Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in St John County, US Virgin Islands.
Davis-Bacon Building
Wage determination VI20260001, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Welder | $7.25 | $0.00 | $7.25 |
| Truck Driver | $7.25 | $0.00 | $7.25 |
| Sheet Rock Mechanic | $7.25 | $0.00 | $7.25 |
| Power Equipment Operators: Riggers | $7.92 | $0.00 | $7.92 |
| Power Equipment Operators: Fork Lift Operators | $7.25 | $0.00 | $7.25 |
| Power Equipment Operators: Crane | $7.60 | $0.00 | $7.60 |
| Power Equipment Operators: Cherry Pickers | $7.25 | $0.00 | $7.25 |
| Power Equipment Operators: Bulldozer | $7.54 | $0.00 | $7.54 |
| Power Equipment Operators: Asphalt Machine Operators | $7.62 | $0.00 | $7.62 |
| Power Equipment Operators: (Loaders) | $7.50 | $0.00 | $7.50 |
| Power Equipment Operators: (Backhoe) | $7.45 | $0.00 | $7.45 |
| Plumber | $7.25 | $0.00 | $7.25 |
| Painter | $7.25 | $0.00 | $7.25 |
| Laborers: Mason Tenders | $7.25 | $0.00 | $7.25 |
| Laborers: (Laborer) | $7.25 | $0.00 | $7.25 |
| Ironworker | $7.25 | $0.00 | $7.25 |
| Electrician | $7.63 | $0.00 | $7.63 |
| Cement Mason/Concrete Finisher | $7.25 | $0.00 | $7.25 |
| Carpenter | $7.25 | $0.00 | $7.25 |
Davis-Bacon Heavy
Wage determination VI20260002, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Truck Driver | $7.25 | $0.00 | $7.25 |
| Power Equipment Operators: Riggers | $8.47 | $0.00 | $8.47 |
| Power Equipment Operators: Oilers | $9.55 | $0.17 | $9.72 |
| Power Equipment Operators: Drillers | $7.25 | $0.00 | $7.25 |
| Power Equipment Operators: Cherry Pickers | $8.42 | $0.00 | $8.42 |
| Power Equipment Operators: Bulldozers | $7.55 | $0.00 | $7.55 |
| Power Equipment Operators: Asphalt Machine Operators | $7.62 | $0.00 | $7.62 |
| Power Equipment Operators: (Tractors) | $7.25 | $0.00 | $7.25 |
| Power Equipment Operators: (Loaders) | $7.25 | $0.00 | $7.25 |
| Power Equipment Operators: (Cranes) | $7.76 | $0.00 | $7.76 |
| Power Equipment Operators: (Backhoe) | $7.68 | $0.00 | $7.68 |
| Plumber/Pipefitter | $7.77 | $0.00 | $7.77 |
| Painter & Sandblaster | $7.25 | $0.17 | $7.42 |
| Millwright | $8.85 | $0.00 | $8.85 |
| Laborers: Mason Tenders | $7.25 | $0.17 | $7.42 |
| Laborers: Jackhammer Operators | $7.25 | $0.00 | $7.25 |
| Laborers: (Laborers) | $7.25 | $0.00 | $7.25 |
| Ironworker | $7.25 | $0.17 | $7.42 |
| Insulation Mechanic | $7.67 | $0.17 | $7.84 |
| Electrician | $7.63 | $0.00 | $7.63 |
| Cement Mason/Concrete Finisher | $7.59 | $0.00 | $7.59 |
| Carpenter | $7.41 | $0.00 | $7.41 |
| Boilermaker | $8.42 | $0.00 | $8.42 |
Davis-Bacon Highway
Wage determination VI20260004, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Electrician (Lineperson) | $45.80 | $19.27 | $65.07 |
| Truck Driver: Dump Truck | $20.00 | $0.00 | $20.00 |
| Operator: Bulldozer | $24.20 | $2.05 | $26.25 |
| Operator: Backhoe/Excavator/Trackhoe | $25.51 | $1.53 | $27.04 |
| Laborer: Mason Tender - Cement/Concrete | $17.01 | $1.11 | $18.12 |
| Laborer: Common Or General | $15.04 | $0.00 | $15.04 |
| Electrician | $39.25 | $0.00 | $39.25 |
| Cement Mason/Concrete Finisher | $22.73 | $0.00 | $22.73 |
| Carpenter | $20.00 | $0.00 | $20.00 |
Davis-Bacon Residential
Wage determination VI20260007, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Truck Driver: Dump Truck | $12.00 | $0.00 | $12.00 |
| Plumber | $30.75 | $0.00 | $30.75 |
| Painter | $17.27 | $0.00 | $17.27 |
| Operator: Backhoe/Excavator/Trackhoe | $18.81 | $0.00 | $18.81 |
| Laborer: Mason Tender - Cement/Concrete | $20.63 | $3.34 | $23.97 |
| Laborer: Common Or General | $13.22 | $0.00 | $13.22 |
| Electrician | $21.05 | $1.09 | $22.14 |
| Cement Mason/Concrete Finisher | $22.78 | $0.78 | $23.56 |
| Carpenter | $25.00 | $0.00 | $25.00 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.