Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Grayson Water County, Texas.
Davis-Bacon Heavy
Wage determination TX20260019, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Welder | $9.85 | $0.00 | $9.85 |
| Truck Drivers: Single Axle, Light | $7.25 | $0.00 | $7.25 |
| Truck Drivers: Single Axle, Heavy | $7.40 | $0.00 | $7.40 |
| Truck Drivers: (Winch) | $7.25 | $0.00 | $7.25 |
| Truck Drivers: (Transit-Mix) | $7.25 | $0.00 | $7.25 |
| Truck Drivers: (Tandem Axle Or Semi-Trailer) | $7.25 | $0.00 | $7.25 |
| Truck Drivers: (Lowboy-Float) | $7.90 | $0.00 | $7.90 |
| Spreader Box Operator | $7.30 | $0.00 | $7.30 |
| Sign Erector | $8.30 | $0.00 | $8.30 |
| Servicer | $7.55 | $0.00 | $7.55 |
| Reinforcing Steel Setter (Struct.) | $9.60 | $0.00 | $9.60 |
| Reinforcing Steel Setter (Paving) | $7.25 | $0.00 | $7.25 |
| Power Equipment Operators: (Trenching Machine, Light) | $7.80 | $0.00 | $7.80 |
| Power Equipment Operators: (Trenching Machine, Heavy) | $8.00 | $0.00 | $8.00 |
| Power Equipment Operators: (Traveling Mixer) | $7.25 | $0.00 | $7.25 |
| Power Equipment Operators: (Tractor (Pneumatic) Over 80 Hp) | $7.40 | $0.00 | $7.40 |
| Power Equipment Operators: (Tractor (Pneumatic) 80 Hp & Less) | $7.35 | $0.00 | $7.35 |
| Power Equipment Operators: (Tractor (Crawler) Over 150 Hp).............................................$ 8.30 0.00 Power Equipment Operators: (Tractor (Crawler) 150 Hp & Less) | $8.00 | $0.00 | $8.00 |
| Power Equipment Operators: (Side Boom) | $7.25 | $0.00 | $7.25 |
| Power Equipment Operators: (Self-Propelled Hammer) | $7.25 | $0.00 | $7.25 |
| Power Equipment Operators: (Scraper (Over 17 Cu Yd)) | $8.30 | $0.00 | $8.30 |
| Power Equipment Operators: (Scraper (17 Cu Yd & Less)) | $7.90 | $0.00 | $7.90 |
| Power Equipment Operators: (Roller, Steel Wheel Other-Flat Wheel Or Tamping)) | $8.05 | $0.00 | $8.05 |
| Power Equipment Operators: (Roller, Steel Wheel (Plant-Mix Pavement)) | $8.10 | $0.00 | $8.10 |
| Power Equipment Operators: (Roller, Pneumatic (Self-Propelled)) | $7.25 | $0.00 | $7.25 |
| Power Equipment Operators: (Motor Grader Operator) | $9.00 | $0.00 | $9.00 |
| Power Equipment Operators: (Motor Grader Operator (Fine Grade)) | $9.75 | $0.00 | $9.75 |
| Power Equipment Operators: (Mixer (16 Cf & Less)) | $7.25 | $0.00 | $7.25 |
| Power Equipment Operators: (Front End Loader (2.5 Cu Yd Or Less)) | $8.30 | $0.00 | $8.30 |
| Power Equipment Operators: (Front End Load (Over 2.5 Cu Yd)).........................................$ 9.05 0.00 Power Equipment Operators: (Foundation Drill Operator (Truck Mounted)) | $10.05 | $0.00 | $10.05 |
| Power Equipment Operators: (Form Loader) | $7.25 | $0.00 | $7.25 |
| Power Equipment Operators: (Crusher Or Screening Plant) | $7.25 | $0.00 | $7.25 |
| Power Equipment Operators: (Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel (Less Than 1.5 Cu. Yd.)) | $9.10 | $0.00 | $9.10 |
| Power Equipment Operators: (Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel (1.5 Cu Yd And Over)) | $9.80 | $0.00 | $9.80 |
| Power Equipment Operators: (Concrete Paving Spreader) | $8.60 | $0.00 | $8.60 |
| Power Equipment Operators: (Concrete Paving Saw) | $8.30 | $0.00 | $8.30 |
| Power Equipment Operators: (Concrete Paving Joint Machine) | $8.00 | $0.00 | $8.00 |
| Power Equipment Operators: (Concrete Paving Form Grader) | $9.75 | $0.00 | $9.75 |
| Power Equipment Operators: (Concrete Paving Finishing Machine) | $9.05 | $0.00 | $9.05 |
| Power Equipment Operators: (Concrete Paving Curing Machine) | $8.40 | $0.00 | $8.40 |
| Power Equipment Operators: (Bulldozer Over 150 Hp) | $9.05 | $0.00 | $9.05 |
| Power Equipment Operators: (Bulldozer 150 Hp Or Less) | $8.05 | $0.00 | $8.05 |
| Power Equipment Operators: (Broom Or Sweeper Operator) | $8.75 | $0.00 | $8.75 |
| Power Equipment Operators: (Asphalt Paving Machine) | $8.95 | $0.00 | $8.95 |
| Power Equipment Operators: (Asphalt Distributor) | $7.85 | $0.00 | $7.85 |
| Pneumatic Mortar Operator | $7.25 | $0.00 | $7.25 |
| Pipelayer | $7.45 | $0.00 | $7.45 |
| Painter (Structures) | $10.00 | $0.00 | $10.00 |
| Oiler | $8.50 | $0.00 | $8.50 |
| Mechanic (Undefined) | $10.00 | $0.00 | $10.00 |
| Laborers: (Utility) | $7.25 | $0.00 | $7.25 |
| Laborers: (Common) | $7.25 | $0.00 | $7.25 |
| Form Setter-Structures | $8.10 | $0.00 | $8.10 |
| Form Setter - Paving & Curb | $8.55 | $0.00 | $8.55 |
| Form Liner - Paving & Curb | $8.50 | $0.00 | $8.50 |
| Form Builder (Structures) | $8.20 | $0.00 | $8.20 |
| Flagger | $7.25 | $0.00 | $7.25 |
| Electrician | $11.95 | $0.00 | $11.95 |
| Concrete Rubber | $7.25 | $0.00 | $7.25 |
| Concrete Finisher (Structures) | $8.90 | $0.00 | $8.90 |
| Concrete Finisher (Paving) | $9.20 | $0.00 | $9.20 |
| Carpenter | $9.10 | $0.00 | $9.10 |
| Batterboard Setter | $8.45 | $0.00 | $8.45 |
| Batching Plant Scale Operator | $8.50 | $0.00 | $8.50 |
| Asphalt Shoveler | $8.25 | $0.00 | $8.25 |
| Asphalt Raker | $9.00 | $0.00 | $9.00 |
| Asphalt Heater Operator | $8.00 | $0.00 | $8.00 |
| Air Tool Operator | $7.50 | $0.00 | $7.50 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.