Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Mcclain Excludes Heavy Dredging County, Oklahoma.
Davis-Bacon Heavy
Wage determination OK20260029, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Power Equipment Operator: Group 6 Roller (Asphalt And Dirt) | $30.87 | $19.05 | $49.92 |
| Power Equipment Operator: Group 4 Cranes With Boom Incl. Jib Less Than 100 Ft And Less Than 3 Cu. Yd.; Overhead Monorail Crane And Bulldozer | $34.07 | $19.05 | $53.12 |
| Power Equipment Operator: Group 3 All Crane Type Equipment 50 Ton Capacity And Larger Cranes, And Less Than 100 Ton Capacity. Crane Equipment (As Rated By Mfg.) 3 Cu. Yd. And Over Guy Derrick Whirley Power Driven Hole Digger (With 30' And Longer Mast) | $35.40 | $19.05 | $54.45 |
| Power Equipment Operator: Group 2 All Crane Type Equipment 100 Ton Capacity And Larger Cranes, And Less Than 200 Ton Capacity | $36.14 | $19.05 | $55.19 |
| Power Equipment Operator: Group 10 Oiler | $27.25 | $19.05 | $46.30 |
| Power Equipment Operator: Group 1 All Crane Type Equipment 200 Ton And Larger And Including 400 Ton Capacity Cranes. All Tower Cranes | $38.09 | $19.05 | $57.14 |
| Ironworker (Structural, Reinforcing, And Ornamental) | $32.10 | $17.38 | $49.48 |
| Truck Driver: Dump Truck | $16.50 | $0.74 | $17.24 |
| Operator: Trackhoe | $17.50 | $2.78 | $20.28 |
| Operator: Scraper | $16.00 | $1.55 | $17.55 |
| Operator: Mechanic | $19.61 | $9.39 | $29.00 |
| Operator: Loader (Front End) | $13.51 | $0.00 | $13.51 |
| Operator: Grader/Blade | $17.76 | $3.87 | $21.63 |
| Operator: Drill | $17.15 | $0.78 | $17.93 |
| Operator: Backhoe/Excavator | $18.17 | $6.28 | $24.45 |
| Laborer: Pipelayer | $11.13 | $0.00 | $11.13 |
| Laborer: Common Or General | $11.81 | $1.09 | $12.90 |
| Form Worker | $11.77 | $0.00 | $11.77 |
| Electrician | $22.00 | $4.76 | $26.76 |
| Cement Mason/Concrete Finisher | $12.49 | $1.23 | $13.72 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.