Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Benton Excludes D.O.E. Hanford Site County, Washington.
Davis-Bacon Building
Wage determination WA20260102, revision 2, updated 1. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Heat & Frost Insulator (Includes Duct, Pipe And Mechanical Systems) | $75.37 | $18.82 | $94.19 |
| Bricklayer | $39.57 | $20.50 | $60.07 |
| Tile Setter | $36.35 | $14.57 | $50.92 |
| Tile Finisher | $27.26 | $11.99 | $39.25 |
| Carpenter | $44.21 | $17.28 | $61.49 |
| Electrician | $60.00 | $27.78 | $87.78 |
| Employer Contributes 8% Of Regular Hourly Rate As Vacation Pay Credit For Employees With More Than 5 Years Of Service, And 6% For 6 Months To 5 Years Of Service. B. Paid Holidays: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday After Thanksgiving, And Christmas Day | $67.61 | $38.44 | $106.05 |
| Ironworker | $43.40 | $32.77 | $76.17 |
| Laborer: Grade Checker | $40.21 | $16.90 | $57.11 |
| Laborer: Pipelayer | $37.80 | $16.90 | $54.70 |
| Laborer: Hod Carrier | $38.05 | $16.75 | $54.80 |
| Laborer: Form Stripping | $50.38 | $16.96 | $67.34 |
| Laborer: Jackhammer | $51.52 | $16.99 | $68.51 |
| Laborer: Nozzle Person | $52.31 | $17.01 | $69.32 |
| Laborer, Mason Tender Brick | $50.38 | $16.96 | $67.34 |
| Laborer: Fire Watch | $40.56 | $15.60 | $56.16 |
| Painter | $41.24 | $14.70 | $55.94 |
| Plumber | $47.15 | $27.20 | $74.35 |
| Pipefitter | $65.20 | $34.91 | $100.11 |
| Roofer, Excludes Metal Roofs | $35.64 | $14.89 | $50.53 |
| Sheetmetal Worker (Including Metal Roofing) | $50.00 | $28.41 | $78.41 |
| Operator: Oiler | $36.39 | $16.62 | $53.01 |
| Operator: Bobcat/Skid Steer/Skid Loader | $40.53 | $9.56 | $50.09 |
| Operator: Backhoe/Excavator/Trackhoe | $28.10 | $0.00 | $28.10 |
| Laborer: Mason Tender - Cement/Concrete | $29.14 | $12.05 | $41.19 |
| Laborer: Concrete Saw Chain | $35.03 | $10.86 | $45.89 |
| Laborer: Common Or General | $29.53 | $6.49 | $36.02 |
| Cement Mason/Concrete Finisher | $21.94 | $0.00 | $21.94 |
| Truck Driver: Concrete Truck | $55.43 | $27.52 | $82.95 |
| Truck Driver: Dump Truck | $37.22 | $20.93 | $58.15 |
| Operator: Concrete Pump | $52.92 | $22.63 | $75.55 |
| Operator: Drill | $56.42 | $21.15 | $77.57 |
Davis-Bacon Heavy
Wage determination WA20260121, revision 2, updated 1. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Carpenter | $44.21 | $17.28 | $61.49 |
| Line Construction: Line Person | $64.17 | $24.54 | $88.71 |
| Tree Trimmer: Ground Person | $22.60 | $16.37 | $38.97 |
| Tree Trimmer | $42.57 | $17.97 | $60.54 |
| Line Construction: Equipment Operator | $55.19 | $20.94 | $76.13 |
| Line Construction: (Ground Person) | $37.53 | $17.74 | $55.27 |
| Electrician | $60.00 | $27.78 | $87.78 |
| Yar | $40.39 | $23.40 | $63.79 |
| Yar | $40.05 | $23.40 | $63.45 |
| Yar | $39.71 | $23.40 | $63.11 |
| Yar | $39.51 | $23.40 | $62.91 |
| Yar | $39.31 | $23.40 | $62.71 |
| Yar | $38.56 | $23.40 | $61.96 |
| Yar | $38.17 | $23.40 | $61.57 |
| Ironworker | $43.40 | $32.77 | $76.17 |
| Traffic Control: Flagger | $34.03 | $16.90 | $50.93 |
| Laborer: Nozzle Person | $52.31 | $17.01 | $69.32 |
| Laborer: Pipelayer | $37.80 | $16.90 | $54.70 |
| Painter | $41.24 | $14.70 | $55.94 |
| Cement Mason/Concrete Finisher | $40.89 | $18.64 | $59.53 |
| Truck Driver: Water Truck | $31.62 | $16.84 | $48.46 |
| Truck Driver: Dump Truck | $29.55 | $15.38 | $44.93 |
| Traffic Control: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper | $30.61 | $10.89 | $41.50 |
| Operator: Forklift | $45.93 | $19.20 | $65.13 |
| Laborer: Fence Erector | $30.21 | $0.00 | $30.21 |
| Laborer: Mason Tender - Cement/Concrete | $27.51 | $2.96 | $30.47 |
| Laborer: Hod Carrier | $35.06 | $10.94 | $46.00 |
| Laborer: Concrete Saw Chain | $36.24 | $10.89 | $47.13 |
| Laborer: Common Or General | $29.27 | $12.01 | $41.28 |
| Laborer: Asphalt, Includes Raker, Shoveler, Spreader And Distributor | $36.96 | $8.56 | $45.52 |
| Grade Checker | $31.40 | $14.10 | $45.50 |
| Truck Driver: Asphalt Mix | $55.43 | $27.52 | $82.95 |
| Operator: Crane | $54.45 | $25.57 | $80.02 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.