Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Brazoria Excludes Flood Control County, Texas.
Davis-Bacon Heavy
Wage determination TX20260032, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Sprinkler Fitter (Fire Sprinklers) | $36.15 | $24.47 | $60.62 |
| Truck Driver | $14.42 | $1.00 | $15.42 |
| Power Equipment Operator: Tractor | $11.29 | $1.45 | $12.74 |
| Power Equipment Operator: Grader | $12.20 | $1.48 | $13.68 |
| Power Equipment Operator: Front End Loader | $10.47 | $1.28 | $11.75 |
| Power Equipment Operator: Backhoe | $12.74 | $0.00 | $12.74 |
| Power Equipment Operator: (Excavator) | $16.74 | $0.00 | $16.74 |
| Power Equipment Operator: (Crane) | $11.00 | $0.74 | $11.74 |
| Power Equipment Operator: (Bulldozer) | $12.46 | $0.00 | $12.46 |
| Pipefitter | $17.00 | $0.04 | $17.04 |
| Laborers: Mason Tender Cement | $9.96 | $0.00 | $9.96 |
| Laborers: Landscape | $7.35 | $0.00 | $7.35 |
| Laborers: (Pipelayer) | $9.63 | $1.50 | $11.13 |
| Laborers: (Common) | $8.99 | $1.25 | $10.24 |
| Ironworker: Reinforcing | $11.29 | $0.00 | $11.29 |
| Formbuilder/Formsetter | $9.83 | $1.69 | $11.52 |
| Electrician | $18.40 | $1.34 | $19.74 |
| Cement Mason/Concrete Finisher | $11.37 | $1.13 | $12.50 |
| Carperter | $14.38 | $0.00 | $14.38 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.