Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Hood River Excludes Dredging County, Oregon.
Davis-Bacon Heavy
Wage determination OR20260068, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Asbestos Worker/Heat & Frost Insulator (Pipe Insulation Only) | $62.02 | $22.36 | $84.38 |
| Millwright | $59.35 | $22.38 | $81.73 |
| Carpenter (Excluding Form Work) | $53.94 | $16.81 | $70.75 |
| Electrician | $63.50 | $29.73 | $93.23 |
| Power Equipment Operator Group 6 Oiler; Grade Checker; Crane Oiler; Forklift; Roller (Non-Asphalt) | $45.81 | $16.90 | $62.71 |
| 20,000 Lbs, Wheel Type (Ford, John Deer, Case Type); Boom Truck Operator; Drilling: Churm Drill And Earth Boring Machine Operator; Directional Drill Operator Less Than 20,000 Lbs Pullback; Forklift Over 5 Ton, Bulldozer 20,000 Lbs Or 100 Horses Or Less; Roller; Compactor Without Blade; Hoist Operator Single Drum | $49.03 | $16.90 | $65.93 |
| Boom Type Lifting Device, 5 Ton Capacity Or Less; Rubber-Tired Scraper, Single Engine, Single Scraper; Compactor-Self Propelled; Bulldozer Over 20,000 Lbs And More Than 100 Horse Up To 70,000 Lbs; Screed; Compactor With Blade; Mechanic Hoist Operator Two Or More Drums, Stiff Leg, Guy Derricl Or Similar Type 50 Ton And Over | $50.27 | $16.90 | $67.17 |
| Crane: 90 Through 199 Tons And/Or 150 To 200 Feet Boom; Hydraulic Crane: Hydraulic Crane Operator, 50 Tons Through 89 Tons (With Luffing Or Tower Attachment); Rubber Tired Scraper With Tandom Scrapers; Blade: Auto Grader; Blade Operator-Robotic; Bulldozer Over 120,000 Lbs And Above; | $54.75 | $16.90 | $71.65 |
| Power Equipment Operator Group 1B Lattice Boom Crane: Operator, 300 Tons Through 399 Tons With Over 200 Feet Boom; Operator 400 Tons And Over | $60.98 | $16.90 | $77.88 |
| Power Equipment Operator Group 1 Crane: Helicopter Operator, When Used In Erecting Work; Whirley Operator, 90 Ton And Over; Lattice Boom Crane: Operator 200 Tons Through 299 Tons, And/Or Over 200 Feet Boom; Hydraulic Crane: Hydraulic Crane Operator 90 Tons Through 199 Tons With Luffing Or Tower Attachments; | $56.66 | $16.90 | $73.56 |
| Ironworker (Reinforcing And Structural) | $48.31 | $34.52 | $82.83 |
| Laborers: (Mason Tender-Cement/Concrete) | $43.79 | $17.05 | $60.84 |
| Laborers: Group 2 Grade Checker | $40.41 | $17.30 | $57.71 |
| Laborers: Group 1 Asphalt Spreader | $39.11 | $17.30 | $56.41 |
| Painters: (Brush, Roller And Spray) | $39.94 | $16.68 | $56.62 |
| Plumbers And Pipefitters | $60.77 | $34.72 | $95.49 |
| Truck Driver: Water Truck | $26.12 | $6.53 | $32.65 |
| Truck Driver: Off The Road Truck | $31.81 | $6.33 | $38.14 |
| Truck Driver: Dump Truck | $23.79 | $5.95 | $29.74 |
| Operator: Paver (Asphalt, Aggregate, And Concrete) | $27.59 | $2.96 | $30.55 |
| Operator: Loader | $32.31 | $6.43 | $38.74 |
| Operator: Excavator | $30.12 | $6.23 | $36.35 |
| Operator: Broom/Sweeper | $32.31 | $6.43 | $38.74 |
| Operator: Bobcat/Skid Steer/Skid Loader | $22.77 | $7.90 | $30.67 |
| Operator: Backhoe | $29.80 | $7.13 | $36.93 |
| Line Construction: Groundman | $31.36 | $7.27 | $38.63 |
| Laborer: Pipelayer | $20.52 | $4.51 | $25.03 |
| Laborer: Flagger | $19.31 | $5.31 | $24.62 |
| Laborer: Fence Erection | $23.88 | $7.45 | $31.33 |
| Laborer: Common Or General | $18.57 | $6.24 | $24.81 |
| Cement Mason/Concrete Finisher | $21.13 | $8.90 | $30.03 |
| Carpenter (Form Work Only) | $23.50 | $9.27 | $32.77 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.