grout Crew; Reboundman; Swamper/ Brakeman (San Francisco And San Mateo Counties) | $44.42 | $27.72 | $72.14 |
| Tunnel And Shaft Laborers: Shotcrete Specialist (San Francisco And San Mateo Counties) | $46.41 | $27.72 | $74.13 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (San Francisco And San Mateo Counties) | $31.37 | $23.20 | $54.57 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (San Francisco And San Mateo Counties) | $37.20 | $27.30 | $64.50 |
| All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (San Francisco And San Mateo Counties) | $36.50 | $27.30 | $63.80 |
| Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (San Francisco And San Mateo Counties) | $36.72 | $27.30 | $64.02 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (San Francisco And San Mateo Counties) | $36.55 | $27.30 | $63.85 |
| All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (San Francisco And San Mateo Counties) | $37.05 | $27.30 | $64.35 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (San Francisco And San Mateo Counties) | $36.35 | $27.30 | $63.65 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (San Francisco And San Mateo Counties) | $36.25 | $27.30 | $63.55 |
| All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (San Francisco And San Mateo Counties) | $29.94 | $27.30 | $57.24 |
| Laborer, Gunite: Group 1- Structural Nozzleman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (San Francisco And San Mateo Counties) | $37.46 | $27.30 | $64.76 |
| Laborer, Gunite: Group 2- Nozzleman, Gunman, Potman, Groundman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (San Francisco And San Mateo Counties) | $36.96 | $27.30 | $64.26 |
| Laborer, Gunite: Group 3- Reboundman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (San Francisco And San Mateo Counties) | $36.37 | $27.30 | $63.67 |
| Laborer, Gunite: Group 4- Guinte Laborer. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (San Francisco And San Mateo Counties) | $36.25 | $27.30 | $63.55 |
| Laborer, Wrecking: Group 1- Skilled Wrecker (Removing And Salvaging Of Sash, Windows, And Materials). Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (San Francisco And San Mateo Counties) | $36.50 | $27.30 | $63.80 |
| Laborer, Wrecking: Group 2- Semi-Skilled Wrecker (Salvaging Of Other Building Materials). Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (San Francisco And San Mateo Counties) | $36.35 | $27.30 | $63.65 |
| Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (San Francisco And San Mateo Counties) | $36.25 | $27.30 | $63.55 |
| Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (San Francisco And San Mateo Counties) | $29.94 | $27.30 | $57.24 |
| Mason Tender, Brick. Footnotes: Underground Work Such As Sewers, Manholes, Catch Basins, Sewer Pipes, Telephone Conduits, Tunnels And Cut Trenches: $5.00 Per Day Additional. Work In Live Sewage: $2.50 Per Day Additional. (San Francisco And San Mateo Counties) | $37.05 | $27.45 | $64.50 |
| Plaster Tender. Work On A Swing Stage Scaffold: $1.00 Per Hour Additional. (San Francisco And San Mateo Counties) | $41.93 | $30.32 | $72.25 |
| Laborer, Traffic Control/Lane Closure: Escort Driver, Flag Person (Monterey, San Benito, And Santa Cruz Counties) | $36.26 | $27.30 | $63.56 |
| Laborer, Traffic Control/Lane Closure: Escort Driver, Flag Person (Santa Calara County) | $37.26 | $27.30 | $64.56 |
| Laborer, Traffic Control/Lane Closure: Traffic Control Person I- Layout Of Traffic Control, Crash Cushions, Construction Area And Roadside Signage. (Monterey, San Benito, And Santa Cruz Counties) | $36.56 | $27.30 | $63.86 |
| Laborer, Traffic Control/Lane Closure: Traffic Control Person I- Layout Of Traffic Control, Crash Cushions, Construction Area And Roadside Signage. (Santa Calara County) | $37.56 | $27.30 | $64.86 |
| Laborer, Traffic Control/Lane Closure: Traffic Control Person Ii- Installation And Removal Of Temporary/Permanent Signs, Markers, Delineators, And Crash Cushions. (Monterey, San Benito, And Santa Cruz Counties) | $34.06 | $27.30 | $61.36 |
| Laborer, Traffic Control/Lane Closure: Traffic Control Person Ii- Installation And Removal Of Temporary/Permanent Signs, Markers, Delineators, And Crash Cushions. (Santa Calara County) | $35.06 | $27.30 | $62.36 |
| Tunnel And Shaft Laborers: Group 1- Diamond Driller; Groundmen; Gunite And Shotcrete Nozzlemen. (Monterey, San Benito, Santa Clara, And Santa Cruz Counties) | $45.89 | $27.72 | $73.61 |
| Tunnel And Shaft Laborers: Group 2- Rodmen; Shaft Work & Raise (Below Actual Or Excavated Ground Level). (Monterey, San Benito, Santa Clara, And Santa Cruz Counties) | $45.66 | $27.72 | $73.38 |
| Erector, Tunnel Muck Hauler, Steel Form Raiser And Setter; Timberman, Retimberman (Wood Or Steel Or Substitute Materials Therefore); Tugger (For Tunnel Laborer Work); Cable Tender; Chuck Tender; Powderman - Primer House. (Monterey, San Benito, Santa Clara, And Santa Cruz Counties) | $45.41 | $27.72 | $73.13 |
| Tunnel And Shaft Laborers: Group 4- Vibrator Operator, Pavement Breaker; Bull Gang - Muckers, Trackmen; Concrete Crew - Includes Rodding And Spreading, Dumpmen (Any Method). (Monterey, San Benito, Santa Clara, And Santa Cruz Counties) | $44.96 | $27.72 | $72.68 |
| Tunnel And Shaft Laborers: Group 5- Grout Crew; Reboundman; Swamper/ Brakeman. (Monterey, San Benito, Santa Clara, And Santa Cruz Counties) | $44.42 | $27.72 | $72.14 |
| Tunnel And Shaft Laborers: Shotcrete Specialist. (Monterey, San Benito, Santa Clara, And Santa Cruz Counties) | $46.41 | $27.72 | $74.13 |
| Laborer: Mason Tender-Brick. (Monterey And San Benito Counties) | $36.29 | $25.55 | $61.84 |
| Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Monterey, San Benito, And Santa Cruz Counties) | $36.08 | $27.30 | $63.38 |
| Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Monterey, San Benito, And Santa Cruz Counties) | $36.20 | $27.30 | $63.50 |
| All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Monterey, San Benito, And Santa Cruz Counties) | $35.50 | $27.30 | $62.80 |
| Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Monterey, San Benito, And Santa Cruz Counties) | $35.72 | $27.30 | $63.02 |
| Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Monterey, San Benito, And Santa Cruz Counties) | $35.55 | $27.30 | $62.85 |
| All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Monterey, San Benito, And Santa Cruz Counties) | $36.05 | $27.30 | $63.35 |
| Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Monterey, San Benito, And Santa Cruz Counties) | $35.35 | $27.30 | $62.65 |
| Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Monterey, San Benito, And Santa Cruz Counties) | $35.25 | $27.30 | $62.55 |
| All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Monterey, San Benito, And Santa Cruz Counties) | $28.94 | $27.30 | $56.24 |
| Laborer, Gunite: Group 1- Structural Nozzleman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Monterey, San Benito, And Santa Cruz Counties) | $36.46 | $27.30 | $63.76 |
| Laborer, Gunite: Group 2- Nozzleman, Gunman, Potman, Groundman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Monterey, San Benito, And Santa Cruz Counties) | $35.96 | $27.30 | $63.26 |
| Laborer, Gunite: Group 3- Reboundman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Monterey, San Benito, And Santa Cruz Counties) | $35.37 | $27.30 | $62.67 |
| Laborer, Gunite: Group 4- Guinte Laborer. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Monterey, San Benito, And Santa Cruz Counties) | $35.25 | $27.30 | $62.55 |
| Laborer, Wrecking: Group 1- Skilled Wrecker (Removing And Salvaging Of Sash, Windows, And Materials). Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Monterey, San Benito, And Santa Cruz Counties) | $35.50 | $27.30 | $62.80 |
| Laborer, Wrecking: Group 2- Semi-Skilled Wrecker (Salvaging Of Other Building Materials). Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Monterey, San Benito, And Santa Cruz Counties) | $35.35 | $27.30 | $62.65 |
| Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Monterey, San Benito, And Santa Cruz Counties) | $35.25 | $27.30 | $62.55 |
| Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Monterey, San Benito, And Santa Cruz Counties) | $28.94 | $27.30 | $56.24 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Santa Clara County) | $37.08 | $27.30 | $64.38 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Santa Clara County) | $37.20 | $27.30 | $64.50 |
| Receive $0.25 Per Hour Above Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Santa Clara County) | $36.50 | $27.30 | $63.80 |
| Per Hour Above Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Santa Clara County) | $36.72 | $27.30 | $64.02 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Santa Clara County) | $36.55 | $27.30 | $63.85 |
| Receive $0.25 Per Hour Above Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Santa Clara County) | $37.05 | $27.30 | $64.35 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Santa Clara County) | $36.35 | $27.30 | $63.65 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Santa Clara County) | $36.25 | $27.30 | $63.55 |
| Receive $0.25 Per Hour Above Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Santa Clara County) | $29.94 | $27.30 | $57.24 |
| Laborer, Gunite: Group 1- Structural Nozzleman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Santa Clara County) | $37.46 | $27.30 | $64.76 |
| Laborer, Gunite: Group 2- Nozzleman, Gunman, Potman, Groundman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Santa Clara County) | $36.96 | $27.30 | $64.26 |
| Laborer, Gunite: Group 3- Reboundman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Santa Clara County) | $36.37 | $27.30 | $63.67 |
| Laborer, Gunite: Group 4- Guinte Laborer. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Santa Clara County) | $36.25 | $27.30 | $63.55 |
| Laborer, Wrecking: Group 1- Skilled Wrecker (Removing And Salvaging Of Sash, Windows, And Materials). Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Santa Clara County) | $36.50 | $27.30 | $63.80 |
| Laborer, Wrecking: Group 2- Semi-Skilled Wrecker (Salvaging Of Other Building Materials). Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Santa Clara County) | $36.35 | $27.30 | $63.65 |
| Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Santa Clara County) | $36.25 | $27.30 | $63.55 |
| Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Santa Clara County) | $29.94 | $27.30 | $57.24 |
| Laborer, Plaster Tender. Work On A Swing Stage Scaffold: $1.00 Per Hour Additional. (Monterey, San Benito, Santa Cruz, Santa Clara Counties) | $40.68 | $29.68 | $70.36 |
| Laborer, Brick: Mason Tender-Brick. (Fresno, Kings And Madera Counties) | $36.29 | $25.55 | $61.84 |
| Laborer, Traffic Control/Lane Closure: Escort Driver, Flag Person (Fresno, Kings, And Madera Counties) | $36.26 | $27.30 | $63.56 |
| Laborer, Traffic Control/Lane Closure: Traffic Control Person I- Layout Of Traffic Control, Crash Cushions, Construction Area And Roadside Signage. (Fresno, Kings, And Madera Counties) | $36.56 | $27.30 | $63.86 |
| Laborer, Traffic Control/Lane Closure: Traffic Control Person Ii- Installation And Removal Of Temporary/Permanent Signs, Markers, Delineators And Crash Cushions. (Fresno, Kings, And Madera Counties) | $34.06 | $27.30 | $61.36 |
| Tunnel And Shaft Laborers: Group 1- Diamond Driller; Groundmen; Gunite And Shotcrete Nozzlemen. (Fresno, Kings, And Madera Counties) | $45.89 | $27.72 | $73.61 |
| Tunnel And Shaft Laborers: Group 2- Rodmen; Shaft Work & Raise (Below Actual Or Excavated Ground Level). (Fresno, Kings, And Madera Counties) | $45.66 | $27.72 | $73.38 |
| Erector, Tunnel Muck Hauler, Steel Form Raiser And Setter; Timberman, Retimberman (Wood Or Steel Or Substitute Materials Therefore); Tugger (For Tunnel Laborer Work); Cable Tender; Chuck Tender; Powderman - Primer House. (Fresno, Kings, And Madera Counties) | $45.41 | $27.72 | $73.13 |
| Tunnel And Shaft Laborers: Group 4- Vibrator Operator, Pavement Breaker; Bull Gang - Muckers, Trackmen; Concrete Crew - Includes Rodding And Spreading, Dumpmen (Any Method). (Fresno, Kings, And Madera Counties) | $44.96 | $27.72 | $72.68 |
| Tunnel And Shaft Laborers: Group 5- Grout Crew; Reboundman; Swamper/ Brakeman. (Fresno, Kings, And Madera Counties) | $44.42 | $27.72 | $72.14 |
| Tunnel And Shaft Laborers: Shotcrete Specialist. (Fresno, Kings, And Madera Counties) | $46.41 | $27.72 | $74.13 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Fresno, Kings, And Madera Counties) | $36.08 | $27.30 | $63.38 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Fresno, Kings, And Madera Counties) | $36.20 | $27.30 | $63.50 |
| All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Fresno, Kings, And Madera Counties) | $35.50 | $27.30 | $62.80 |
| Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Fresno, Kings, And Madera Counties) | $35.72 | $27.30 | $63.02 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Fresno, Kings, And Madera Counties) | $35.55 | $27.30 | $62.85 |
| All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Fresno, Kings, And Madera Counties) | $36.05 | $27.30 | $63.35 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Fresno, Kings, And Madera Counties) | $35.35 | $27.30 | $62.65 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Fresno, Kings, And Madera Counties) | $35.25 | $27.30 | $62.55 |
| All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Fresno, Kings, And Madera Counties) | $28.94 | $27.30 | $56.24 |
| Laborer, Gunite: Group 1- Structural Nozzleman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Fresno, Kings, And Madera Counties) | $36.46 | $27.30 | $63.76 |
| Laborer, Gunite: Group 2- Nozzleman, Gunman, Potman, Groundman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Fresno, Kings, And Madera Counties) | $35.96 | $27.30 | $63.26 |
| Laborer, Gunite: Group 3- Reboundman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Fresno, Kings, And Madera Counties) | $35.37 | $27.30 | $62.67 |
| Laborer, Gunite: Group 4- Guinte Laborer. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Fresno, Kings, And Madera Counties) | $35.25 | $27.30 | $62.55 |
| Laborer, Wrecking: Group 1- Skilled Wrecker (Removing And Salvaging Of Sash, Windows, And Materials). Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Fresno, Kings, And Madera Counties) | $35.50 | $27.30 | $62.80 |
| Laborer, Wrecking: Group 2- Semi-Skilled Wrecker (Salvaging Of Other Building Materials). Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Fresno, Kings, And Madera Counties) | $35.35 | $27.30 | $62.65 |
| Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Fresno, Kings, And Madera Counties) | $35.25 | $27.30 | $62.55 |
| Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Fresno, Kings, And Madera Counties) | $28.94 | $27.30 | $56.24 |
| Plasterer Tender. Work On A Swing Stage Scaffold: $1.00 Per Hour Additional. (Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San Joaquin, Stanislaus & Tuolumne Counties) | $39.77 | $28.54 | $68.31 |
| Laborer, Plaster Tender. Work On A Swing Stage Scaffold: $1.00 Per Hour Additional. (Fresno, Kings, And Madera Counties) | $39.77 | $28.54 | $68.31 |
| Laborer, Traffic Control/Lane Closure: Escort Driver, Flag Person (Alameda County) | $37.26 | $27.30 | $64.56 |
| Laborer, Traffic Control/Lane Closure: Traffic Control Person I- Layout Of Traffic Control, Crash Cushions, Construction Area And Roadside Signage. (Alameda County) | $37.56 | $27.30 | $64.86 |
| Laborer, Traffic Control/Lane Closure: Traffic Control Person Ii- Installation And Removal Of Temporary/Permanent Signs, Markers, Delineators And Crash Cushions. (Alameda County) | $35.06 | $27.30 | $62.36 |
| Tunnel And Shaft Laborers: Group 1- Diamond Driller; Groundmen; Gunite And Shotcrete Nozzlemen (Alameda County) | $45.89 | $27.72 | $73.61 |
| Tunnel And Shaft Laborers: Group 2- Rodmen; Shaft Work & Raise (Below Actual Or Excavated Ground Level) (Alameda County) | $45.66 | $27.72 | $73.38 |
| Erector, Tunnel Muck Hauler, Steel Form Raiser And Setter; Timberman, Retimberman (Wood Or Steel Or Substitute Materials Therefore); Tugger (For Tunnel Laborer Work); Cable Tender; Chuck Tender; Powderman - Primer House (Alameda County) | $45.41 | $27.72 | $73.13 |
| Tunnel And Shaft Laborers: Group 4- Vibrator Operator, Pavement Breaker; Bull Gang - Muckers, Trackmen; Concrete Crew - Includes Rodding And Spreading, Dumpmen (Any Method) (Alameda County) | $44.96 | $27.72 | $72.68 |
| Tunnel And Shaft Laborers: Group 5- Grout Crew; Reboundman; Swamper/ Brakeman (Alameda County) | $44.42 | $27.72 | $72.14 |
| Tunnel And Shaft Laborers: Shotcrete Specialist (Alameda County) | $46.41 | $27.72 | $74.13 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Alameda County) | $37.08 | $27.30 | $64.38 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Alameda County) | $37.20 | $27.30 | $64.50 |
| Receive $0.25 Per Hour Above Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Alameda County) | $36.50 | $27.30 | $63.80 |
| Per Hour Above Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Alameda County) | $36.72 | $27.30 | $64.02 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Alameda County) | $36.55 | $27.30 | $63.85 |
| Receive $0.25 Per Hour Above Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Alameda County) | $37.05 | $27.30 | $64.35 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Alameda County) | $36.35 | $27.30 | $63.65 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Alameda County) | $36.25 | $27.30 | $63.55 |
| Receive $0.25 Per Hour Above Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Alameda County) | $29.94 | $27.30 | $57.24 |
| Laborer, Gunite: Group 1- Structural Nozzleman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Alameda County) | $37.46 | $27.30 | $64.76 |
| Laborer, Gunite: Group 2- Nozzleman, Gunman, Potman, Groundman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Alameda County) | $36.96 | $27.30 | $64.26 |
| Laborer, Gunite: Group 3- Reboundman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Alameda County) | $36.37 | $27.30 | $63.67 |
| Laborer, Gunite: Group 4- Guinte Laborer. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Alameda County) | $36.25 | $27.30 | $63.55 |
| Laborer, Wrecking: Group 1- Skilled Wrecker (Removing And Salvaging Of Sash, Windows, And Materials). Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Alameda County) | $36.50 | $27.30 | $63.80 |
| Laborer, Wrecking: Group 2- Semi-Skilled Wrecker (Salvaging Of Other Building Materials). Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Alameda County) | $36.35 | $27.30 | $63.65 |
| Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Alameda County) | $36.25 | $27.30 | $63.55 |
| Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Alameda County) | $29.94 | $27.30 | $57.24 |
| Brick Tender. Footnotes: Work On Jobs Where Heat-Protective Clothing Is Required: $2.00 Per Hour Additional. Work At Grinders: $.25 Per Hour Additional. Manhole Work: $2.00 Per Day Additional. (Alameda County) | $37.05 | $27.45 | $64.50 |
| Plasterer Tender. Work On A Swing Stage Scaffold: $1.00 Per Hour Additional. (Alameda And Contra Costa Counties) | $41.93 | $30.32 | $72.25 |
| Laborer, Traffic Control/Lane Closure: Escort Driver, Flag Person. (Contra Costa County) | $37.26 | $27.30 | $64.56 |
| Laborer, Traffic Control/Lane Closure: Traffic Control Person I- Layout Of Traffic Control, Crash Cushions, Construction Area And Roadside Signage. (Contra Costa County) | $37.56 | $27.30 | $64.86 |
| Laborer, Traffic Control/Lane Closure: Traffic Control Person Ii- Installation And Removal Of Temporary/Permanent Signs, Markers, Delineators And Crash Cushions. (Contra Costa County) | $35.06 | $27.30 | $62.36 |
| Tunnel And Shaft Laborers: Group 1- Diamond Driller; Groundmen; Gunite And Shotcrete Nozzlemen (Contra Costa County) | $45.89 | $27.72 | $73.61 |
| Tunnel And Shaft Laborers: Group 2- Rodmen; Shaft Work & Raise (Below Actual Or Excavated Ground Level) (Contra Costa County) | $45.66 | $27.72 | $73.38 |
| Erector, Tunnel Muck Hauler, Steel Form Raiser And Setter; Timberman, Retimberman (Wood Or Steel Or Substitute Materials Therefore); Tugger (For Tunnel Laborer Work); Cable Tender; Chuck Tender; Powderman - Primer House (Contra Costa County) | $45.41 | $27.72 | $73.13 |
| Tunnel And Shaft Laborers: Group 4- Vibrator Operator, Pavement Breaker; Bull Gang - Muckers, Trackmen; Concrete Crew - Includes Rodding And Spreading, Dumpmen (Any Method) (Contra Costa County) | $44.96 | $27.72 | $72.68 |
| Tunnel And Shaft Laborers: Group 5- Grout Crew; Reboundman; Swamper/ Brakeman (Contra Costa County) | $44.42 | $27.72 | $72.14 |
| Tunnel And Shaft Laborers: Shotcrete Specialist (Contra Costa County) | $46.41 | $27.72 | $74.13 |
| Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Contra Costa County)(Contra Costa County) | $37.08 | $27.30 | $64.38 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Contra Costa County) | $37.20 | $27.30 | $64.50 |
| Receive $0.25 Per Hour Above Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Contra Costa County) | $36.50 | $27.30 | $63.80 |
| Per Hour Above Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Contra Costa County) | $36.72 | $27.30 | $64.02 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Contra Costa County) | $36.55 | $27.30 | $63.85 |
| Receive $0.25 Per Hour Above Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Contra Costa County) | $37.05 | $27.30 | $64.35 |
| Receive $0.25 Per Hour Above Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Contra Costa County) | $36.70 | $27.30 | $64.00 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Contra Costa County) | $36.35 | $27.30 | $63.65 |
| Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Contra Costa County) | $36.25 | $27.30 | $63.55 |
| Receive $0.25 Per Hour Above Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Contra Costa County) | $29.94 | $27.30 | $57.24 |
| Laborer, Gunite: Group 1- Structural Nozzleman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Contra Costa County) | $37.46 | $27.30 | $64.76 |
| Laborer, Gunite: Group 2- Nozzleman, Gunman, Potman, Groundman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Contra Costa County) | $36.96 | $27.30 | $64.26 |
| Laborer, Gunite: Group 3- Reboundman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Contra Costa County) | $36.37 | $27.30 | $63.67 |
| Laborer, Gunite: Group 4- Guinte Laborer. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Contra Costa County) | $36.25 | $27.30 | $63.55 |
| Laborer, Wrecking: Group 1- Skilled Wrecker (Removing And Salvaging Of Sash, Windows, And Materials). Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Contra Costa County) | $36.50 | $27.30 | $63.80 |
| Laborer, Wrecking: Group 2- Semi-Skilled Wrecker (Salvaging Of Other Building Materials). Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Contra Costa County) | $36.35 | $27.30 | $63.65 |
| Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Contra Costa County) | $36.25 | $27.30 | $63.55 |
| Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Contra Costa County) | $29.94 | $27.30 | $57.24 |
| Brick Tender. Footnotes: Work On Jobs Where Heat-Protective Clothing Is Required: $2.00 Per Hour Additional. Work At Grinders: $.25 Per Hour Additional. Manhole Work: $2.00 Per Day Additional. (Contra Costa County) | $37.05 | $27.45 | $64.50 |
| Plaster Tender. Work On A Swing Stage Scaffold: $1.00 Per Hour Additional. (Alameda And Contra Costa Counties) | $41.93 | $30.32 | $72.25 |
| Laborer, Traffic Control/Lane Closure: Escort Driver, Flag Person (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $36.26 | $27.30 | $63.56 |
| Laborer, Traffic Control/Lane Closure: Traffic Control Person I- Layout Of Traffic Control, Crash Cushions, Construction Area And Roadside Signage. (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $36.56 | $27.30 | $63.86 |
| Laborer, Traffic Control/Lane Closure: Traffic Control Person Ii- Installation And Removal Of Temporary/Permanent Signs, Markers, Delineators And Crash Cushions. (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $34.06 | $27.30 | $61.36 |
| Tunnel And Shaft Laborers: Group 1- Diamond Driller; Groundmen; Gunite And Shotcrete Nozzlemen (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $45.89 | $27.72 | $73.61 |
| Tunnel And Shaft Laborers: Group 2- Rodmen; Shaft Work & Raise (Below Actual Or Excavated Ground Level) (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $45.66 | $27.72 | $73.38 |
| Erector, Tunnel Muck Hauler, Steel Form Raiser And Setter; Timberman, Retimberman (Wood Or Steel Or Substitute Materials Therefore); Tugger (For Tunnel Laborer Work); Cable Tender; Chuck Tender; Powderman - Primer House (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $45.41 | $27.72 | $73.13 |
| Tunnel And Shaft Laborers: Group 4- Vibrator Operator, Pavement Breaker; Bull Gang - Muckers, Trackmen; Concrete Crew - Includes Rodding And Spreading, Dumpmen (Any Method) (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $44.96 | $27.72 | $72.68 |
| Tunnel And Shaft Laborers: Group 5- Grout Crew; Reboundman; Swamper/ Brakeman (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $44.42 | $27.72 | $72.14 |
| Tunnel And Shaft Laborers: Shotcrete Specialist (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $46.41 | $27.72 | $74.13 |
| Laborer: Mason Tender-Brick (Mariposa, Merced, Stanislaus And Tuolumne Counties) | $36.29 | $25.55 | $61.84 |
| Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $36.08 | $27.30 | $63.38 |
| Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $36.20 | $27.30 | $63.50 |
| All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $35.50 | $27.30 | $62.80 |
| Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $35.72 | $27.30 | $63.02 |
| Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $35.55 | $27.30 | $62.85 |
| All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $36.05 | $27.30 | $63.35 |
| Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $35.35 | $27.30 | $62.65 |
| Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $35.25 | $27.30 | $62.55 |
| All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed. (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $28.94 | $27.30 | $56.24 |
| Laborer, Gunite: Group 1- Structural Nozzleman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $36.46 | $27.30 | $63.76 |
| Laborer, Gunite: Group 2- Nozzleman, Gunman, Potman, Groundman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $35.96 | $27.30 | $63.26 |
| Laborer, Gunite: Group 3- Reboundman. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $35.37 | $27.30 | $62.67 |
| Laborer, Gunite: Group 4- Guinte Laborer. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $35.25 | $27.30 | $62.55 |
| Laborer, Wrecking: Group 1- Skilled Wrecker (Removing And Salvaging Of Sash, Windows, And Materials). Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $35.50 | $27.30 | $62.80 |
| Laborer, Wrecking: Group 2- Semi-Skilled Wrecker (Salvaging Of Other Building Materials). Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $35.35 | $27.30 | $62.65 |
| Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $35.25 | $27.30 | $62.55 |
| Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts Shall Receive $0.25 Per Hour Above The Applicable Wage Rate. (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $28.94 | $27.30 | $56.24 |
| Laborer, Plaster Tender. Work On A Swing Stage Scaffold: $1.00 Per Hour Additional. (Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San Joaquin, Stanislaus, & Tuolumne Counties) | $39.77 | $28.54 | $68.31 |
| Laborer, Plaster Tender. Work On A Swing Stage Scaffold: $1.00 Per Hour Additional. (Mariposa, Merced, Stanislaus, And Tuolumne Counties) | $39.77 | $28.54 | $68.31 |
| Stacks, Towers, Tanks, And Similar Structures]. High Work: Over 50 Feet - $2.00 Per Hour Additional 100 To 180 Feet - $4.00 Per Hour Additional Over 180 Feet - $6.00 Per Houir Additional (Alameda, Contra Costa, Monterey, San Benito, San Mateo, Santa Clara, And Santa Cruz Counties) | $53.38 | $28.04 | $81.42 |
| Drywall Finisher/Taper. (Alamdea, Contra Costa, San Francisco, San Mateo, & Santa Clara Counties) | $63.76 | $32.69 | $96.45 |
| Drywall Finisher/Taper. (Calaveras, Mariposa, Merced, Monterey, San Benito, San Joaquin, Santa Cruz, Stanislaus, & Tuolumne Counties) | $59.63 | $31.29 | $90.92 |
| Soft Floor Layer (Alameda, Contra Costa, Mariposa, Merced, Monterey, San Benito, San Francisco, San Mateo, Santa Clara And Santa Cruz Counties) | $59.00 | $33.03 | $92.03 |
| Additional Per Hour. High Time: Over 50 Ft Above Ground Or Water Level $2.00 Additional Per Hour. 100 To 180 Ft Above Ground Or Water Level $4.00 Additional Per Hour. Over 180 Ft Above Ground Or Water Level $6.00 Additional Per Hour. (Calaveras, Mariposa, Merced, San Joaquin, Stanislaus & Tuolumne Counties) | $43.45 | $22.80 | $66.25 |
| Painter (San Francisco County) | $57.00 | $28.04 | $85.04 |
| Glazier (Fresno, Kings, Madera, Mariposa And Merced Counties) | $44.33 | $28.88 | $73.21 |
| Glazier (Alameda Contra Costa, Monterey, San Benito, San Francisco, San Mateo, Santa Clara & Santa Cruz Counties) | $56.22 | $34.00 | $90.22 |
| & Paperhangers Recive $1.00 Additional Per Hour. Painters Doing Drywall Patching Receive $1.25 Additional Per Hour. Lead Abaters & Sandblasters Receive $1.50 Additional Per Hour. High Time - Over 30 Feet (Does Not Include Work From A Lift) $0.75 Per Hour Additional. (Fresno, Kings And Madera Counties) | $34.49 | $21.80 | $56.29 |
| Spray Painters & Paperhangers Recive $1.00 Additional Per Hour. Painters Doing Drywall Patching Receive $1.25 Additional Per Hour. Lead Abaters & Sandblasters Receive $1.50 Additional Per Hour. High Time - Over 30 Feet (Does Not Include Work From A Lift) $0.75 Per Hour Additional. (Fresno, Kings And Madera Counties) | $35.74 | $21.80 | $57.54 |
| Soft Floor Layer (Fresno, Kings & Madera Counties) | $38.53 | $23.19 | $61.72 |
| Luther King, Jr. Day, President'S Day, Memorial Day, Independence Day, Labor Day, Veteran'S Day, Thanksgiving Day, And Christmas Day. Employee Required To Wear A Body Harness Shall Receive $1.50 Per Hour Above The Basic Hourly Rate At Any Elevation. (Calaveras, San Joaquin, Stanislaus And Tuolumne Counties) | $43.25 | $35.62 | $78.87 |
| Parking Lot Striping/Highway Marking: Highway Improvememt: Group 2- Gamecourt & Playground Installer | $34.71 | $17.62 | $52.33 |
| Parking Lot Striping/Highway Marking: Highway Improvement: Group 1- Striper: Layout And Application Of Painted Traffic Stripes And Marking; Hot Thermo Plastic; Tape, Traffic Stripes And Markings | $40.83 | $17.62 | $58.45 |
| Parking Lot Striping/Highway Marking: Highway Improvement: Group 3- Protective Coating, Pavement Sealing | $35.11 | $17.62 | $52.73 |
| Soft Floor Layer (Calaveras; San Joaquin Counties; Stanislaus And Tuolumne Counties) | $48.54 | $26.59 | $75.13 |
| Plasterer (Alameda, Contra Costa, San Mateo And San Francisco Counties) | $42.41 | $30.73 | $73.14 |
| Plasterer (Area 188: Fresno) | $32.70 | $31.68 | $64.38 |
| Plasterer (Area 224: San Benito, Santa Clara, Santa Cruz) | $32.88 | $31.68 | $64.56 |
| Plasterer (Area 295: Calaveras & San Joaquin Counties) | $32.70 | $31.68 | $64.38 |
| Plasterer (Area 337: Monterey County) | $32.88 | $31.68 | $64.56 |
| Plasterer (Area 429: Mariposa, Merced, Stanislaus, Tuolumne Counties) | $32.70 | $31.68 | $64.38 |
| Cement Mason/Concrete Finisher | $32.15 | $23.27 | $55.42 |
| Plumber (Plumber, Steamfitter, Refrigeration Fitter) (San Francisco County) | $85.50 | $48.98 | $134.48 |
| Landscape/Irrigation Fitter: Underground/Utility Fitter (San Francisco County) | $77.35 | $36.53 | $113.88 |
| Plumber & Steamfitter (Monterey And Santa Cruz Counties) | $57.75 | $43.60 | $101.35 |
| Plumber And Steamfitter: (1) Refrigeration (Contra Costa County) | $67.68 | $49.04 | $116.72 |
| Plumber And Steamfitter: (2) All Other Work (Contra Costa County) | $68.57 | $49.04 | $117.61 |
| Plumber & Steamfitter (Fresno, Kings & Madera Counties) | $54.50 | $42.54 | $97.04 |
| Area; Demolition Of Piping And Fixtures For Remodeling And Additions; Setting Up And Tearing Down Work Benches, Ladders And Job Shacks; Clean-Up And Sweeping Of Jobsite; Pipe Wrapping And Waterproofing Where Tar Or Similar Material Is Applied For Protection Of Buried Piping; Flagman) (Fresno, Merced, & San Joaquin Counties) | $13.00 | $10.74 | $23.74 |
| Pipefitter (Contra Costa County) | $80.50 | $50.45 | $130.95 |
| Plumber, Pipefitter, Steamfitter (Alameda County) | $80.50 | $50.45 | $130.95 |
| Underground Utility Worker /Landscape Fitter (Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus, And Tuolumne Counties) | $36.01 | $18.50 | $54.51 |
| Plumber/Pipefitter (San Benito And Santa Clara Counties) | $68.76 | $46.63 | $115.39 |
| Plumber & Steamfitter (Calaveras, Mariposa, Merced, San Joaquin, Stanislaus & Tuolumne Counties) | $58.45 | $38.74 | $97.19 |
| Plumber/Pipefitter/Steamfitter (San Mateo County) | $87.75 | $41.44 | $129.19 |
| Roofer. Footnote: Work With Pitch, Pitch Base Of Pitch Impregnanted Products Or Any Material Containing Coal Tar Pitch, On Any Building Old Or New, Where Both Asphalt And Pitchers Are Used In The Application Of A Built-Up Roof Or Tear Off: $2.00 Per Hour Additional. (Fresno, Kings, And Madera Counties) | $45.76 | $16.86 | $62.62 |
| Roofer (San Francisco & San Mateo Counties) | $55.30 | $22.97 | $78.27 |
| Roofer (Alameda And Contra Costa Counties) | $54.94 | $23.34 | $78.28 |
| Roofer (Calaveras, Mariposa, Merced, San Joaquin, Stanislaus And Tuolumne Counties) | $49.65 | $22.19 | $71.84 |
| Roofer: Bitumastic, Enameler, Coal Tar, Pitch And Mastic Worker (Monterey, San Benito, Santa Clara, And Santa Cruz Counties) | $57.17 | $21.51 | $78.68 |
| Roofer: Journeyman (Monterey, San Benito, Santa Clara, And Santa Cruz Counties) | $53.17 | $21.51 | $74.68 |
| Roofer: Kettle Person (2 Kettles) (Monterey, San Benito, Santa Clara, And Santa Cruz Counties:) | $55.17 | $21.51 | $76.68 |
| Sprinkler Fitter: Fire (Alameda, Contra Costa, San Francisco, San Mateo And Santa Clara Counties) | $81.54 | $41.35 | $122.89 |
| Sprinkler Fitter (Calaveras, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito, San Joaquin, Santa Cruz, Stanislaus And Tuolumne Counties) | $49.69 | $29.72 | $79.41 |
| Sheet Metal Worker (Monterey & San Benito Counties) | $58.52 | $38.67 | $97.19 |
| Sheet Metal Worker (Santa Cruz County) | $55.16 | $34.18 | $89.34 |
| Sheet Metal Worker: All Other Work (Alameda, Contra Costa, San Fransico, San Mateo, Santa Clara Counties)) | $64.06 | $46.83 | $110.89 |
| Sheet Metal Worker: Mechanical Contracts Under $200,000 (Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara Counties)) | $55.92 | $45.29 | $101.21 |
| Sheet Metal Worker (Calaveras And San Joaquin Counties) | $44.34 | $39.22 | $83.56 |
| Sheet Metal Worker: Excluding Metal Deck And Siding (Mariposa, Merced, Stanislaus And Tuolumne Counties) | $41.28 | $45.41 | $86.69 |
| Sheet Metal Worker (Fresno, Kings, And Madera Counties) | $44.07 | $40.79 | $84.86 |
| Sheet Metal Worker: Metal Decking And Siding Only. (Alameda, Contra Costa, Monterey, San Benito, San Francisco, San Mateo, Santa Clara And Santa Cruz Counties) | $56.23 | $37.52 | $93.75 |
| Sheet Metal Worker: Metal Decking And Siding Only. (Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San Joaquin, Stanislaus And Tuolumne Counties) | $56.23 | $37.52 | $93.75 |
| Skid Truck (Debris Box); Dry Pre-Batch Concrete Mix Trucks; Dumpster Or Similar Type; Slurry Truck: Use Dump Truck Yardage Rate. Heater Planer; Asphalt Burner; Scarifier Burner; Industrial Lift Truck (Mechanical Tailgate); Utility And Clean-Up Truck: Use Appropriate Rate For The Power Unit Or The Equipment Utilized | $43.26 | $34.28 | $77.54 |
| Truck; Skid Truck (Debris Box); Dry Pre-Batch Concrete Mix Trucks; Dumpster Or Similar Type; Slurry Truck: Use Dump Truck Yardage Rate. Heater Planer; Asphalt Burner; Scarifier Burner; Industrial Lift Truck (Mechanical Tailgate); Utility And Clean-Up Truck: Use Appropriate Rate For The Power Unit Or The Equipment Utilized | $43.56 | $34.28 | $77.84 |
| Skid Truck (Debris Box); Dry Pre-Batch Concrete Mix Trucks; Dumpster Or Similar Type; Slurry Truck: Use Dump Truck Yardage Rate. Heater Planer; Asphalt Burner; Scarifier Burner; Industrial Lift Truck (Mechanical Tailgate); Utility And Clean-Up Truck: Use Appropriate Rate For The Power Unit Or The Equipment Utilized | $43.86 | $34.28 | $78.14 |
| Dry Pre-Batch Concrete Mix Trucks; Dumpster Or Similar Type; Slurry Truck: Use Dump Truck Yardage Rate. Heater Planer; Asphalt Burner; Scarifier Burner; Industrial Lift Truck (Mechanical Tailgate); Utility And Clean-Up Truck: Use Appropriate Rate For The Power Unit Or The Equipment Utilized | $44.21 | $34.28 | $78.49 |
| Dumpcrete Truck; Skid Truck (Debris Box); Dry Pre-Batch Concrete Mix Trucks; Dumpster Or Similar Type; Slurry Truck: Use Dump Truck Yardage Rate. Heater Planer; Asphalt Burner; Scarifier Burner; Industrial Lift Truck (Mechanical Tailgate); Utility And Clean-Up Truck: Use Appropriate Rate For The Power Unit Or The Equipment Utilized | $44.56 | $34.28 | $78.84 |
Davis-Bacon Residential
Wage determination CA20260009, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Electricians: One And Two-Stories Fresno, Madera And Tulare Counties | $19.00 | $7.72 | $26.72 |
| Electrician: China Lake Naval Weapons Center, Edwards Afb Kern County | $65.40 | $22.15 | $87.55 |
| Electrician San Joaquin County | $49.45 | $31.96 | $81.41 |
| Electrician Merced And Stanislaus Counties | $48.50 | $30.09 | $78.59 |
| Operator: Power Equipment, Area 1:: Group 8-A | $54.69 | $34.69 | $89.38 |
| Operator: Power Equipment, Area 1:: Group 8 | $56.71 | $34.69 | $91.40 |
| Operator: Power Equipment, Area 1:: Group 7 | $57.79 | $34.69 | $92.48 |
| Operator: Power Equipment, Area 1:: Group 6 | $58.88 | $34.69 | $93.57 |
| Operator: Power Equipment, Area 1:: Group 5 | $60.15 | $34.69 | $94.84 |
| Operator: Power Equipment, Area 1:: Group 4 | $61.36 | $34.69 | $96.05 |
| Operator: Power Equipment, Area 1:: Group 3 | $62.69 | $34.69 | $97.38 |
| Operator: Power Equipment, Area 1:: Group 2 | $64.09 | $34.69 | $98.78 |
| Operator: Power Equipment, Area 1:: Group 1 | $65.54 | $34.69 | $100.23 |
| Operator: Power Equipment, Landscape Work Only: Group 3 (Area 2) | $49.64 | $28.56 | $78.20 |
| Operator: Power Equipment, Landscape Work Only: Group 3 (Area 1) | $47.64 | $28.56 | $76.20 |
| Operator: Power Equipment, Landscape Work Only: Group 2 (Area 2) | $54.25 | $28.56 | $82.81 |
| Operator: Power Equipment, Landscape Work Only: Group 2 (Area 1) | $52.25 | $28.56 | $80.81 |
| Operator: Power Equipment, Landscape Work Only: Group 1 (Area 2) | $57.85 | $28.56 | $86.41 |
| Operator: Power Equipment, Landscape Work Only: Group 1 (Area 1) | $55.85 | $28.56 | $84.41 |
| Operator: Power Equipment Group 25 (Kern County Site Work Only) | $49.98 | $25.25 | $75.23 |
| Operator: Power Equipment Group 24 (Kern County Site Work Only) | $49.81 | $25.25 | $75.06 |
| Operator: Power Equipment Group 23 (Kern County Site Work Only) | $49.69 | $25.25 | $74.94 |
| Operator: Power Equipment Group 22 (Kern County Site Work Only) | $49.58 | $25.25 | $74.83 |
| Operator: Power Equipment Group 21 (Kern County Site Work Only) | $49.48 | $25.25 | $74.73 |
| Operator: Power Equipment Group 20 (Kern County Site Work Only) | $49.31 | $25.25 | $74.56 |
| Operator: Power Equipment Group 19 (Kern County Site Work Only) | $49.19 | $25.25 | $74.44 |
| Operator: Power Equipment Group 18 (Kern County Site Work Only) | $49.08 | $25.25 | $74.33 |
| Operator: Power Equipment Group 17 (Kern County Site Work Only) | $48.98 | $25.25 | $74.23 |
| Operator: Power Equipment Group 16 (Kern County Site Work Only) | $48.81 | $25.25 | $74.06 |
| Operator: Power Equipment Group 15 (Kern County Site Work Only) | $48.69 | $25.25 | $73.94 |
| Operator: Power Equipment Group 14 (Kern County Site Work Only) | $48.61 | $25.25 | $73.86 |
| Operator: Power Equipment Group 13 (Kern County Site Work Only) | $48.58 | $25.25 | $73.83 |
| Operator: Power Equipment Group 12 (Kern County Site Work Only) | $48.48 | $25.25 | $73.73 |
| Operator: Power Equipment Group 11 (Kern County Site Work Only) | $49.41 | $25.25 | $74.66 |
| Operator: Power Equipment Group 10 (Kern County Site Work Only) | $48.31 | $25.25 | $73.56 |
| Operator: Power Equipment Group 9 (Kern County Site Work Only) | $49.29 | $25.25 | $74.54 |
| Operator: Power Equipment Group 8 (Kern County Site Work Only) | $48.19 | $25.25 | $73.44 |
| Operator: Power Equipment Group 7 (Kern County Site Work Only) | $49.18 | $25.25 | $74.43 |
| Operator: Power Equipment Group 6 (Kern County Site Work Only) | $48.08 | $25.25 | $73.33 |
| Operator: Power Equipment Group 5 (Kern County Site Work Only) | $48.96 | $25.25 | $74.21 |
| Operator: Power Equipment Group 4 (Kern County Site Work Only) | $47.86 | $25.25 | $73.11 |
| Operator: Power Equipment Group 3 (Kern County Site Work Only) | $46.37 | $25.25 | $71.62 |
| Operator: Power Equipment Group 2 (Kern County Site Work Only) | $46.08 | $25.25 | $71.33 |
| Operator: Power Equipment Group 1 (Kern County Site Work Only) | $45.30 | $25.25 | $70.55 |
| Painter, Including Lead Abatement: (2) All Other Work Kern County | $34.08 | $18.50 | $52.58 |
| Soft Floor Layer Fresno, Madera And Tulare Counties | $38.53 | $23.19 | $61.72 |
| Soft Floor Layer San Joaquin And Stanislaus Counties | $48.54 | $26.59 | $75.13 |
| Soft Floor Layer Kern County | $45.15 | $19.43 | $64.58 |
| Cement Mason/Concrete Finisher (Site Work Only) Fresno, Madera, Merced, San Joaquin, Stanislaus And Tulare Counties | $39.20 | $19.71 | $58.91 |
| Cement Mason/Concrete Finisher (Site Work Only) Kern County | $47.70 | $27.07 | $74.77 |
| Plumber: Sewer & Storm Drain Work Kern County | $48.84 | $23.58 | $72.42 |
| Plumber: Landscape/Irrigation Fitter Kern County | $44.75 | $26.20 | $70.95 |
| Plumber: All Other Work Kern County | $48.83 | $22.73 | $71.56 |
| Roofer Fresno, Kern, Madera And Tulare Counties | $45.76 | $16.86 | $62.62 |
| Roofer Merced, San Joaquin And Stanislaus Counties | $49.65 | $22.19 | $71.84 |
| Plasterer | $17.50 | $0.00 | $17.50 |
| Lather | $15.00 | $0.00 | $15.00 |
| Laborer, General | $7.25 | $0.00 | $7.25 |
| Carpenter | $21.24 | $7.20 | $28.44 |
| Bricklayer | $17.00 | $1.12 | $18.12 |
| Brick Tender | $11.00 | $0.96 | $11.96 |
Davis-Bacon Heavy, Highway
Wage determination CA20260021, revision 2, updated 1. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Asbestos Removal Worker/Hazardous Material Handler (Includes Preparation, Wetting, Stripping, Removal, Scrapping, Vacuuming, Bagging And Disposing Of All Insulation Materials From Mechanical Systems, Whether They Contain Asbestos Or Not) | $35.31 | $12.75 | $48.06 |
| Asbestos Workers/Insulator (Includes The Application Of All Insulating Materials, Protective Coverings, Coatings, And Finishes To All Types Of Mechanical Systems) | $64.56 | $25.07 | $89.63 |
| Boilermaker | $45.60 | $38.99 | $84.59 |
| Marble Finisher | $42.06 | $19.80 | $61.86 |
| Tile Layer | $50.28 | $22.05 | $72.33 |
| Tile Finisher | $32.68 | $18.32 | $51.00 |
| Terrazzo Worker/Setter | $60.58 | $29.79 | $90.37 |
| Terrazzo Finisher | $44.93 | $20.98 | $65.91 |
| Bricklayer; Marble Setter *The Wage Scale For Prevailing Wage Projects Performed In Blythe, China Lake, Death Valley, Fort Irwin, Twenty-Nine Palms, Needles And 1-15 Corridor (Barstow To The Nevada State Line) Will Be Three Dollars ($3.00) Above The Standard San Bernardino/Riverside County Hourly Wage Rate | $45.53 | $20.29 | $65.82 |
| Other Enclosure Less Than 48"" In Height, The Premium Will Be $1.00 Per Foot. Work In Combination Of Classifications: Employees Working In Any Combination Of Classifications Within The Diving Crew (Except Dive Supervisor) In A Shift Are Paid In The Classification With The Highest Rate For That Shift | $59.51 | $34.69 | $94.20 |
| Other Enclosure Less Than 48"" In Height, The Premium Will Be $1.00 Per Foot. Work In Combination Of Classifications: Employees Working In Any Combination Of Classifications Within The Diving Crew (Except Dive Supervisor) In A Shift Are Paid In The Classification With The Highest Rate For That Shift | $64.51 | $34.69 | $99.20 |
| Pipe, Tunnel Or Other Enclosure Less Than 48"" In Height, The Premium Will Be $1.00 Per Foot. Work In Combination Of Classifications: Employees Working In Any Combination Of Classifications Within The Diving Crew (Except Dive Supervisor) In A Shift Are Paid In The Classification With The Highest Rate For That Shift | $103.62 | $34.69 | $138.31 |
| Pipe, Tunnel Or Other Enclosure Less Than 48"" In Height, The Premium Will Be $1.00 Per Foot. Work In Combination Of Classifications: Employees Working In Any Combination Of Classifications Within The Diving Crew (Except Dive Supervisor) In A Shift Are Paid In The Classification With The Highest Rate For That Shift | $59.51 | $34.69 | $94.20 |
| Pipe, Tunnel Or Other Enclosure Less Than 48"" In Height, The Premium Will Be $1.00 Per Foot. Work In Combination Of Classifications: Employees Working In Any Combination Of Classifications Within The Diving Crew (Except Dive Supervisor) In A Shift Are Paid In The Classification With The Highest Rate For That Shift | $60.51 | $34.69 | $95.20 |
| Other Enclosure Less Than 48"" In Height, The Premium Will Be $1.00 Per Foot. Work In Combination Of Classifications: Employees Working In Any Combination Of Classifications Within The Diving Crew (Except Dive Supervisor) In A Shift Are Paid In The Classification With The Highest Rate For That Shift | $54.10 | $34.69 | $88.79 |
| Piledriver | $54.10 | $34.69 | $88.79 |
| Carpenters: Millwright | $47.92 | $32.41 | $80.33 |
| Carpenters: Journeyman Carpenter | $45.42 | $30.82 | $76.24 |
| Carpenters: Bridge Builder/Highway Carpenter | $52.65 | $30.82 | $83.47 |
| Carpenters (Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer) | $45.57 | $30.82 | $76.39 |
| Electrician | $50.00 | $30.15 | $80.15 |
| Line Construction: (3) Groundman Holidays: New Year'S Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day And Day After Thanksgiving, Christmas Day | $40.76 | $21.76 | $62.52 |
| (Operates Crawler Tractors, Commercial Motor Vehicles, Backhoes, Trenchers, Cranes (50 Tons And Below), Overhead & Underground Distribution Line Equipment) Holidays: New Year'S Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day And Day After Thanksgiving, Christmas Day | $53.30 | $22.26 | $75.56 |
| Line Construction: (1) Lineman; Cable Splicer Holidays: New Year'S Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day And Day After Thanksgiving, Christmas Day | $70.16 | $24.71 | $94.87 |
| Operator: Power Equipment, Piledriving - Area 1:: Group 3 (Truck Crane Oiler) | $45.12 | $31.15 | $76.27 |
| Operator: Power Equipment, Piledriving - Area 1:: Group 3 (Oiler) | $42.89 | $31.15 | $74.04 |
| Operator: Power Equipment, Piledriving - Area 1:: Group 3 (Lifting Devices) | $49.14 | $31.15 | $80.29 |
| Operator: Power Equipment, Piledriving - Area 1:: Group 2 (Truck Crane Oiler) | $45.41 | $31.15 | $76.56 |
| Operator: Power Equipment, Piledriving - Area 1:: Group 2 (Oiler) | $43.11 | $31.15 | $74.26 |
| Operator: Power Equipment, Piledriving - Area 1:: Group 2 (Lifting Devices) | $50.82 | $31.15 | $81.97 |
| Operator: Power Equipment, Piledriving - Area 1:: Group 1 (Truck Crane Oiler) | $45.66 | $31.15 | $76.81 |
| Operator: Power Equipment, Piledriving - Area 1:: Group 1 (Oiler) | $43.38 | $31.15 | $74.53 |
| Operator: Power Equipment, Piledriving - Area 1:: Group 1 (Lifting Devices) | $52.64 | $31.15 | $83.79 |
| Lifting Devices: Group 4: Assistant Operator In Lieu Of Assistant To Engineer; Forklift, 10 Tons And Over; Heavy-Duty Repairperson/Welder Footnote: Work Suspended By Ropes Or Cables, Or Work On A Yo-Yo Cat: $.60 Per Hour Additional. ..........$ 47.47 31.15 Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Underground: (Group 5) | $58.09 | $32.53 | $90.62 |
| Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Underground: (Group 4) | $59.23 | $32.53 | $91.76 |
| Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Underground: (Group 3) | $60.37 | $32.53 | $92.90 |
| Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Underground: (Group 2) | $61.70 | $32.53 | $94.23 |
| Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Underground: (Group 1-A) | $65.43 | $32.53 | $97.96 |
| Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Underground: (Group 1) | $62.96 | $32.53 | $95.49 |
| Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Shafts, Stopes, Raises: (Group 5) | $58.19 | $32.53 | $90.72 |
| Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Shafts, Stopes, Raises: (Group 4) | $59.33 | $32.53 | $91.86 |
| Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Shafts, Stopes, Raises: (Group 3) | $60.47 | $32.53 | $93.00 |
| Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Shafts, Stopes, Raises: (Group 2) | $61.80 | $32.53 | $94.33 |
| Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Shafts, Stopes, Raises: (Group 1-A) | $65.53 | $32.53 | $98.06 |
| Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Shafts, Stopes, Raises: (Group 1) | $63.06 | $32.53 | $95.59 |
| Operator: Power Equipment, Steel Erection - Area 1: Cranes: Group 2: Crane Over 45 Tons To 100 Tons; Derrick Under 100 Tons; Self-Propelled Boom-Type Lifting Device Over 45 Tons To 100 Tons; Tower Crane Footnote: Work Suspended By Ropes Or Cables, Or Work On A Yo-Yo Cat: $.60 Per Hour Additional | $67.04 | $32.53 | $99.57 |
| Operator: Power Equipment, Steel Erection - Area 1: Cranes: Group 1: Crane Over 100 Tons; Derrick Over 100 Tons; Self- Propelled Boom-Type Lifting Device Over 100 Tons Footnote: Work Suspended By Ropes Or Cables, Or Work On A Yo-Yo Cat: $.60 Per Hour Additional | $68.81 | $32.53 | $101.34 |
| Operator: Power Equipment, Steel Erection - Area 1: Crane: Group 4: Chicago Boom; Forklift, 10 Tons And Over; Heavy-Duty Repair Person/Welder Group 5: Boom Cat Footnote: Work Suspended By Ropes Or Cables, Or Work On A Yo-Yo Cat: $.60 Per Hour Additional | $63.54 | $32.53 | $96.07 |
| Up To And Including 1 Cu. Yd.; Cranes 45 Tons And Under; Self-Propelled Boom-Type Lifting Device 45 Tons And Under; Footnote: Work Suspended By Ropes Or Cables, Or Work On A Yo-Yo Cat: $.60 Per Hour Additional | $64.34 | $32.53 | $96.87 |
| Truck-Mounted Rotating Telescopic Boom Type Lifting Device, Manitex Or Similar (Boom Truck) Over 15 Tons; Truck-Mounted Rotating Telescopic Boom Type Lifting Device, Manitex Or Similar (Boom Truck) - Under 15 Tons; Footnote: Work Suspended By Ropes Or Cables, Or Work On A Yo-Yo Cat: $.60 Per Hour Additional | $61.30 | $32.53 | $93.83 |
| Over 7 Cu. Yds.; Crane, Over 100 Tons; Derrick, Over 100 Tons; Derrick Barge Pedestal-Mounted, Over 100 Tons; Self-Propelled Boom-Type Lifting Device, Over 100 Tons Footnote: Work Suspended By Ropes Or Cables, Or Work On A Yo-Yo Cat: $.60 Per Hour Additional | $68.59 | $32.53 | $101.12 |
| Only); Pipe Wrapping Machine (Tractor Propelled And Supported); Screed (Except Asphaltic Concrete Paving); Self- Propelled Pipeline Wrapping Machine; Tractor; Self-Loading Chipper; Concrete Barrier Moving Machine Footnote: Work Suspended By Ropes Or Cables, Or Work On A Yo-Yo Cat: $.60 Per Hour Additional | $59.98 | $32.53 | $92.51 |
| Rig; Unlicensed Constuction Work Boat Operator, On Site; Timber Skidder; Track Loader Up To 4 Yds.; Tractor-Drawn Scraper; Tractor, Compressor Drill Combination; Welder; Woods-Mixer (And Other Similar Pugmill Equipment) Footnote: Work Suspended By Ropes Or Cables, Or Work On A Yo-Yo Cat: $.60 Per Hour Additional | $62.57 | $32.53 | $95.10 |
| Operator: Power Equipment, Piledriving - Area 1:: Group 3 (Truck Crane Oiler) | $45.12 | $31.15 | $76.27 |
| Operator: Power Equipment, Piledriving - Area 1:: Group 3 (Oiler) | $42.89 | $31.15 | $74.04 |
| Operator: Power Equipment, Piledriving - Area 1:: Group 3 (Lifting Devices) | $49.14 | $31.15 | $80.29 |
| Operator: Power Equipment, Piledriving - Area 1:: Group 2 (Truck Crane Oiler) | $45.41 | $31.15 | $76.56 |
| Operator: Power Equipment, Piledriving - Area 1:: Group 2 (Oiler) | $43.11 | $31.15 | $74.26 |
| Operator: Power Equipment, Piledriving - Area 1:: Group 2 (Lifting Devices) | $50.82 | $31.15 | $81.97 |
| Operator: Power Equipment, Piledriving - Area 1:: Group 1 (Truck Crane Oiler) | $45.66 | $31.15 | $76.81 |
| Operator: Power Equipment, Piledriving - Area 1:: Group 1 (Oiler) | $43.38 | $31.15 | $74.53 |
| Operator: Power Equipment, Piledriving - Area 1:: Group 1 (Lifting Devices) | $52.64 | $31.15 | $83.79 |
| Lifting Devices: Group 4: Assistant Operator In Lieu Of Assistant To Engineer; Forklift, 10 Tons And Over; Heavy-Duty Repairperson/Welder Footnote: Work Suspended By Ropes Or Cables, Or Work On A Yo-Yo Cat: $.60 Per Hour Additional. ..........$ 47.47 31.15 Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Underground: (Group 5) | $58.09 | $32.53 | $90.62 |
| Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Underground: (Group 4) | $59.23 | $32.53 | $91.76 |
| Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Underground: (Group 3) | $60.37 | $32.53 | $92.90 |
| Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Underground: (Group 2) | $61.70 | $32.53 | $94.23 |
| Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Underground: (Group 1-A) | $65.43 | $32.53 | $97.96 |
| Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Underground: (Group 1) | $62.96 | $32.53 | $95.49 |
| Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Shafts, Stopes, Raises: (Group 5) | $58.19 | $32.53 | $90.72 |
| Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Shafts, Stopes, Raises: (Group 4) | $59.33 | $32.53 | $91.86 |
| Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Shafts, Stopes, Raises: (Group 3) | $60.47 | $32.53 | $93.00 |
| Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Shafts, Stopes, Raises: (Group 2) | $61.80 | $32.53 | $94.33 |
| Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Shafts, Stopes, Raises: (Group 1-A) | $65.53 | $32.53 | $98.06 |
| Operator: Power Equipment, Tunnel And Underground Work - Area 1:: Shafts, Stopes, Raises: (Group 1) | $63.06 | $32.53 | $95.59 |
| Operator: Power Equipment, Steel Erection - Area 1: Cranes: Group 2: Crane Over 45 Tons To 100 Tons; Derrick Under 100 Tons; Self-Propelled Boom-Type Lifting Device Over 45 Tons To 100 Tons; Tower Crane Footnote: Work Suspended By Ropes Or Cables, Or Work On A Yo-Yo Cat: $.60 Per Hour Additional | $67.04 | $32.53 | $99.57 |
| Operator: Power Equipment, Steel Erection - Area 1: Cranes: Group 1: Crane Over 100 Tons; Derrick Over 100 Tons; Self- Propelled Boom-Type Lifting Device Over 100 Tons Footnote: Work Suspended By Ropes Or Cables, Or Work On A Yo-Yo Cat: $.60 Per Hour Additional | $68.81 | $32.53 | $101.34 |
| Operator: Power Equipment, Steel Erection - Area 1: Crane: Group 4: Chicago Boom; Forklift, 10 Tons And Over; Heavy-Duty Repair Person/Welder Group 5: Boom Cat Footnote: Work Suspended By Ropes Or Cables, Or Work On A Yo-Yo Cat: $.60 Per Hour Additional | $63.54 | $32.53 | $96.07 |
| Up To And Including 1 Cu. Yd.; Cranes 45 Tons And Under; Self-Propelled Boom-Type Lifting Device 45 Tons And Under; Footnote: Work Suspended By Ropes Or Cables, Or Work On A Yo-Yo Cat: $.60 Per Hour Additional | $64.34 | $32.53 | $96.87 |
| Truck-Mounted Rotating Telescopic Boom Type Lifting Device, Manitex Or Similar (Boom Truck) Over 15 Tons; Truck-Mounted Rotating Telescopic Boom Type Lifting Device, Manitex Or Similar (Boom Truck) - Under 15 Tons; Footnote: Work Suspended By Ropes Or Cables, Or Work On A Yo-Yo Cat: $.60 Per Hour Additional | $61.30 | $32.53 | $93.83 |
| Over 7 Cu. Yds.; Crane, Over 100 Tons; Derrick, Over 100 Tons; Derrick Barge Pedestal-Mounted, Over 100 Tons; Self-Propelled Boom-Type Lifting Device, Over 100 Tons Footnote: Work Suspended By Ropes Or Cables, Or Work On A Yo-Yo Cat: $.60 Per Hour Additional | $68.59 | $32.53 | $101.12 |
| Only); Pipe Wrapping Machine (Tractor Propelled And Supported); Screed (Except Asphaltic Concrete Paving); Self- Propelled Pipeline Wrapping Machine; Tractor; Self-Loading Chipper; Concrete Barrier Moving Machine Footnote: Work Suspended By Ropes Or Cables, Or Work On A Yo-Yo Cat: $.60 Per Hour Additional | $59.98 | $32.53 | $92.51 |
| Rig; Unlicensed Constuction Work Boat Operator, On Site; Timber Skidder; Track Loader Up To 4 Yds.; Tractor-Drawn Scraper; Tractor, Compressor Drill Combination; Welder; Woods-Mixer (And Other Similar Pugmill Equipment) Footnote: Work Suspended By Ropes Or Cables, Or Work On A Yo-Yo Cat: $.60 Per Hour Additional | $62.57 | $32.53 | $95.10 |
| Area 2: Remainder Tehama County: Area 1: All But The Western Border With Mendocino & Trinity Counties Area 2: Remainder Trinity County: Area 1: East Central Part And The Northeastern Border With Shasta County Area 2: Remainder Tuolumne County: Area 1: Except Eastern Part Area 2: Eastern Part | $53.23 | $39.55 | $92.78 |
| Area 2: Remainder Tehama County: Area 1: All But The Western Border With Mendocino & Trinity Counties Area 2: Remainder Trinity County: Area 1: East Central Part And The Northeastern Border With Shasta County Area 2: Remainder Tuolumne County: Area 1: Except Eastern Part Area 2: Eastern Part | $56.53 | $39.55 | $96.08 |
| Northwestern Corner Area 2: Remainder Tehama County: Area 1: All But The Western Border With Mendocino & Trinity Counties Area 2: Remainder Trinity County: Area 1: East Central Part And The Northeastern Border With Shasta County Area 2: Remainder Tuolumne County: Area 1: Except Eastern Part Area 2: Eastern Part | $57.65 | $39.55 | $97.20 |
| Northwestern Corner Area 2: Remainder Tehama County: Area 1: All But The Western Border With Mendocino & Trinity Counties Area 2: Remainder Trinity County: Area 1: East Central Part And The Northeastern Border With Shasta County Area 2: Remainder Tuolumne County: Area 1: Except Eastern Part Area 2: Eastern Part | $62.61 | $39.55 | $102.16 |
| Area 2: Remainder Tehama County: Area 1: All But The Western Border With Mendocino & Trinity Counties Area 2: Remainder Trinity County: Area 1: East Central Part And The Northeastern Border With Shasta County Area 2: Remainder Tuolumne County: Area 1: Except Eastern Part Area 2: Eastern Part | $51.23 | $39.55 | $90.78 |
| Area 2: Remainder Tehama County: Area 1: All But The Western Border With Mendocino & Trinity Counties Area 2: Remainder Trinity County: Area 1: East Central Part And The Northeastern Border With Shasta County Area 2: Remainder Tuolumne County: Area 1: Except Eastern Part Area 2: Eastern Part | $54.53 | $39.55 | $94.08 |
| Northwestern Corner Area 2: Remainder Tehama County: Area 1: All But The Western Border With Mendocino & Trinity Counties Area 2: Remainder Trinity County: Area 1: East Central Part And The Northeastern Border With Shasta County Area 2: Remainder Tuolumne County: Area 1: Except Eastern Part Area 2: Eastern Part | $60.61 | $39.55 | $100.16 |
| Northwestern Corner Area 2: Remainder Tehama County: Area 1: All But The Western Border With Mendocino & Trinity Counties Area 2: Remainder Trinity County: Area 1: East Central Part And The Northeastern Border With Shasta County Area 2: Remainder Tuolumne County: Area 1: Except Eastern Part Area 2: Eastern Part | $55.65 | $39.55 | $95.20 |
| Operator: Power Equipment, Landscape Work Only: Group 3 (Area 2) | $49.64 | $28.56 | $78.20 |
| Operator: Power Equipment, Landscape Work Only: Group 3 (Area 1) | $47.64 | $28.56 | $76.20 |
| Operator: Power Equipment, Landscape Work Only: Group 2 (Area 2) | $54.25 | $28.56 | $82.81 |
| Operator: Power Equipment, Landscape Work Only: Group 2 (Area 1) | $52.25 | $28.56 | $80.81 |
| Operator: Power Equipment, Landscape Work Only: Group 1 (Area 2) | $57.85 | $28.56 | $86.41 |
| Operator: Power Equipment, Landscape Work Only: Group 1 (Area 1) | $55.85 | $28.56 | $84.41 |
| Ironworker (Ornamental, Reinforcing And Structural) | $50.70 | $35.15 | $85.85 |
| Ironworker (Fence Erector) | $45.78 | $26.51 | $72.29 |
| Laborer: Traffic Control/Lane Closure: Traffic Control Person Ii Installation And Removal Of Temporary/Permanent Signs, Markers, Delineators And Crash Cushions | $34.06 | $27.30 | $61.36 |
| Laborer: Traffic Control/Lane Closure: Traffic Control Person I Layout Of Traffic Control, Crash Cushions, Construction Area And Roadside Signage | $36.56 | $27.30 | $63.86 |
| Laborer: Traffic Control/Lane Closure: Escort Driver, Flag Person | $36.26 | $27.30 | $63.56 |
| Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts (Not Applicable To Workers Entitled To Receive The Wage Rate Set Forth In Group 1-A): $0.25 Per Hour Additional. Laborer Classifications | $35.35 | $27.30 | $62.65 |
| With Or From Bos'N Chairs, Swinging Scaffolds, Belts (Not Applicable To Workers Entitled To Receive The Wage Rate Set Forth In Group 1-A): $0.25 Per Hour Additional. Laborer Classifications | $35.50 | $27.30 | $62.80 |
| Laborers:, Gunite: Group 4: Gunite Laborer Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts (Not Applicable To Workers Entitled To Receive The Wage Rate Set Forth In Group 1-A): $0.25 Per Hour Additional | $35.25 | $27.30 | $62.55 |
| Group 1-A): $0.25 Per Hour Additional. .$ 35.96 27.30 Laborers:, Gunite: Group 1: Structural Nozzleman Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts (Not Applicable To Workers Entitled To Receive The Wage Rate Set Forth In Group 1-A): $0.25 Per Hour Additional | $36.46 | $27.30 | $63.76 |
| Laborers:, Gunite: Group 3: Reboundman Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts (Not Applicable To Workers Entitled To Receive The Wage Rate Set Forth In Group 1-A): $0.25 Per Hour Additional | $35.37 | $27.30 | $62.67 |
| Cleaning And Oiling And Moving To The Next Point Of Erection"". Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts (Not Applicable To Workers Entitled To Receive The Wage Rate Set Forth In Group 1-A): $0.25 Per Hour Additional. Laborer Classifications | $28.94 | $27.30 | $56.24 |
| Victaulic Or Similar; Tool Room Attendant (Jobsite Only) Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts (Not Applicable To Workers Entitled To Receive The Wage Rate Set Forth In Group 1-A): $0.25 Per Hour Additional. Laborer Classifications | $35.25 | $27.30 | $62.55 |
| In Groups 1 Through 1-F; Jacking Of Pipe - Under 12 Inches Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts (Not Applicable To Workers Entitled To Receive The Wage Rate Set Forth In Group 1-A): $0.25 Per Hour Additional. Laborer Classifications | $35.35 | $27.30 | $62.65 |
| Bull Float In Connection With Laborers' Work; Vibrator Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts (Not Applicable To Workers Entitled To Receive The Wage Rate Set Forth In Group 1-A): $0.25 Per Hour Additional. Laborer Classifications | $35.50 | $27.30 | $62.80 |
| Wire Winding Machine In Connection With Guniting Or Shot Crete Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts (Not Applicable To Workers Entitled To Receive The Wage Rate Set Forth In Group 1-A): $0.25 Per Hour Additional. Laborer Classifications | $36.08 | $27.30 | $63.38 |
| Worked On Or In The Excavation Of The Footing From The Date Of Inception. Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts (Not Applicable To Workers Entitled To Receive The Wage Rate Set Forth In Group 1-A): $0.25 Per Hour Additional. Laborer Classifications | $36.05 | $27.30 | $63.35 |
| Work; Synthetic Thermoplastics And Similar Type Welding Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts (Not Applicable To Workers Entitled To Receive The Wage Rate Set Forth In Group 1-A): $0.25 Per Hour Additional. Laborer Classifications | $35.55 | $27.30 | $62.85 |
| Scalers (Including Drilling Of Same); Tree Topper; Bit Grinder Footnotes: Laborers Working Off Or With Or From Bos'N Chairs, Swinging Scaffolds, Belts (Not Applicable To Workers Entitled To Receive The Wage Rate Set Forth In Group 1-A): $0.25 Per Hour Additional. Laborer Classifications | $35.72 | $27.30 | $63.02 |
| Above Their Regular Rate For All Work Performed On Underground Structures Not Specifically Covered Herein. This Paragraph Shall Not Be Construed To Apply To Work Below Ground Level In Open Cut. It Shall Apply To Cut And Cover Work Of Subway Construction After The Temporary Cover Has Been Placed | $36.20 | $27.30 | $63.50 |
| Construction) | $35.25 | $27.30 | $62.55 |
| Gardeners, Horticultural & Landscape Laborers (Establishment Warranty Period) | $28.94 | $27.30 | $56.24 |
| Tunnel And Shaft Laborers: Shotcrete Specialist (Tulare County) | $46.41 | $27.72 | $74.13 |
| Tunnel And Shaft Laborers: Group 5 Grout Crew; Reboundman; Swamper/ Brakeman (Tulare County) | $44.42 | $27.72 | $72.14 |
| Tunnel And Shaft Laborers: Group 4 Vibrator Operator, Pavement Breaker; Bull Gang - Muckers, Trackmen; Concrete Crew - Includes Rodding And Spreading, Dumpmen (Any Method) (Tulare County) | $44.96 | $27.72 | $72.68 |
| Erector, Tunnel Muck Hauler, Steel Form Raiser And Setter; Timberman, Retimberman (Wood Or Steel Or Substitute Materials Therefore); Tugger (For Tunnel Laborer Work); Cable Tender; Chuck Tender; Powderman - Primer House (Tulare County) | $45.41 | $27.72 | $73.13 |
| Tunnel And Shaft Laborers: Group 2 Rodmen; Shaft Work & Raise (Below Actual Or Excavated Ground Level) (Tulare County) | $45.66 | $27.72 | $73.38 |
| Tunnel And Shaft Laborers: Group 1 Diamond Driller; Groundmen; Gunite And Shotcrete Nozzlemen (Tulare County) | $45.89 | $27.72 | $73.61 |
| Painter Footnote: Sandblast/Spray Painting: $1.00 Per Hour Additional. Work Over 30 Feet (Does Not Include Work From A Lift): $1.00 Per Hour Additional | $36.57 | $22.69 | $59.26 |
| Parking Lot Striping/Highway Marking: Highway Improvement: Group 3 Protective Coating, Pavement Sealing | $35.11 | $17.62 | $52.73 |
| Parking Lot Striping/Highway Marking: Highway Improvement: Group 1 Striper: Layout And Application Of Painted Traffic Stripes And Marking; Hot Thermo Plastic; Tape, Traffic Stripes And Markings | $40.83 | $17.62 | $58.45 |
| Parking Lot Striping/Highway Marking: Highway Improvememt: Group 2 Gamecourt & Playground Installer | $34.71 | $17.62 | $52.33 |
| Cement Mason/Concrete Finisher | $32.15 | $23.27 | $55.42 |
| Plumber & Steamfitter | $51.65 | $41.59 | $93.24 |
| Underground Utility Worker / Landscape Fitter | $36.01 | $18.50 | $54.51 |
| Similar Type; Slurry Truck: Use Dump Truck Yardage Rate. Heater Planer; Asphalt Burner; Scarifier Burner; Industrial Lift Truck (Mechanical Tailgate); Utility And Clean-Up Truck: Use Appropriate Rate For The Power Unit Or The Equipment Utilized. Truck Driver Classifications | $44.56 | $34.28 | $78.84 |
| Similar Type; Slurry Truck: Use Dump Truck Yardage Rate. Heater Planer; Asphalt Burner; Scarifier Burner; Industrial Lift Truck (Mechanical Tailgate); Utility And Clean-Up Truck: Use Appropriate Rate For The Power Unit Or The Equipment Utilized. Truck Driver Classifications | $44.21 | $34.28 | $78.49 |
| Trucks; Dumpster Or Similar Type; Slurry Truck: Use Dump Truck Yardage Rate. Heater Planer; Asphalt Burner; Scarifier Burner; Industrial Lift Truck (Mechanical Tailgate); Utility And Clean-Up Truck: Use Appropriate Rate For The Power Unit Or The Equipment Utilized. Truck Driver Classifications | $43.86 | $34.28 | $78.14 |
| Pre-Batch Concrete Mix Trucks; Dumpster Or Similar Type; Slurry Truck: Use Dump Truck Yardage Rate. Heater Planer; Asphalt Burner; Scarifier Burner; Industrial Lift Truck (Mechanical Tailgate); Utility And Clean-Up Truck: Use Appropriate Rate For The Power Unit Or The Equipment Utilized. Truck Driver Classifications | $43.56 | $34.28 | $77.84 |
| Trucks; Dumpster Or Similar Type; Slurry Truck: Use Dump Truck Yardage Rate. Heater Planer; Asphalt Burner; Scarifier Burner; Industrial Lift Truck (Mechanical Tailgate); Utility And Clean-Up Truck: Use Appropriate Rate For The Power Unit Or The Equipment Utilized. Truck Driver Classifications | $43.26 | $34.28 | $77.54 |
Service Contract Act rates (services)
Minimum pay for service employees on federal service contracts over $2,500 in San Joaquin County, California: cleaning, guards, grounds, maintenance and more.
Service Contract Act: California Counties of San Joaquin
Wage determination 2015-5653, revision 28, updated 8/27/2026. Health & welfare: $5.92 per hour on top of the rates.
| Code | Occupation | Hourly rate |
|---|---|---|
| 01011 | Accounting Clerk I | $21.54 |
| 01111 | General Clerk I | $19.14 |
| 07010 | Baker | $19.56 |
| 07130 | Food Service Worker | $18.05 |
| 07260 | Waiter/Waitress | $16.57 |
| 11030 | Cleaner, Vehicles | $17.78 |
| 11090 | Gardener | $25.62 |
| 11150 | Janitor | $19.30 |
| 11210 | Laborer, Grounds Maintenance | $20.96 |
| 11240 | Maid or Houseman | $17.94 |
| 23021 | Aircraft Mechanic I | $38.58 |
| 23022 | Aircraft Mechanic II | $40.06 |
| 23160 | Electrician, Maintenance | $36.74 |
| 23181 | Electronics Technician Maintenance I | $37.62 |
| 23370 | General Maintenance Worker | $28.65 |
| 23470 | Laborer | $22.75 |
| 27101 | Guard I | $18.52 |
| 27102 | Guard II | $20.72 |
| 31260 | Parking and Lot Attendant | $16.40 |
| 31361 | Truckdriver, Light | $22.39 |
All 346 occupations
| Code | Occupation | Hourly rate |
|---|---|---|
| 01011 | Accounting Clerk I | $21.54 |
| 01012 | Accounting Clerk II | $24.17 |
| 01013 | Accounting Clerk III | $27.04 |
| 01020 | Administrative Assistant | $38.14 |
| 01035 | Court Reporter | $31.05 |
| 01041 | Customer Service Representative I | $19.63 |
| 01042 | Customer Service Representative II | $21.42 |
| 01043 | Customer Service Representative III | $24.03 |
| 01051 | Data Entry Operator I | $19.45 |
| 01052 | Data Entry Operator II | $21.22 |
| 01060 | Dispatcher, Motor Vehicle | $26.82 |
| 01070 | Document Preparation Clerk | $20.77 |
| 01090 | Duplicating Machine Operator | $20.77 |
| 01111 | General Clerk I | $19.14 |
| 01112 | General Clerk II | $20.88 |
| 01113 | General Clerk III | $23.45 |
| 01120 | Housing Referral Assistant | $28.83 |
| 01141 | Messenger Courier | $20.65 |
| 01191 | Order Clerk I | $20.38 |
| 01192 | Order Clerk II | $22.24 |
| 01261 | Personnel Assistant (Employment) I | $23.23 |
| 01262 | Personnel Assistant (Employment) II | $25.99 |
| 01263 | Personnel Assistant (Employment) III | $28.98 |
| 01270 | Production Control Clerk | $27.20 |
| 01290 | Rental Clerk | $20.02 |
| 01300 | Scheduler, Maintenance | $23.11 |
| 01311 | Secretary I | $23.11 |
| 01312 | Secretary II | $25.85 |
| 01313 | Secretary III | $28.83 |
| 01320 | Service Order Dispatcher | $23.97 |
| 01410 | Supply Technician | $38.14 |
| 01420 | Survey Worker | $29.21 |
| 01460 | Switchboard Operator/Receptionist | $20.53 |
| 01531 | Travel Clerk I | $20.59 |
| 01532 | Travel Clerk II | $23.11 |
| 01533 | Travel Clerk III | $25.85 |
| 01611 | Word Processor I | $20.60 |
| 01612 | Word Processor II | $23.11 |
| 01613 | Word Processor III | $25.86 |
| 05005 | Automobile Body Repairer, Fiberglass | $30.68 |
| 05010 | Automotive Electrician | $28.65 |
| 05040 | Automotive Glass Installer | $27.10 |
| 05070 | Automotive Worker | $27.10 |
| 05110 | Mobile Equipment Servicer | $24.15 |
| 05130 | Motor Equipment Metal Mechanic | $30.21 |
| 05160 | Motor Equipment Metal Worker | $27.10 |
| 05190 | Motor Vehicle Mechanic | $30.21 |
| 05220 | Motor Vehicle Mechanic Helper | $22.70 |
| 05250 | Motor Vehicle Upholstery Worker | $25.66 |
| 05280 | Motor Vehicle Wrecker | $27.10 |
| 05310 | Painter, Automotive | $28.65 |
| 05340 | Radiator Repair Specialist | $27.10 |
| 05370 | Tire Repairer | $19.18 |
| 05400 | Transmission Repair Specialist | $30.21 |
| 07010 | Baker | $19.56 |
| 07041 | Cook I | $21.13 |
| 07042 | Cook II | $23.96 |
| 07070 | Dishwasher | $17.30 |
| 07130 | Food Service Worker | $18.05 |
| 07210 | Meat Cutter | $22.12 |
| 07260 | Waiter/Waitress | $16.57 |
| 09010 | Electrostatic Spray Painter | $24.53 |
| 09040 | Furniture Handler | $16.18 |
| 09080 | Furniture Refinisher | $23.40 |
| 09090 | Furniture Refinisher Helper | $18.59 |
| 09110 | Furniture Repairer, Minor | $21.01 |
| 09130 | Upholsterer | $23.71 |
| 11030 | Cleaner, Vehicles | $17.78 |
| 11060 | Elevator Operator | $19.30 |
| 11090 | Gardener | $25.62 |
| 11122 | Housekeeping Aide | $19.30 |
| 11150 | Janitor | $19.30 |
| 11210 | Laborer, Grounds Maintenance | $20.96 |
| 11240 | Maid or Houseman | $17.94 |
| 11260 | Pruner | $19.16 |
| 11270 | Tractor Operator | $24.08 |
| 11330 | Trail Maintenance Worker | $20.96 |
| 11360 | Window Cleaner | $21.44 |
| 12010 | Ambulance Driver | $22.61 |
| 12011 | Breath Alcohol Technician | $33.56 |
| 12012 | Certified Occupational Therapist Assistant | $43.01 |
| 12015 | Certified Physical Therapist Assistant | $39.15 |
| 12020 | Dental Assistant | $23.60 |
| 12025 | Dental Hygienist | $60.16 |
| 12030 | EKG Technician | $39.86 |
| 12035 | Electroneurodiagnostic Technologist | $39.86 |
| 12040 | Emergency Medical Technician | $22.61 |
| 12071 | Licensed Practical Nurse I | $29.99 |
| 12072 | Licensed Practical Nurse II | $33.56 |
| 12073 | Licensed Practical Nurse III | $37.42 |
| 12100 | Medical Assistant | $23.00 |
| 12130 | Medical Laboratory Technician | $36.83 |
| 12160 | Medical Record Clerk | $30.45 |
| 12190 | Medical Record Technician | $34.05 |
| 12195 | Medical Transcriptionist | $25.23 |
| 12210 | Nuclear Medicine Technologist | $73.75 |
| 12221 | Nursing Assistant I | $16.90 |
| 12222 | Nursing Assistant II | $19.02 |
| 12223 | Nursing Assistant III | $20.75 |
| 12224 | Nursing Assistant IV | $23.29 |
| 12235 | Optical Dispenser | $28.01 |
| 12236 | Optical Technician | $29.99 |
| 12250 | Pharmacy Technician | $25.08 |
| 12280 | Phlebotomist | $25.72 |
| 12305 | Radiologic Technologist | $61.77 |
| 12311 | Registered Nurse I | $36.89 |
| 12312 | Registered Nurse II | $45.12 |
| 12313 | Registered Nurse II, Specialist | $45.12 |
| 12314 | Registered Nurse III | $54.59 |
| 12315 | Registered Nurse III, Anesthetist | $54.59 |
| 12316 | Registered Nurse IV | $65.43 |
| 12317 | Scheduler (Drug and Alcohol Testing) | $41.57 |
| 12320 | Substance Abuse Treatment Counselor | $34.99 |
| 13011 | Exhibits Specialist I | $26.57 |
| 13012 | Exhibits Specialist II | $32.91 |
| 13013 | Exhibits Specialist III | $40.25 |
| 13041 | Illustrator I | $26.57 |
| 13042 | Illustrator II | $32.91 |
| 13043 | Illustrator III | $40.25 |
| 13047 | Librarian | $36.45 |
| 13050 | Library Aide/Clerk | $19.03 |
| 13058 | Library Technician | $22.63 |
| 13061 | Media Specialist I | $23.75 |
| 13062 | Media Specialist II | $26.57 |
| 13063 | Media Specialist III | $29.61 |
| 13071 | Photographer I | $22.41 |
| 13072 | Photographer II | $25.07 |
| 13073 | Photographer III | $31.06 |
| 13074 | Photographer IV | $37.99 |
| 13075 | Photographer V | $45.98 |
| 13090 | Technical Order Library Clerk | $23.90 |
| 13110 | Video Teleconference Technician | $27.95 |
| 14041 | Computer Operator I | $23.79 |
| 14042 | Computer Operator II | $26.62 |
| 14043 | Computer Operator III | $29.69 |
| 14044 | Computer Operator IV | $32.97 |
| 14045 | Computer Operator V | $36.52 |
| 14071 | Computer Programmer I | $26.50 |
| 14150 | Peripheral Equipment Operator | $23.79 |
| 14160 | Personal Computer Support Technician | $32.97 |
| 14170 | System Support Specialist | $36.52 |
| 15020 | Aircrew Training Devices Instructor (Rated) | $51.11 |
| 15060 | Educational Technologist | $50.05 |
| 15070 | Flight Instructor (Pilot) | $61.26 |
| 15080 | Graphic Artist | $29.55 |
| 15085 | Maintenance Test Pilot, Fixed, Jet/Prop | $61.26 |
| 15086 | Maintenance Test Pilot, Rotary Wing | $61.26 |
| 15088 | Non-Maintenance Test/Co-Pilot | $61.26 |
| 15090 | Technical Instructor | $24.09 |
| 15095 | Technical Instructor/Course Developer | $29.47 |
| 15110 | Test Proctor | $19.44 |
| 15120 | Tutor | $19.44 |
| 16010 | Assembler | $19.50 |
| 16030 | Counter Attendant | $19.50 |
| 16040 | Dry Cleaner | $22.28 |
| 16070 | Finisher, Flatwork, Machine | $19.50 |
| 16090 | Presser, Hand | $19.50 |
| 16110 | Presser, Machine, Drycleaning | $19.50 |
| 16130 | Presser, Machine, Shirts | $19.50 |
| 16160 | Presser, Machine, Wearing Apparel, Laundry | $19.50 |
| 16190 | Sewing Machine Operator | $23.20 |
| 16220 | Tailor | $24.13 |
| 16250 | Washer, Machine | $20.43 |
| 19010 | Machine-Tool Operator (Tool Room) | $33.23 |
| 19040 | Tool And Die Maker | $39.82 |
| 21020 | Forklift Operator | $27.18 |
| 21030 | Material Coordinator | $27.20 |
| 21040 | Material Expediter | $27.20 |
| 21050 | Material Handling Laborer | $22.75 |
| 21071 | Order Filler | $21.26 |
| 21080 | Production Line Worker (Food Processing) | $27.18 |
| 21110 | Shipping Packer | $22.00 |
| 21130 | Shipping/Receiving Clerk | $22.00 |
| 21140 | Store Worker I | $21.26 |
| 21150 | Stock Clerk | $27.42 |
| 21210 | Tools And Parts Attendant | $27.18 |
| 21410 | Warehouse Specialist | $27.18 |
| 23010 | Aerospace Structural Welder | $40.06 |
| 23019 | Aircraft Logs and Records Technician | $33.17 |
| 23021 | Aircraft Mechanic I | $38.58 |
| 23022 | Aircraft Mechanic II | $40.06 |
| 23023 | Aircraft Mechanic III | $41.60 |
| 23040 | Aircraft Mechanic Helper | $29.36 |
| 23050 | Aircraft, Painter | $36.95 |
| 23060 | Aircraft Servicer | $33.17 |
| 23080 | Aircraft Worker | $35.06 |
| 23110 | Appliance Mechanic | $35.63 |
| 23120 | Bicycle Repairer | $30.12 |
| 23125 | Cable Splicer | $37.61 |
| 23130 | Carpenter, Maintenance | $33.25 |
| 23140 | Carpet Layer | $31.81 |
| 23160 | Electrician, Maintenance | $36.74 |
| 23181 | Electronics Technician Maintenance I | $37.62 |
| 23182 | Electronics Technician Maintenance II | $39.66 |
| 23183 | Electronics Technician Maintenance III | $41.40 |
| 23260 | Fabric Worker | $32.00 |
| 23290 | Fire Alarm System Mechanic | $30.61 |
| 23310 | Fire Extinguisher Repairer | $30.12 |
| 23311 | Fuel Distribution System Mechanic | $50.86 |
| 23312 | Fuel Distribution System Operator | $40.24 |
| 23370 | General Maintenance Worker | $28.65 |
| 23380 | Ground Support Equipment Mechanic | $38.58 |
| 23381 | Ground Support Equipment Servicer | $33.17 |
| 23382 | Ground Support Equipment Worker | $35.06 |
| 23391 | Gunsmith I | $30.12 |
| 23392 | Gunsmith II | $33.80 |
| 23393 | Gunsmith III | $37.20 |
| 23430 | Heavy Equipment Mechanic | $35.58 |
| 23440 | Heavy Equipment Operator | $40.03 |
| 23460 | Instrument Mechanic | $37.20 |
| 23465 | Laboratory/Shelter Mechanic | $35.63 |
| 23470 | Laborer | $22.75 |
| 23510 | Locksmith | $35.63 |
| 23530 | Machinery Maintenance Mechanic | $36.66 |
| 23550 | Machinist, Maintenance | $24.48 |
| 23580 | Maintenance Trades Helper | $20.58 |
| 23591 | Metrology Technician I | $37.20 |
| 23592 | Metrology Technician II | $38.65 |
| 23593 | Metrology Technician III | $40.11 |
| 23640 | Millwright | $36.70 |
| 23710 | Office Appliance Repairer | $23.82 |
| 23760 | Painter, Maintenance | $24.18 |
| 23790 | Pipefitter, Maintenance | $36.43 |
| 23810 | Plumber, Maintenance | $34.89 |
| 23820 | Pneudraulic Systems Mechanic | $37.20 |
| 23850 | Rigger | $37.20 |
| 23870 | Scale Mechanic | $33.80 |
| 23890 | Sheet-Metal Worker, Maintenance | $33.22 |
| 23910 | Small Engine Mechanic | $25.41 |
| 23931 | Telecommunications Mechanic I | $34.86 |
| 23932 | Telecommunications Mechanic II | $36.64 |
| 23950 | Telephone Lineman | $48.30 |
| 23960 | Welder, Combination, Maintenance | $24.75 |
| 23965 | Well Driller | $37.20 |
| 23970 | Woodcraft Worker | $37.20 |
| 23980 | Woodworker | $30.12 |
| 24550 | Case Manager | $24.40 |
| 24570 | Child Care Attendant | $19.24 |
| 24580 | Child Care Center Clerk | $24.00 |
| 24610 | Chore Aide | $16.50 |
| 24630 | Homemaker | $24.40 |
| 25010 | Boiler Tender | $46.73 |
| 25040 | Sewage Plant Operator | $39.23 |
| 25070 | Stationary Engineer | $46.73 |
| 25190 | Ventilation Equipment Tender | $35.56 |
| 25210 | Water Treatment Plant Operator | $39.23 |
| 27004 | Alarm Monitor | $38.80 |
| 27007 | Baggage Inspector | $18.52 |
| 27008 | Corrections Officer | $51.55 |
| 27010 | Court Security Officer | $43.48 |
| 27030 | Detection Dog Handler | $20.72 |
| 27040 | Detention Officer | $51.55 |
| 27070 | Firefighter | $38.24 |
| 27101 | Guard I | $18.52 |
| 27102 | Guard II | $20.72 |
| 27131 | Police Officer I | $44.44 |
| 27132 | Police Officer II | $49.39 |
| 28041 | Carnival Equipment Operator | $22.09 |
| 28042 | Carnival Equipment Repairer | $23.50 |
| 28043 | Carnival Worker | $16.90 |
| 28210 | Gate Attendant/Gate Tender | $22.34 |
| 28310 | Lifeguard | $18.50 |
| 28350 | Park Attendant (Aide) | $25.00 |
| 28510 | Recreation Aide/Health Facility Attendant | $18.25 |
| 28515 | Recreation Specialist | $30.97 |
| 28630 | Sports Official | $19.91 |
| 28690 | Swimming Pool Operator | $26.38 |
| 29010 | Blocker And Bracer | $33.10 |
| 29020 | Hatch Tender | $33.10 |
| 29030 | Line Handler | $33.10 |
| 29041 | Stevedore I | $31.33 |
| 29042 | Stevedore II | $34.88 |
| 30021 | Archeological Technician I | $24.61 |
| 30022 | Archeological Technician II | $27.53 |
| 30023 | Archeological Technician III | $34.11 |
| 30030 | Cartographic Technician | $34.11 |
| 30040 | Civil Engineering Technician | $37.00 |
| 30051 | Cryogenic Technician I | $37.77 |
| 30052 | Cryogenic Technician II | $41.72 |
| 30061 | Drafter/CAD Operator I | $24.61 |
| 30062 | Drafter/CAD Operator II | $27.53 |
| 30063 | Drafter/CAD Operator III | $30.70 |
| 30064 | Drafter/CAD Operator IV | $37.77 |
| 30081 | Engineering Technician I | $21.23 |
| 30082 | Engineering Technician II | $23.83 |
| 30083 | Engineering Technician III | $26.66 |
| 30084 | Engineering Technician IV | $33.02 |
| 30085 | Engineering Technician V | $40.39 |
| 30086 | Engineering Technician VI | $48.87 |
| 30090 | Environmental Technician | $32.40 |
| 30095 | Evidence Control Specialist | $34.11 |
| 30210 | Laboratory Technician | $27.95 |
| 30221 | Latent Fingerprint Technician I | $35.66 |
| 30222 | Latent Fingerprint Technician II | $39.39 |
| 30240 | Mathematical Technician | $34.11 |
| 30361 | Paralegal/Legal Assistant I | $28.75 |
| 30362 | Paralegal/Legal Assistant II | $35.61 |
| 30363 | Paralegal/Legal Assistant III | $43.55 |
| 30364 | Paralegal/Legal Assistant IV | $52.69 |
| 30375 | Petroleum Supply Specialist | $41.72 |
| 30390 | Photo-Optics Technician | $34.11 |
| 30395 | Radiation Control Technician | $41.72 |
| 30461 | Technical Writer I | $34.11 |
| 30462 | Technical Writer II | $41.72 |
| 30463 | Technical Writer III | $50.48 |
| 30491 | Unexploded Ordnance (UXO) Technician I | $36.97 |
| 30492 | Unexploded Ordnance (UXO) Technician II | $44.73 |
| 30493 | Unexploded Ordnance (UXO) Technician III | $53.62 |
| 30494 | Unexploded (UXO) Safety Escort | $36.97 |
| 30495 | Unexploded (UXO) Sweep Personnel | $36.97 |
| 30501 | Weather Forecaster I | $37.77 |
| 30502 | Weather Forecaster II | $45.95 |
| 30621 | Weather Observer, Senior | $34.11 |
| 31010 | Airplane Pilot | $44.73 |
| 31020 | Bus Aide | $19.71 |
| 31030 | Bus Driver | $25.62 |
| 31043 | Driver Courier | $20.69 |
| 31260 | Parking and Lot Attendant | $16.40 |
| 31290 | Shuttle Bus Driver | $20.64 |
| 31310 | Taxi Driver | $17.43 |
| 31361 | Truckdriver, Light | $22.39 |
| 31362 | Truckdriver, Medium | $23.95 |
| 31363 | Truckdriver, Heavy | $29.40 |
| 31364 | Truckdriver, Tractor-Trailer | $29.40 |
| 99020 | Cabin Safety Specialist | $21.81 |
| 99030 | Cashier | $17.47 |
| 99050 | Desk Clerk | $17.91 |
| 99095 | Embalmer | $36.61 |
| 99130 | Flight Follower | $36.97 |
| 99251 | Laboratory Animal Caretaker I | $25.70 |
| 99252 | Laboratory Animal Caretaker II | $27.36 |
| 99260 | Marketing Analyst | $35.65 |
| 99310 | Mortician | $36.61 |
| 99410 | Pest Controller | $27.18 |
| 99510 | Photofinishing Worker | $19.43 |
| 99710 | Recycling Laborer | $30.52 |
| 99711 | Recycling Specialist | $36.11 |
| 99730 | Refuse Collector | $28.26 |
| 99810 | Sales Clerk | $18.11 |
| 99820 | School Crossing Guard | $22.67 |
| 99830 | Survey Party Chief | $44.17 |
| 99831 | Surveying Aide | $26.67 |
| 99832 | Surveying Technician | $36.54 |
| 99840 | Vending Machine Attendant | $28.30 |
| 99841 | Vending Machine Repairer | $35.00 |
| 99842 | Vending Machine Repairer Helper | $29.32 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.