Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Rockwall Water County, Texas.
Davis-Bacon Heavy
Wage determination TX20260018, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Plumbers And Pipefitters | $39.76 | $14.04 | $53.80 |
| Truck Driver | $8.53 | $0.00 | $8.53 |
| Power Equipment Operators: Front End Loader | $9.16 | $0.00 | $9.16 |
| Power Equipment Operators: Crane | $10.94 | $0.00 | $10.94 |
| Power Equipment Operators: (Tunneling Machine (48"" Or Less)) | $9.16 | $0.00 | $9.16 |
| Power Equipment Operators: (Backhoe) | $10.80 | $0.00 | $10.80 |
| Pipelayer | $7.83 | $0.00 | $7.83 |
| Laborers: (Utility) | $7.47 | $0.00 | $7.47 |
| Laborers: (Common) | $7.25 | $0.00 | $7.25 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.