Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Harris Excludes Flood Control County, Texas.
Davis-Bacon Heavy
Wage determination TX20260031, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Sprinkler Fitter (Fire Sprinklers) | $36.15 | $24.47 | $60.62 |
| Truck Driver | $12.02 | $1.02 | $13.04 |
| Power Equipment Operator: Tractor | $15.00 | $0.00 | $15.00 |
| Power Equipment Operator: Grader | $12.20 | $1.48 | $13.68 |
| Power Equipment Operator: Front End Loader | $12.16 | $0.00 | $12.16 |
| Power Equipment Operator: Backhoe | $13.47 | $0.00 | $13.47 |
| Power Equipment Operator: (Excavator) | $16.37 | $0.00 | $16.37 |
| Power Equipment Operator: (Crane) | $15.33 | $0.57 | $15.90 |
| Power Equipment Operator: (Bulldozer) | $12.58 | $0.00 | $12.58 |
| Pipefitter | $17.00 | $0.04 | $17.04 |
| Laborers: Mason Tender Cement | $9.94 | $0.00 | $9.94 |
| Laborers: Landscape | $7.35 | $0.00 | $7.35 |
| Laborers: (Pipelayer) | $10.14 | $0.00 | $10.14 |
| Laborers: (Common) | $8.94 | $0.00 | $8.94 |
| Ironworker: Reinforcing | $11.28 | $0.00 | $11.28 |
| Formbuilder/Formsetter | $13.84 | $1.17 | $15.01 |
| Electrician | $17.00 | $0.04 | $17.04 |
| Cement Mason/Concrete Finisher | $12.50 | $1.17 | $13.67 |
| Carpenter | $14.04 | $0.00 | $14.04 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.