Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Edgefield Excludes Dredging County, South Carolina.
Davis-Bacon Heavy
Wage determination SC20260051, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Ironworker, Structural | $29.75 | $18.00 | $47.75 |
| Truck Driver | $14.15 | $2.32 | $16.47 |
| Operator: Loader | $10.50 | $1.98 | $12.48 |
| Operator: Grader/Blade | $20.11 | $1.39 | $21.50 |
| Operator: Backhoe/Excavator/Trackhoe | $12.50 | $0.00 | $12.50 |
| Laborer: Pipelayer | $12.84 | $0.00 | $12.84 |
| Laborer: Common Or General | $10.69 | $0.00 | $10.69 |
| Carpenter | $14.85 | $0.00 | $14.85 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.