Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Fort Bend Excludes Flood Control County, Texas.
Davis-Bacon Heavy
Wage determination TX20260054, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Sprinkler Fitter (Fire Sprinklers) | $36.15 | $24.47 | $60.62 |
| Truck Driver | $12.28 | $0.98 | $13.26 |
| Power Equipment Operator: Tractor | $12.38 | $1.51 | $13.89 |
| Power Equipment Operator: Grader | $12.20 | $1.48 | $13.68 |
| Power Equipment Operator: Front End Loader | $10.68 | $1.42 | $12.10 |
| Power Equipment Operator: Backhoe | $12.08 | $0.00 | $12.08 |
| Power Equipment Operator: (Excavator) | $16.74 | $0.00 | $16.74 |
| Power Equipment Operator: (Crane) | $12.67 | $0.45 | $13.12 |
| Power Equipment Operator: (Bulldozer) | $10.44 | $0.00 | $10.44 |
| Pipefitter | $17.00 | $0.04 | $17.04 |
| Laborers: Mason Tender Cement | $9.96 | $0.00 | $9.96 |
| Laborers: Landscape | $7.35 | $0.00 | $7.35 |
| Laborers: (Pipelayer) | $10.31 | $0.91 | $11.22 |
| Laborers: (Common) | $8.95 | $0.00 | $8.95 |
| Ironworker: Reinforcing | $11.29 | $0.00 | $11.29 |
| Formbuilder/Formsetter | $13.35 | $1.17 | $14.52 |
| Electrician | $18.40 | $1.34 | $19.74 |
| Cement Mason/Concrete Finisher | $11.37 | $1.13 | $12.50 |
| Carpenter | $14.38 | $0.00 | $14.38 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.