Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in D.C County, Washington DC.
Davis-Bacon Heavy, Highway
Wage determination DC20260001, revision 6, updated 3. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Protective Coverings, Coatings And Finishes To All Types Of Mechanical Systems.) (Paid Holidays: New Year'S Day, Martin Luther Kind Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, The Day After Thanksgiving And Christmas Day Provided The Employee Works The Regular Work Day Before And After The Paid Holiday) | $40.77 | $20.17 | $60.94 |
| Mechanical Systems.) (A. Paid Holidays: New Year'S Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Day After Thanksgiving And Christmas Day Provided The Employee Works The Regular Work Day Before And After The Paid Holiday.) | $24.46 | $10.19 | $34.65 |
| Penetrating Items And Blank Openings) (A. Paid Holidays: New Year'S Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Day After Thanksgiving And Christmas Day Provided The Employee Works The Regular Work Day Before And After The Paid Holiday.) | $30.21 | $10.43 | $40.64 |
| Boilermakers | $47.37 | $25.60 | $72.97 |
| Bricklayer | $38.80 | $15.17 | $53.97 |
| Bricklayer: Refractory (Firebrick) | $43.94 | $17.74 | $61.68 |
| Carpenter/Lather | $34.41 | $14.33 | $48.74 |
| Millwright | $39.50 | $17.32 | $56.82 |
| Piledriverman | $36.60 | $14.47 | $51.07 |
| Diver | $43.92 | $14.47 | $58.39 |
| Diver Tender | $36.60 | $14.47 | $51.07 |
| Electricians | $59.50 | $23.06 | $82.56 |
| Line Construction: Cable Splicers | $44.56 | $17.50 | $62.06 |
| Line Construction: Equipment Operators | $44.56 | $17.50 | $62.06 |
| Line Construction: Groundmen | $18.00 | $11.66 | $29.66 |
| Line Construction: Linemen | $44.56 | $17.50 | $62.06 |
| Line Construction: Truck Driver | $23.00 | $12.76 | $35.76 |
| Power Equipment Operators, Heavy And Highway Construction: Group 1 - Tower Cranes And Cranes 100 Ton And Over. (Paid Holidays: New Years Day, Inaugural Day, Decoration Day, Independence Day, Labor Day, Martin Luther King'S Birthday, Veterans' Day, Thanksgiving Day, Friday After Thanksgiving And Christmas Day.) | $45.76 | $13.27 | $59.03 |
| Construction: Group 2 - 35 Ton Cranes & Above, Derricks, Concrete Boom Pump, Drill Rigs (+50,000 Lbs Torque), Mole, Mechanic. (Paid Holidays: New Years Day, Inaugural Day, Decoration Day, Independence Day, Labor Day, Martin Luther King'S Birthday, Veterans' Day, Thanksgiving Day, Friday After Thanksgiving And Christmas Day.) | $43.44 | $13.27 | $56.71 |
| Machines, Graders In Tunnels, Pile Driving Engines, Welder, Horizontal Directional Drill Operator, Tug Boats. (Paid Holidays: New Years Day, Inaugural Day, Decoration Day, Independence Day, Labor Day, Martin Luther King'S Birthday, Veterans' Day, Thanksgiving Day, Friday After Thanksgiving And Christmas Day.) | $40.73 | $13.27 | $54.00 |
| Motor Graders, Bulldozers, Trenching Machines, Ballast Regulator,Hoe Ram, Locomotive (Standard, Narrow Gauge, Tuggers). (Paid Holidays: New Years Day, Inaugural Day, Decoration Day, Independence Day, Labor Day, Martin Luther King'S Birthday, Veterans' Day, Thanksgiving Day, Friday After Thanksgiving And Christmas Day.) | $36.31 | $13.27 | $49.58 |
| Operator/Mechanic, Horizontal Directional Drill Locator, Skid Steers (Fine Grading), High Lifts (Lull Type Lifts). (Paid Holidays: New Years Day, Inaugural Day, Decoration Day, Independence Day, Labor Day, Martin Luther King'S Birthday, Veterans' Day, Thanksgiving Day, Friday After Thanksgiving And Christmas Day.) | $31.09 | $13.27 | $44.36 |
| Bobcat, Skid Steer, Space Heaters, Sweepers, Assistant Engineers, Oilers, Service Unit Equipment, Roller. (Paid Holidays: New Years Day, Inaugural Day, Decoration Day, Independence Day, Labor Day, Martin Luther King'S Birthday, Veterans' Day, Thanksgiving Day, Friday After Thanksgiving And Christmas Day.) | $28.39 | $13.27 | $41.66 |
| Power Equipment Operators, Heavy And Highway Construction: Group 7 - Master Mechanic. (Paid Holidays: New Years Day, Inaugural Day, Decoration Day, Independence Day, Labor Day, Martin Luther King'S Birthday, Veterans' Day, Thanksgiving Day, Friday After Thanksgiving And Christmas Day.) | $47.18 | $13.27 | $60.45 |
| Power Equipment Operators, Paving And Incidental Grading: Group 1 - Gradall Operator, Crane | $37.07 | $11.17 | $48.24 |
| Power Equipment Operators, Paving And Incidental Grading: Group 2 - Boom Truck, Milling Machine, Excavator, Rubber Tire Backhoe, Asphalt Paver, Asphalt Plant Engineer, Motor Grader, Track Loader, Rubber Tire Loader, Track Dozer, Concrete Paver | $32.89 | $11.17 | $44.06 |
| Power Equipment Operators, Paving And Incidental Grading: Group 3 - Broom Truck, Asphalt Roller | $28.09 | $11.17 | $39.26 |
| Power Equipment Operators, Paving And Incidental Grading: Group 4 - Air Compressor, Grade Rollers | $25.14 | $11.17 | $36.31 |
| Power Equipment Operators, Paving And Incidental Grading: Group 5 - Mechanic | $37.93 | $10.97 | $48.90 |
| Power Equipment Operators, Sewer, Gas And Water Line Construction: Group 1 - Cranes 50 Ton And Above. (Paid Holidays: New Year'S Day, Inaugural Day, Washington'S Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving And Christmas Day) | $41.40 | $11.55 | $52.95 |
| Power Equipment Operators, Sewer, Gas And Water Line Construction: Group 2 - Cranes Under 50 Ton Capacity, Boom Trucks. (Paid Holidays: New Year'S Day, Inaugural Day, Washington'S Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving And Christmas Day) | $35.00 | $11.55 | $46.55 |
| Power Equipment Operators, Sewer, Gas And Water Line Construction: Group 3 - Gradall, Lead Mechanic. (Paid Holidays: New Year'S Day, Inaugural Day, Washington'S Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving And Christmas Day) | $33.80 | $11.55 | $45.35 |
| Motor Graders, Mechanic 1, Hydraulic Tamper And Hoe Pack, Paving Mixers, Pile Driving Engines, Batch Plant, Concrete Pumps, Low-Boy Driver, Lube Truck. (Paid Holidays: New Year'S Day, Inaugural Day, Washington'S Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving And Christmas Day) | $33.26 | $11.55 | $44.81 |
| Trenching Machine, Well Drilling Machines, Concrete Mixers, Assistant Mechanic, Mini Excavator Under 10,000 Lbs. Gross Weight. (Paid Holidays: New Year'S Day, Inaugural Day, Washington'S Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving And Christmas Day) | $31.16 | $11.55 | $42.71 |
| Power Equipment Operators, Sewer, Gas And Water Line Construction: Group 6 - Oiler, Dump Truck, Skid Steer/Bobcat, Rollers. (Paid Holidays: New Year'S Day, Inaugural Day, Washington'S Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving And Christmas Day) | $25.89 | $11.55 | $37.44 |
| Ironworker, Structural And Ornamental | $37.86 | $25.86 | $63.72 |
| Ironworker, Reinforcing | $31.88 | $23.78 | $55.66 |
| Strippers, General Laborers, Railroad Track Laborers, Riprap Man, Scale Man, Stake Jumper, Structure Mover, Includes Foundation, Separation, Preparation, Cribbing, Shoring, Jacking And Unloading Of Structures, Water Nozzleman, Timber Bucker And Faller, Truck Loader, Water Boys, Tool Room Men | $33.25 | $8.70 | $41.95 |
| Scaffold Builders Over One Tier High, Power Tool Operator (Gas, Electric, Or Pneumatic), Sandblast Or Gunnite Tailhose Man, Scaffold Erector (Steel Or Wood), Vibrator Operator (Up To 4 Feet), Asphalt Cutter, Mortar Men, Shorer And Lagger, Creosote Material Handler, Corrosive Enamel Or Equal, Paver Breaker And Jackhammer Operators | $34.27 | $8.70 | $42.97 |
| Laborers, Heavy And Highway And Sewer & Water Lines Construction: Group 3 - Multi-Section Pipe Layer, Non-Metallic Clay And Concrete Pipe Layer (Including Caulker, Collarman, Jointer, Rigger And Jacker, Thermal Welder And Corrugated Metal Culvert Pipe Layer | $34.27 | $8.70 | $42.97 |
| Laborers, Heavy And Highway And Sewer & Water Lines Construction: Group 4 - Asphalt Block Pneumatic Cutter, Asphalt Roller, Walker, Chainsaw Operator With Attachment, Concrete Saw (Walking), High Scalers, Jackhammer Operator *Using Over 6 Feet Of Steel), Vibratory Operator (4 Feet And Over), Well Point Installer, Air Trac Operator | $34.32 | $8.70 | $43.02 |
| Laborers, Heavy And Highway And Sewer & Water Lines Construction: Group 5 - Asphalt Screeder, Big Drills, Cut Of The Hole Drills (1 1/2"" Piston Or Larger), Down The Hole Drills (3 1/2"" Piston Or Larger) Gunnite Or Sandblaster Nozzleman, Asphalt Raker, Asphalt Tamper, Form Setter, Demolition Torch Operator, Shotcrete Nozzlemen And Potman | $35.00 | $8.70 | $43.70 |
| Laborers, Heavy And Highway And Sewer & Water Lines Construction: Group 6 - Powderman, Master Form Setters | $35.93 | $8.70 | $44.63 |
| Laborers, Heavy And Highway And Sewer & Water Lines Construction: Group 7 - Brick Paver (Asphalt Block Paver, Asphalt Block Sawman, Asphalt Block Grinder, Hastings Block Or Similar Type) | $36.81 | $8.70 | $45.51 |
| Laborers, Heavy And Highway And Sewer & Water Lines Construction: Group 8 - Licensed Powdermen | $37.95 | $8.70 | $46.65 |
| Laborers:, Skilled Asbestos Abatement Laborers (Hazardous Waste Removal, Except On Mechanical Systems: Preparation For, Removing And Encapsulation Of Hazardous Materials From Non-Mechanical Systems) | $32.25 | $8.70 | $40.95 |
| Laborers:, Skilled Toxic And Hazardous Waste Removal Laborers (Hazardous Waste Removal, Except On Mechanical Systems: Preparation For, Removing And Encapsulation Of Hazardous Materials From Non-Mechanical Systems) | $32.25 | $8.70 | $40.95 |
| Laborers: Tunnel, Raise, & Shaft (Free Air) For Heavy And Sewer And Water Lines Construction, Group 1 - Brakeman, Bull Gang, Dumper, Trackmen, Concrete Man | $34.41 | $8.70 | $43.11 |
| Laborers: Tunnel, Raise, & Shaft (Free Air) For Heavy And Sewer And Water Lines Construction, Group 2 - Chuck Tender, Powdermen In Prime House, Form Setters And Movers, Nippers, Cableman, Houseman, Groutman, Bell Or Signalman, Top Or Bottom Vibratory Operator | $35.48 | $8.70 | $44.18 |
| 3 - Miners, Re-Bar Underground, Concrete Or Gunnite Nozzlemen, Powdermen, Timbermen And Re-Timbermen, Wood Steel Including Liner Plate Or Other Support, Material Motorman, Caulkers, Diamond Drill Operators, Riggers, Cement Finishers-Underground, Welders And Burners, Shield Driver, Air Trac Operator, Shot Crete Nozzleman And Potman | $38.17 | $8.70 | $46.87 |
| Laborers: Tunnel, Raise And Shaft (Compressed Air) For Heavy Construction Only, Pounds (1-14) And Hours (7) | $44.04 | $8.70 | $52.74 |
| Laborers: Tunnel, Raise And Shaft (Compressed Air) For Heavy Construction Only, Pounds (14-18) And Hours (6) | $51.82 | $8.70 | $60.52 |
| Laborers: Asphalt Raker & Concrete Saw Operator (Paving And Incidental Grading) | $24.30 | $8.74 | $33.04 |
| Laborers: Asphalt Tamper & Concrete Shoveler (Paving And Incidental Grading) | $23.86 | $8.74 | $32.60 |
| Laborers: Jack Hammer (Paving And Incidental Grading) | $23.89 | $8.74 | $32.63 |
| Laborers: Laborer (Paving And Incidental Grading) | $23.06 | $8.74 | $31.80 |
| Laborers: Sand Setter & Form Setter (Paving And Incidental Grading) | $25.10 | $8.74 | $33.84 |
| Laborers: Asphalt Shoveler (Paving And Incidental Grading) | $23.27 | $8.74 | $32.01 |
| Laborers: Brick Masonry Work (Mason Tenders) | $24.31 | $8.70 | $33.01 |
| Laborers: Brick Masonry Work (Scaffold Builders, Mortarmen) | $24.96 | $8.70 | $33.66 |
| Marble & Stone Mason (Includes Pointing, Caulking And Cleaning Of All Types Of Masonry, Brick, Stone And Cement Structures) | $45.65 | $21.21 | $66.86 |
| Mosaic & Terrazzo Worker, Tile Layer | $34.34 | $14.20 | $48.54 |
| Marble, Tile & Terrazzo Finisher | $28.85 | $12.55 | $41.40 |
| Painters: Commercial And Mold Remediation, Painters, Wallcovers And Drywall Finishers | $29.16 | $11.86 | $41.02 |
| Painters: All Industrial Work | $34.30 | $12.98 | $47.28 |
| Painters: Bridges, Heavy Highway, Lead Abatement And Flame/Thermal Spray | $42.93 | $13.77 | $56.70 |
| Metal Polishing And Refinishing | $28.46 | $11.56 | $40.02 |
| Cement Masons: (Heavy Construction Only) | $30.50 | $14.23 | $44.73 |
| Cement Masons: Cement Masons (Paving & Incidental Grading) | $23.50 | $9.75 | $33.25 |
| Cement Masons: Concrete Saw Operators (Paving & Incidental Grading) | $23.50 | $9.75 | $33.25 |
| Cement Masons: Form Setters (Paving & Incidental Grading) | $23.50 | $9.75 | $33.25 |
| Plumbers (Paid Holidays: Labor Day, Veterans' Day, Thanksgiving Day And The Day After Thanksgiving, Christmas Day, New Year'S Day, Martin Luther King'S Birthday, Memorial Day And The Fourth Of July.) | $53.30 | $23.71 | $77.01 |
| Steamfitter, Refrigeration & Air Conditioning Mechanic (Paid Holidays: New Year'S Day, Martin Luther King'S Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day And The Day After Thanksgiving And Christmas Day) | $55.00 | $24.46 | $79.46 |
| Sheet Metal Worker (Paid Holidays: New Year'S Day, Martin Luther King'S Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day And Christmas Day) | $53.42 | $23.20 | $76.62 |
| Truck Drivers: Heavy & Highway Construction - Tractor Trailer, Low Boy (Vacation: Employees Will Receive One (1) Week'S Paid Vacation After One (1) Year Of Service.) | $33.75 | $7.30 | $41.05 |
| Truck Drivers: Heavy & Highway Construction - Truck Drivers (Vacation: Employees Will Receive One (1) Week'S Paid Vacation After One (1) Year Of Service.) | $31.75 | $7.30 | $39.05 |
| Truck Drivers: Paving & Incidental Grading: All Paving Projects Where The Grading Is Incidental To The Paving A. Vacation: Employees Will Receive One (1) Week'S Paid Vacation After One (1) Year Of Service | $31.75 | $7.30 | $39.05 |
Davis-Bacon Building
Wage determination DC20260002, revision 3, updated 2. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Protective Coverings, Coatings And Finishes To All Types Of Mechanical Systems) A. Paid Holidays: New Year'S Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Day After Thanksgiving And Christmas Day Provided The Employee Works The Regular Work Day Before And After The Paid Holiday | $40.77 | $20.17 | $60.94 |
| Insulation Materials, Whether They Contain Asbestos Or Not, From Mechanical Systems A. Paid Holidays: New Year'S Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Day After Thanksgiving And Christmas Day Provided The Employee Works The Regular Work Day Before And After The Paid Holiday | $24.46 | $10.19 | $34.65 |
| Penetrating Items And Blank Openings. A. Paid Holidays: New Year'S Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Day After Thanksgiving And Christmas Day Provided The Employee Works The Regular Work Day Before And After The Paid Holiday | $30.21 | $10.43 | $40.64 |
| Bricklayer | $38.80 | $15.17 | $53.97 |
| Carpenter: Includes Drywall Hanging, Form Work, And Soft Floor Laying-Carpet | $34.41 | $14.33 | $48.74 |
| Millwright | $39.50 | $17.32 | $56.82 |
| Piledriverman | $36.60 | $14.47 | $51.07 |
| Electrician: Includes Installation Of HVAC/Temperature Controls | $59.50 | $23.06 | $82.56 |
| And/Or Raceways Shall Be Installed By Inside Wiremen. On Sites Where There Is No Inside Wireman Employed, The Teledata Technician May Install Raceway Or Conduit Not Greater Than 10 Feet. Fire Alarm Work Is Excluded On All New Construction Sites Or Wherever The Fire Alarm System Is Installed In Conduit. All HVAC Control Work | $34.16 | $13.54 | $47.70 |
| Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas Day And The Friday After Thanksgiving. B. Vacations: Employer Contributes 8% Of Basic Hourly Rate For 5 Years Or More Of Service; 6% Of Basic Hourly Rate For 6 Months To 5 Years Of Service As Vacation Pay Credit | $57.16 | $38.44 | $95.60 |
| Ironworker: Structural And Ornamental | $37.86 | $25.86 | $63.72 |
| Ironworker, Reinforcing | $31.88 | $23.78 | $55.66 |
| Laborer: Skilled | $30.47 | $8.70 | $39.17 |
| Marble/Stone Mason Including Pointing, Caulking And Cleaning Of All Types Of Masonry, Brick, Stone And Cement Except Pointing, Caulking, Cleaning Of Existing Masonry, Brick, Stone And Cement (Restoration Work) | $45.65 | $21.21 | $66.86 |
| Terrazzo Worker/Setter | $34.34 | $14.20 | $48.54 |
| Terrazzo Finisher | $28.85 | $12.55 | $41.40 |
| Tile Setter | $34.34 | $14.20 | $48.54 |
| Tile Finisher | $28.85 | $12.55 | $41.40 |
| Painter: Brush, Roller, Spray And Drywall Finisher | $29.16 | $11.86 | $41.02 |
| Plasterer (Including Fireproofing) | $32.86 | $10.46 | $43.32 |
| Cement Mason/Concrete Finisher | $30.50 | $14.23 | $44.73 |
| Plumber A. Paid Holidays: Labor Day, Veterans' Day, Thanksgiving Day And The Day After Thanksgiving, Christmas Day, New Year'S Day, Martin Luther King'S Birthday, Memorial Day And The Fourth Of July | $53.30 | $23.71 | $77.01 |
| Pipefitter: Includes HVAC Pipe Installation A. Paid Holidays: New Year'S Day, Martin Luther King'S Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day And The Day After Thanksgiving And Christmas Day | $55.00 | $24.46 | $79.46 |
| Roofer | $36.26 | $14.91 | $51.17 |
| Sprinkler Fitter (Fire Sprinklers) | $45.22 | $27.69 | $72.91 |
| Sheet Metal Worker: Including HVAC Duct Installation A. Paid Holidays: New Year'S Day, Martin Luther King'S Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day And Christmas Day | $53.42 | $23.20 | $76.62 |
| Pointer, Caulker, Cleaner, Includes Pointing, Caulking, Cleaning Of Existing Masonry, Brick, Stone And Cement Structures (Restoration Work); Excludes Pointing, Caulking, Cleaning Of New Or Replacement Masonry, Brick, Stone Or Cement | $18.88 | $0.00 | $18.88 |
| Laborer: Mason Tender For Pointing, Caulking, Cleaning Of Existing Masonry, Brick, Stone And Cement Structures (Restoration Work); Excludes Pointing, Caulking And Cleaning Of New Or Replacement Masonry, Brick, Stone And Cement | $11.67 | $0.00 | $11.67 |
| Laborer: Mason Tender - Cement/Concrete | $15.40 | $2.85 | $18.25 |
| Laborer: Common Or General | $13.04 | $2.80 | $15.84 |
Davis-Bacon Residential
Wage determination DC20260003, revision 1, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Insulation Materials, Whether They Contain Asbestos Or Not, From Mechanical Systems A. Paid Holidays: New Year'S Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Day After Thanksgiving And Christmas Day Provided The Employee Works The Regular Work Day Before And After The Paid Holiday | $24.46 | $10.19 | $34.65 |
| Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas Day And The Friday After Thanksgiving. B. Vacations: Employer Contributes 8% Of Basic Hourly Rate For 5 Years Or More Of Service; 6% Of Basic Hourly Rate For 6 Months To 5 Years Of Service As Vacation Pay Credit | $57.16 | $38.44 | $95.60 |
| Plumber A. Paid Holidays: Labor Day, Veterans' Day, Thanksgiving Day And The Day After Thanksgiving, Christmas Day, New Year'S Day, Martin Luther King'S Birthday, Memorial Day And The Fourth Of July | $29.60 | $14.71 | $44.31 |
| Pipefitter (HVAC Pipe Installation) A. Paid Holidays: New Year'S Day, Martin Luther King'S Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day And The Day After Thanksgiving And Christmas Day | $55.00 | $24.46 | $79.46 |
| Sheet Metal Worker | $18.33 | $0.00 | $18.33 |
| Roofer | $26.33 | $0.00 | $26.33 |
| Pointer, Caulker, Cleaner, Includes Pointing, Caulking, Cleaning Of Existing Masonry, Brick, Stone And Cement Structures (Restoration Work); Excludes Pointing, Caulking, Cleaning Of New Or Replacement Masonry, Brick, Stone Or Cement | $18.33 | $0.00 | $18.33 |
| Painter: Brush And Roller | $15.32 | $5.15 | $20.47 |
| Laborer: Mason Tender For Pointing, Caulking, Cleaning Of Existing Masonry, Brick, Stone And Cement Structures (Restoration Work); Excludes Pointing, Caulking And Cleaning Of New Or Replacement Masonry, Brick, Stone And Cement | $12.59 | $0.00 | $12.59 |
| Laborer: Common Or General | $12.54 | $0.00 | $12.54 |
| Electrician | $19.93 | $3.11 | $23.04 |
| Drywall Finisher/Taper | $15.00 | $0.00 | $15.00 |
| Cement Mason/Concrete Finisher | $18.72 | $0.00 | $18.72 |
| Carpenter, Including Drywall Hanging | $17.43 | $2.37 | $19.80 |
| Bricklayer | $20.71 | $0.00 | $20.71 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.