Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Industrial Construction Parish, Louisiana.
Davis-Bacon Heavy
Wage determination LA20260002, revision 2, updated 1. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Carpenter: Formbuilding/Formsetting (Ascension, East Baton Rouge, Livingston And West Baton Rouge Parishes) | $32.59 | $11.06 | $43.65 |
| Carpenter: Formbuilding/Formsetting (Calcasieu Parish) | $32.59 | $11.06 | $43.65 |
| Carpenter: Formbuilding/Formsetting (Acadia, Lafayette, St. Landry And St. Martin Parishes) | $32.59 | $11.06 | $43.65 |
| Carpenter: Formbuilding/Formsetting (Bossier, Caddo, Ouachita, Rapides And Webster Parishes) | $32.59 | $11.06 | $43.65 |
| Carpenter: Formbuilding/Formsetting (Lafourche And Terrebonne Parishes) | $32.59 | $10.52 | $43.11 |
| Electrician (Lafourche And Terrebonne Parishes) | $36.00 | $16.66 | $52.66 |
| Electrician (Bossier, Caddo, And Webster Parishes) | $35.85 | $15.58 | $51.43 |
| Electrician (Ouachita Parish) | $29.55 | $14.36 | $43.91 |
| Electrician (Rapides Parish) | $30.00 | $12.03 | $42.03 |
| Electrician (Acadia, Calcasieu, Lafayette, And St. Martin Parishes) | $31.98 | $15.14 | $47.12 |
| Electrician (Ascension, East Baton Rouge, Livingston, St. Landry, And West Baton Rouge Parishes) | $29.47 | $13.50 | $42.97 |
| Truck Driver, Dump | $10.25 | $0.00 | $10.25 |
| Power Equipment Operators: Winch | $11.38 | $0.00 | $11.38 |
| Power Equipment Operators: Water Well Driller | $11.91 | $2.44 | $14.35 |
| Power Equipment Operators: Trackhoe | $12.64 | $0.00 | $12.64 |
| Power Equipment Operators: Oiler | $8.59 | $2.50 | $11.09 |
| Power Equipment Operators: Motor Grader/Blade | $11.75 | $0.00 | $11.75 |
| Power Equipment Operators: Front End Loader | $11.50 | $0.00 | $11.50 |
| Power Equipment Operators: Dragline | $15.16 | $0.00 | $15.16 |
| Power Equipment Operators: Crane | $16.62 | $3.28 | $19.90 |
| Power Equipment Operators: Bulldozer | $13.83 | $0.00 | $13.83 |
| Power Equipment Operators: Backhoe/Excavator | $13.01 | $0.00 | $13.01 |
| Laborers: Pipelayer | $9.45 | $0.00 | $9.45 |
| Laborers: Common | $8.20 | $0.00 | $8.20 |
| Cement Mason/Concrete Finisher | $13.77 | $0.00 | $13.77 |
| Carpenter (All Other Work) | $12.81 | $0.00 | $12.81 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.