Prevailing wage rates in Jefferson Excludes Dredging County, Oregon

Current Davis-Bacon and Service Contract Act wage determinations for Jefferson Excludes Dredging County, Oregon (2026), from the official SAM.gov wage determinations. Updated monthly.

Davis-Bacon rates (construction)

Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Jefferson Excludes Dredging County, Oregon.

Davis-Bacon Heavy

Wage determination OR20260069, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.

TradeRateFringeTotal / hour
Millwright$59.35$22.38$81.73
Carpenter (Excluding Form Work)$53.94$16.81$70.75
Electrician$56.46$23.05$79.51
Power Equipment Operator Group 6 Oiler; Grade Checker; Crane Oiler; Forklift; Roller (Non-Asphalt)$45.81$16.90$62.71
20,000 Lbs, Wheel Type (Ford, John Deer, Case Type); Boom Truck Operator; Drilling: Churm Drill And Earth Boring Machine Operator; Directional Drill Operator Less Than 20,000 Lbs Pullback; Forklift Over 5 Ton, Bulldozer 20,000 Lbs Or 100 Horses Or Less; Roller; Compactor Without Blade; Hoist Operator Single Drum$49.03$16.90$65.93
Boom Type Lifting Device, 5 Ton Capacity Or Less; Rubber-Tired Scraper, Single Engine, Single Scraper; Compactor-Self Propelled; Bulldozer Over 20,000 Lbs And More Than 100 Horse Up To 70,000 Lbs; Screed; Compactor With Blade; Mechanic Hoist Operator Two Or More Drums, Stiff Leg, Guy Derricl Or Similar Type 50 Ton And Over$50.27$16.90$67.17
Crane: 90 Through 199 Tons And/Or 150 To 200 Feet Boom; Hydraulic Crane: Hydraulic Crane Operator, 50 Tons Through 89 Tons (With Luffing Or Tower Attachment); Rubber Tired Scraper With Tandom Scrapers; Blade: Auto Grader; Blade Operator-Robotic; Bulldozer Over 120,000 Lbs And Above;$54.75$16.90$71.65
Power Equipment Operator Group 1B Lattice Boom Crane: Operator, 300 Tons Through 399 Tons With Over 200 Feet Boom; Operator 400 Tons And Over$60.98$16.90$77.88
Power Equipment Operator Group 1 Crane: Helicopter Operator, When Used In Erecting Work; Whirley Operator, 90 Ton And Over; Lattice Boom Crane: Operator 200 Tons Through 299 Tons, And/Or Over 200 Feet Boom; Hydraulic Crane: Hydraulic Crane Operator 90 Tons Through 199 Tons With Luffing Or Tower Attachments;$56.66$16.90$73.56
Ironworker (Reinforcing And Structural)$48.31$34.52$82.83
Laborers: (Mason Tender-Cement/Concrete)$43.79$17.05$60.84
Laborers: Group 2 Grade Checker$40.41$17.30$57.71
Laborers: Group 1 Asphalt Spreader$39.11$17.30$56.41
Painters: (Brush, Roller And Spray)$39.94$16.68$56.62
Plumbers And Pipefitters$60.77$34.72$95.49
Truck Driver: Water Truck$26.12$6.53$32.65
Truck Driver: Off The Road Truck$31.81$6.33$38.14
Truck Driver: Dump Truck$23.79$5.95$29.74
Operator: Paver (Asphalt, Aggregate, And Concrete)$27.59$2.96$30.55
Operator: Loader$32.31$6.43$38.74
Operator: Excavator$30.12$6.23$36.35
Operator: Broom/Sweeper$32.31$6.43$38.74
Operator: Bobcat/Skid Steer/Skid Loader$22.77$7.90$30.67
Operator: Backhoe$29.80$7.13$36.93
Line Construction: Groundman$31.36$7.27$38.63
Laborer: Pipelayer$20.52$4.51$25.03
Laborer: Flagger$19.31$5.31$24.62
Laborer: Fence Erection$23.88$7.45$31.33
Laborer: Common Or General$24.26$0.00$24.26
Cement Mason/Concrete Finisher$21.13$8.90$30.03
Carpenter (Form Work Only)$23.50$9.27$32.77

Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.