Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Perry Excludes Flood Control County, Mississippi.
Davis-Bacon Heavy
Wage determination MS20260063, revision 2, updated 1. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Electrician | $32.90 | $11.10 | $44.00 |
| Truck Driver: Dump Truck, Includes Water Sewer Lines | $16.03 | $0.95 | $16.98 |
| Operator: Crane | $22.66 | $4.66 | $27.32 |
| Operator: Bulldozer | $18.85 | $1.18 | $20.03 |
| Operator: Backhoe/Excavator/Trackhoe | $17.39 | $0.86 | $18.25 |
| Laborer: Pipelayer, Includes Water Sewer Lines | $14.04 | $1.92 | $15.96 |
| Laborer: Common Or General, Includes Water Sewer Lines | $12.93 | $0.00 | $12.93 |
| Ironworker, Structural | $19.00 | $0.00 | $19.00 |
| Ironworker, Reinforcing | $20.63 | $0.00 | $20.63 |
| Cement Mason/Concrete Finisher | $17.75 | $0.00 | $17.75 |
| Carpenter, Includes Form Work | $16.77 | $0.00 | $16.77 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.