Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Orange Flood Control Projects Only County, Texas.
Davis-Bacon Heavy
Wage determination TX20260052, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Truck Driver | $7.25 | $0.00 | $7.25 |
| Piledriverman | $11.26 | $0.85 | $12.11 |
| Piledriver | $7.25 | $0.00 | $7.25 |
| Oiler | $7.25 | $0.00 | $7.25 |
| Light Equipment Operator (Air Compressor, Blade Grader (Towed), Flexplane, Form Grader, Mixer (Less Than 14 Cu. Ft.), Pumps Pulsometer, Truck Crane Driver, Gasoline Or Diesel Driven Welding Machines (3 To 6 Machines), Hoist (Single Drum), Scrapers (3 Cu. Yds. Or Less)) | $7.25 | $0.00 | $7.25 |
| Laborer | $7.25 | $0.00 | $7.25 |
| Types Of Cat Tractors; Cable-Way; Backhoe, Shovel, Crane (Power Operated, All Types), Elevating Grader (Self-Propelled), Hoist (Motor Driven 2 Drums Or More), Mix Mobile, Winch Truck, Locomotive Crane, Mixer (14 Cubic Feet Or More), Paving Mixer (All Sizes), Scraper (Heavy Type Over 3 Cy), Trench Machine (All | $7.25 | $0.00 | $7.25 |
| Carpenter | $10.97 | $0.90 | $11.87 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.