Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Humphreys Excludes Flood Control County, Mississippi.
Davis-Bacon Heavy
Wage determination MS20260066, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Ironworker: Structural | $21.00 | $8.81 | $29.81 |
| Truck Driver: Dump Truck, Includes Water Sewer Lines | $11.66 | $0.00 | $11.66 |
| Operator: Bulldozer, Includes Water Sewer Lines | $16.31 | $0.00 | $16.31 |
| Operator: Backhoe/Excavator/Trackhoe, Includes Water Sewer Lines | $16.29 | $1.71 | $18.00 |
| Laborer: Pipelayer, Includes Water Sewer Lines | $13.29 | $1.88 | $15.17 |
| Laborer: Common Or General, Includes Water Sewer Lines | $11.27 | $1.71 | $12.98 |
| Ironworker, Reinforcing | $18.50 | $0.00 | $18.50 |
| Electrician | $21.09 | $7.61 | $28.70 |
| Cement Mason/Concrete Finisher, Includes Water Sewer Lines | $14.95 | $0.00 | $14.95 |
| Carpenter (Form Work Only) | $16.76 | $0.00 | $16.76 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.