Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Barnwell Savannah River Site Only County, South Carolina.
Davis-Bacon Building, Heavy, Highway
Wage determination SC20260002, revision 2, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Asbestos Abatement Worker/Hazardous Material Handler (Includes Preparation, Wetting, Stripping, Removal, Scrapping, Vacuuming, Bagging And Disposing Of All Insulation Materials From Mechanical Systems, Whether They Contain Asbestos Or Not) | $18.15 | $0.25 | $18.40 |
| Asbestos Worker/Insulator (Includes Application Of All Insulating Materials, Protective Coverings, Coatings & Finishes To All Types Of Mechanical Systems) | $33.00 | $24.36 | $57.36 |
| Boilermaker | $40.21 | $24.26 | $64.47 |
| Bricklayer | $31.70 | $17.49 | $49.19 |
| Carpenter | $35.47 | $16.59 | $52.06 |
| Cement Mason | $30.74 | $17.31 | $48.05 |
| Electrician (Cable Splicer) | $38.75 | $18.23 | $56.98 |
| Electrician (Groundman) | $25.50 | $18.23 | $43.73 |
| Electrician (Lineman) | $37.50 | $18.23 | $55.73 |
| Elevator Constructor | $53.40 | $40.89 | $94.29 |
| Glazier | $32.74 | $14.73 | $47.47 |
| Ironworker | $37.61 | $15.72 | $53.33 |
| Laborer: (Concrete & Building) | $24.62 | $13.45 | $38.07 |
| Laborer: (Hazardous Waste Verifier) | $29.54 | $13.45 | $42.99 |
| Laborer: (Mortar Mixer) | $24.92 | $13.45 | $38.37 |
| Laborer: (Nozzleperson) | $25.12 | $13.45 | $38.57 |
| Laborer: (Pipelayer) | $24.92 | $13.45 | $38.37 |
| Laborer: (Pneumatic Concrete Gun Operator) | $25.12 | $13.45 | $38.57 |
| Laborer: (Pneumatic Tool Operator) | $24.92 | $13.45 | $38.37 |
| Laborer: (Tool Facility Operator) | $25.37 | $13.45 | $38.82 |
| Machinist | $58.87 | $10.97 | $69.84 |
| Millwright | $36.77 | $20.79 | $57.56 |
| Painter (Composite Rate Applies To All Work Performed By Journeyman Painters And Sign Painters Except When Engaged In Industrial Premium Work.) | $32.74 | $14.73 | $47.47 |
| Piledriver | $35.72 | $16.59 | $52.31 |
| Pipefitter | $40.39 | $18.56 | $58.95 |
| Plasterer | $30.74 | $17.31 | $48.05 |
| Power Equipment Operator: (Air Compressor; Concrete Mixer (10 S Or Less); Conveyor; Elevator; Hoist, 1-Drum; Light Plant; Motor Crane Driver And Oiler; Roller; Tractor (50 Hp And Over)) | $30.71 | $19.35 | $50.06 |
| Power Equipment Operator: (Backhoe; Central Mixing Plant; Concrete Placing Machine; Crane, Derrick, Dragline; Hoist, 2-Drum; Motor Grader; Shovel; Sideboom Tractor; Tower/Pedestal Crane; Hoist, 1-Drum (Hoisting Personnel); Mechanic (Diesel & Gas); Maxi Grinder) | $37.00 | $19.35 | $56.35 |
| Power Equipment Operator: (Batch Plant; Bulldozer; Concrete Mixer (Over 10 S); Distributor (Bituminous Surfaces); End Loader; Fork Lift Truck; Lead Oiler; Pan Scraper; Paving Machine; Pumpcrete; Trenching Machine; Well Drill) | $34.04 | $19.35 | $53.39 |
| Power Equipment Operator: (Fireman (Boiler)) | $27.01 | $19.35 | $46.36 |
| Power Equipment Operator: (Mechanic (Diesel & Gas)) | $37.00 | $19.35 | $56.35 |
| Power Equipment Operator: (Oiler) | $27.01 | $19.35 | $46.36 |
| Power Equipment Operator: (Pump (2-1/2 In. And Over); Tractor (Under 50 Hp); Fireperson (Boiler); Oiler) | $27.01 | $19.35 | $46.36 |
| Roofer (Built-Up, Composition And Waterproofing) | $30.53 | $10.58 | $41.11 |
| Sheet Metal Worker | $38.50 | $18.87 | $57.37 |
| Sprinkler Fitter | $39.36 | $25.55 | $64.91 |
| Tile Setter | $31.70 | $17.49 | $49.19 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.