Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Bayamo'N County, Puerto Rico.
Davis-Bacon Residential
Wage determination PR20260029, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Truck Driver: Dump Truck | $11.50 | $0.53 | $12.03 |
| Roofer | $9.05 | $0.94 | $9.99 |
| Plumber | $9.94 | $0.56 | $10.50 |
| Painter | $8.40 | $0.00 | $8.40 |
| Operator: Backhoe/Excavator/Trackhoe | $12.00 | $0.55 | $12.55 |
| Laborer: Common Or General | $7.83 | $0.65 | $8.48 |
| Electrician | $10.57 | $0.64 | $11.21 |
| Cement Mason/Concrete Finisher | $9.04 | $0.00 | $9.04 |
| Carpenter | $8.90 | $0.00 | $8.90 |
Davis-Bacon Heavy
Wage determination PR20260037, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Truck Driver: Dump Truck | $10.06 | $1.16 | $11.22 |
| Operator: Backhoe/Excavator/Trackhoe | $11.38 | $0.94 | $12.32 |
| Laborer: Pipelayer | $7.25 | $0.33 | $7.58 |
| Laborer: Common Or General | $8.48 | $0.43 | $8.91 |
| Electrician | $12.00 | $0.55 | $12.55 |
| Cement Mason/Concrete Finisher | $9.00 | $0.83 | $9.83 |
| Carpenter | $9.10 | $0.93 | $10.03 |
Davis-Bacon Building
Wage determination PR20260001, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Truck Driver | $7.25 | $0.30 | $7.55 |
| Sheet Metal Worker (Including HVAC Duct Work) | $7.25 | $0.31 | $7.56 |
| Power Equipment Operators: (Traxcavator) | $7.25 | $0.00 | $7.25 |
| Power Equipment Operators: (Loaders) | $7.25 | $0.26 | $7.51 |
| Power Equipment Operators: (Diggers) | $7.25 | $0.00 | $7.25 |
| Power Equipment Operators: (Cranes) | $7.25 | $0.00 | $7.25 |
| Plumber (Including HVAC Work) | $7.25 | $0.31 | $7.56 |
| Pipefitter | $7.25 | $0.00 | $7.25 |
| Painter | $7.25 | $0.00 | $7.25 |
| Laborer, Unskilled | $7.25 | $0.00 | $7.25 |
| Ironworker | $7.25 | $0.00 | $7.25 |
| Electrician (Including HVAC Control Wiring) | $7.25 | $0.00 | $7.25 |
| Cement Mason/Concrete Finisher | $7.25 | $0.31 | $7.56 |
| Carpenter | $7.25 | $0.34 | $7.59 |
| Bricklayer | $7.25 | $0.42 | $7.67 |
Davis-Bacon Highway
Wage determination PR20260006, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Electrician (Lineperson) | $45.80 | $19.27 | $65.07 |
| Truck Driver: Pickup Truck | $9.21 | $0.48 | $9.69 |
| Truck Driver: Dump Truck | $9.40 | $0.85 | $10.25 |
| Traffic Control: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper | $9.81 | $0.95 | $10.76 |
| Traffic Control: Flagger | $8.28 | $0.53 | $8.81 |
| Operator: Roller | $9.67 | $3.14 | $12.81 |
| Operator: Paver (Asphalt, Aggregate, And Concrete) | $10.88 | $3.15 | $14.03 |
| Operator: Mechanic | $10.19 | $0.94 | $11.13 |
| Operator: Grader/Blade | $12.53 | $1.25 | $13.78 |
| Operator: Equipment Greaser ( Grease Truck) | $9.54 | $1.15 | $10.69 |
| Operator: Crane | $12.11 | $0.91 | $13.02 |
| Operator: Bulldozer | $10.88 | $0.91 | $11.79 |
| Operator: Bobcat/Skid Steer/Skid Loader | $9.65 | $0.73 | $10.38 |
| Operator: Backhoe/Excavator/Trackhoe | $10.49 | $0.76 | $11.25 |
| Laborer: Common Or General | $7.92 | $0.43 | $8.35 |
| Laborer: Asphalt, Includes Raker, Shoveler, Spreader And Distributor | $9.40 | $0.61 | $10.01 |
| Ironworker, Structural | $8.25 | $0.57 | $8.82 |
| Highway/Parking Lot Striping: Laborer | $8.25 | $0.56 | $8.81 |
| Electrician | $8.80 | $1.22 | $10.02 |
| Cement Mason/Concrete Finisher | $8.60 | $0.47 | $9.07 |
| Carpenter | $9.16 | $0.75 | $9.91 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.