Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Wharton Excludes Flood Control County, Texas.
Davis-Bacon Heavy
Wage determination TX20260088, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Truck Driver | $10.49 | $0.24 | $10.73 |
| Operator: Loader (Front End) | $11.13 | $0.00 | $11.13 |
| Operator: Bulldozer | $14.25 | $0.00 | $14.25 |
| Operator: Backhoe/Trackhoe | $13.25 | $0.00 | $13.25 |
| Laborer: Pipelayer | $13.75 | $0.00 | $13.75 |
| Laborer: Common Or General | $9.11 | $0.00 | $9.11 |
| Cement Mason/Concrete Finisher | $13.00 | $0.00 | $13.00 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.