Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Clark County, Montana.
Davis-Bacon Highway
Wage determination MT20260080, revision 3, updated 1. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Carpenter: Carpenter | $43.78 | $17.07 | $60.85 |
| Carpenter: Millwright | $49.79 | $20.79 | $70.58 |
| Cement Mason/Concrete Finisher | $44.98 | $20.50 | $65.48 |
| Diver: Stand-By | $60.76 | $20.22 | $80.98 |
| Electrician | $48.31 | $22.00 | $70.31 |
| Electrician (Line Construction): Equipment Operator | $55.14 | $23.37 | $78.51 |
| Electrician (Line Construction): Groundman | $37.43 | $21.85 | $59.28 |
| Electrician (Line Construction): Lineman | $62.60 | $24.46 | $87.06 |
| Ironworker: Reinforcing Iron And Rebar Workers | $42.70 | $28.92 | $71.62 |
| Ironworker: Structural Iron And Steel Workers | $38.31 | $27.91 | $66.22 |
| Laborer: Group 1 Flag Person For Traffic Control | $30.48 | $13.60 | $44.08 |
| Houseman And Traffic Control Worker | $33.96 | $13.60 | $47.56 |
| Rigger; Sandblaster; Sod-Cutter-Power And Tampers | $34.21 | $13.60 | $47.81 |
| Air Arc | $35.33 | $13.60 | $48.93 |
| Painter | $39.60 | $14.12 | $53.72 |
| Pile Bucks | $43.78 | $17.07 | $60.85 |
| Cranes & Shovels; Pumpman | $35.72 | $14.05 | $49.77 |
| Washing/Screening Plant | $38.00 | $14.05 | $52.05 |
| Truck, Articulating Trucks, Vac Truck | $39.27 | $14.05 | $53.32 |
| Scraper | $40.60 | $14.05 | $54.65 |
| Hoist | $46.15 | $14.05 | $60.20 |
| Truck Driver: Group 1 Pilot Car | $31.03 | $13.83 | $44.86 |
| Warehouse Expeditor; Water Trucks | $39.31 | $13.83 | $53.14 |
Davis-Bacon Residential
Wage determination MT20260007, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Truck Drivers: (3) Flat Trucks: (Over 3 Tons) | $9.71 | $1.35 | $11.06 |
| Truck Drivers: (2) Flat Trucks: (3 Tons And Under) | $9.51 | $1.35 | $10.86 |
| Truck Drivers: (1) Pickup Hauling Materials | $9.46 | $1.35 | $10.81 |
| Sheet Metal Worker | $10.81 | $1.96 | $12.77 |
| Power Equipment Operators: (3) Rubber Tired Front End Loader (Over 1 Cu Yd To 3 Cu Yd, Track Type Tractor W/Wo Attachments) | $10.76 | $1.62 | $12.38 |
| Power Equipment Operators: (2) Rubber Tired Front End Loader (1 Cu Yd And Under) | $10.47 | $1.62 | $12.09 |
| Power Equipment Operators: (1) Forklift | $10.57 | $1.62 | $12.19 |
| Plumber | $12.60 | $1.99 | $14.59 |
| Painter (Brush, Roller Up To 9"")....................$ 9.77 1.06 Laborer, General | $8.60 | $1.13 | $9.73 |
| Electrician | $10.90 | $1.73 | $12.63 |
| Carpenter | $9.30 | $1.47 | $10.77 |
| Bricklayer | $11.35 | $1.15 | $12.50 |
Davis-Bacon Residential
Wage determination MT20260008, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Truck Driver | $10.40 | $1.52 | $11.92 |
| Power Equipment Operator (Front End Loader) | $11.46 | $1.92 | $13.38 |
| Plumber | $12.61 | $1.96 | $14.57 |
| Painter: Brush Only | $9.77 | $1.06 | $10.83 |
| Laborer | $8.60 | $1.13 | $9.73 |
| Electrician | $10.90 | $1.68 | $12.58 |
| Drywall Taper And Finisher | $9.77 | $1.06 | $10.83 |
| Carpenter | $9.30 | $0.00 | $9.30 |
| Bricklayer | $12.05 | $0.00 | $12.05 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.