Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Deschutes Excludes Dredging County, Oregon.
Davis-Bacon Heavy
Wage determination OR20260055, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Carpenters: (Including Form Work) | $53.94 | $16.81 | $70.75 |
| Electrician | $56.46 | $23.05 | $79.51 |
| Power Equipment Operator Group 6 Oiler; Bobcat/Skid Loader; Grade Checker; Crane Oiler;Asphalt Spreader; Broom Operator; Forklift | $45.81 | $16.90 | $62.71 |
| Hydraulic: Up To And Including 20,000 Lbs.; Boom Truck Operator; Drilling: Churm Drill And Earth Boring Machine Operator; Directional Drill Operator Less Than 20,000 Lbs Pullback; Concrete Pumper; Concrete Paver: Compactor; Forklift Over 5 Ton, Bulldozer 20,000 Lbs Or 100 Horses Or Less; Mixer Operator | $49.03 | $16.90 | $65.93 |
| Attachment); Rubber Tired Scraper With Tandom Scrapers; Bulldozer Over 120,000 Lbs And Above; Crane: Derrick Barge Operator 30 Ton But Less Than 150 Ton.............................................$ 54.75 16.90 Power Equipment Operator Group 1B Lattice Boom Crane: Operator, 300 Tons Through 399 Tons With Over 200 Feet Boom; Operator 400 Tons And Over | $60.98 | $16.90 | $77.88 |
| Power Equipment Operator Group 1 Crane: Helicopter Operator, When Used In Erecting Work; Whirley Operator, 90 Ton And Over; Lattice Boom Crane: Operator 200 Tons Through 299 Tons, And/Or Over 200 Feet Boom; Hydraulic Crane: Hydraulic Crane Operator 90 Tons Through 199 Tons With Luffing Or Tower Attachments; | $56.66 | $16.90 | $73.56 |
| Ironworker (Ornamental, Reinforcing, And Structural) | $48.31 | $34.52 | $82.83 |
| Laborers: (Mason Tender-Cement/Concrete) | $43.79 | $17.05 | $60.84 |
| Laborers: (Mason Tender-Brick) | $43.79 | $17.05 | $60.84 |
| Laborers: Group 3 Flagger, Traffic Control-Cone Setter | $34.39 | $17.30 | $51.69 |
| Laborers: Group 2 Vibrating Plate | $40.41 | $17.30 | $57.71 |
| Laborers: Group 1 Blaster, Demolition; Chain Saw | $39.11 | $17.30 | $56.41 |
| Painters: (Including Brush And Roller) | $39.94 | $16.68 | $56.62 |
| Cement Mason/Concrete Finisher | $46.13 | $20.31 | $66.44 |
| Truck Driver: Water Truck | $18.41 | $6.58 | $24.99 |
| Truck Driver: Off The Road Truck | $21.86 | $7.08 | $28.94 |
| Truck Driver: Lowboy Truck | $17.07 | $5.50 | $22.57 |
| Truck Driver: Dump Truck | $16.64 | $6.27 | $22.91 |
| Painter: Spray | $19.77 | $0.00 | $19.77 |
| Operator: Tractor | $20.00 | $0.73 | $20.73 |
| Operator: Roller | $26.19 | $9.67 | $35.86 |
| Operator: Mechanic | $26.57 | $9.97 | $36.54 |
| Operator: Loader | $22.91 | $7.72 | $30.63 |
| Operator: Grader/Blade | $27.54 | $9.64 | $37.18 |
| Operator: Excavator | $21.59 | $7.34 | $28.93 |
| Operator: Backhoe | $21.57 | $8.16 | $29.73 |
| Laborer: Pipelayer | $15.93 | $5.75 | $21.68 |
| Laborer: Landscape | $10.60 | $1.80 | $12.40 |
| Laborer: Grade Checker | $20.02 | $7.22 | $27.24 |
| Laborer: Form-Stripping | $19.27 | $6.32 | $25.59 |
| Laborer: Common Or General | $20.11 | $7.69 | $27.80 |
| Laborer: Asphalt Spreader | $22.18 | $9.39 | $31.57 |
| Highway/Parking Lot Striping: Painter | $23.79 | $6.57 | $30.36 |
| Truck Driver Group 1 Flatbed Truck | $35.41 | $18.30 | $53.71 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.