Davis-Bacon rates (construction)
Minimum pay for laborers and mechanics on federal and federally funded construction over $2,000 in Franklin D.O.E. Hanford Site Only County, Washington.
Davis-Bacon Building, Heavy, Highway
Wage determination WA20260002, revision 2, updated 0. Basic hourly rate plus fringe benefit per hour.
| Trade | Rate | Fringe | Total / hour |
|---|---|---|---|
| Trailer, 50 Tons And Under Lowboy | $37.56 | $21.81 | $59.37 |
| Warehouseperson, To Include Shipping And Receiving | $37.22 | $21.81 | $59.03 |
| Tow Trucks | $37.02 | $21.81 | $58.83 |
| Mulcher; Water Tank Truck, Up To 1800 Gallons | $36.47 | $21.81 | $58.28 |
| Materials | $33.83 | $21.81 | $55.64 |
| Sprinkler Fitter | $41.33 | $28.58 | $69.91 |
| Sheet Metal Worker | $47.76 | $27.70 | $75.46 |
| Roofer (Including Waterproofer And Kettleman) | $34.72 | $13.31 | $48.03 |
| (Reverse Circulation Drill Under 8 Inch Bit) | $37.34 | $22.45 | $59.79 |
| Operator | $36.99 | $22.45 | $59.44 |
| Backhoe); Tugger Operator | $36.28 | $22.45 | $58.73 |
| Plumber/Pipefitter | $62.95 | $33.76 | $96.71 |
| Painter (Soft Floor Covers, Glaziers, Spray Painters, Steel Painters, Steam Clean And Acid Etching, Sign Writers) | $38.11 | $16.27 | $54.38 |
| Laborer: Group 9 Grade Checker | $38.03 | $16.30 | $54.33 |
| Laborer: Group 8 Powderman | $37.65 | $16.30 | $53.95 |
| Laborer: Group 7 Hod Carrier | $37.10 | $16.30 | $53.40 |
| Laborer: Group 6 Construction Specialist | $35.94 | $16.30 | $52.24 |
| Laborer: Group 5 Sandhogs-[(38-44 Lbs),(6 Hrs)] Rate Per Shift (Rates Increases Are Computed By Multiplying The Increase X 8 Hour Shift And Add Total To The Previous Rate.) | $312.36 | $16.30 | $328.66 |
| Laborer: Group 5 Sandhogs-[(26-32 Lbs),(6 Hrs)] Rate Per Shift (Rates Increases Are Computed By Multiplying The Increase X 8 Hour Shift And Add Total To The Previous Rate.) | $307.99 | $16.30 | $324.29 |
| Laborer: Group 5 Sandhogs-[(22-26 Lbs),(6 Hrs)] Rate Per Shift (Rates Increases Are Computed By Multiplying The Increase X 8 Hour Shift And Add Total To The Previous Rate.) | $305.37 | $16.30 | $321.67 |
| Laborer: Group 5 Sandhogs-[(14-18 Lbs),(6 Hrs)] Rate Per Shift(Rates Increases Are Computed By Multiplying The Increase X 8 Hour Shift And Add Total To The Previous Rate.) | $300.77 | $16.30 | $317.07 |
| Laborer: Group 5 Sandhogs-[(1-14 Lbs),(6 Hrs)] Rate Per Shift (Rates Increases Are Computed By Multiplying The Increase X 8 Hour Shift And Add Total To The Previous Rate.) | $295.84 | $16.30 | $312.14 |
| Laborer: Group 5 Outside Lock And Gauge Tender (Rates Increases Are Computed By Multiplying The Increase X 8 Hour Shift And Add Total To The Previous Rate.) | $288.48 | $16.30 | $304.78 |
| Laborer: Group 5 Sandhogs-[(32-38 Lbs),(6 Hrs)] Rate Per Shift (Rates Increases Are Computed By Multiplying The Increase X 8 Hour Shift And Add Total To The Previous Rate.) | $310.95 | $16.30 | $327.25 |
| Laborer: Group 5 Sandhogs-[(18-22 Lbs),(6 Hrs)] Rate Per Shift. (Rates Increases Are Computed By Multiplying The Increase X 8 Hour Shift And Add Total To The Previous Rate.) | $301.05 | $16.30 | $317.35 |
| Jointer, Mortarman, Rigger, Jacker, Shorer, Valve Or Meter Installer, Temper, (Including Pressurized And Non-Pressurized Ductile Pipe, Gravity Pipe And Hdpe (Fused And Non-Fused); Pipewrapper; Plasterer Tender, Trenchless Technology, Vibrators (All); Laser Beam Operator (Elevation Control; Technician) | $35.74 | $16.30 | $52.04 |
| Water Pipe Liner, Rigger/Signalperson, Remote Equipment Operator (I.E. Compaction And Emolition) Compaction Equipment (To Include All Hand Operatored Power Compaction Equipment); Railroad Power Spiker Or Puller, Dual Mobile; Railroad Equipment, Power Driven, Except Dual Mobile Power Spiker Or Puller | $35.42 | $16.30 | $51.72 |
| Tailhoseman, Scaffold Erector (Wood Or Steel); Stake Jumper; Structural Mover (To Include Separating Foundation, Preparation, Cribbing, Shoring, Jacking And Unloading Of Structures); Tailhoseman (Water Nossel); Timber Bucker And Faller (By Hand); Track Laborer (Rr); Truck Loader; Wellpoint Man; (Hdpe Or Similar Liner Installer) | $35.10 | $16.30 | $51.40 |
| Ironworker | $41.91 | $32.27 | $74.18 |
| Electrician: Electricians | $58.00 | $25.92 | $83.92 |
| Electrician: Cable Splicers | $60.90 | $26.01 | $86.91 |
| Drywall Finisher/Taper | $35.45 | $18.13 | $53.58 |
| Machines; Scarifiers; Working On Scaffolds | $40.17 | $17.04 | $57.21 |
| Carpenter: Piledriver | $47.41 | $16.56 | $63.97 |
| Carpenter: Tenders | $51.73 | $16.56 | $68.29 |
| Carpenter: Millwright & Machine Erector | $59.83 | $19.05 | $78.88 |
| Carpenter: Divers | $52.73 | $16.56 | $69.29 |
| Carpenter: Carpenters | $45.86 | $16.56 | $62.42 |
| Bricklayer | $38.48 | $20.09 | $58.57 |
| Boilermaker | $43.83 | $32.56 | $76.39 |
| Asbestos Worker/Heat & Frost Insulator | $44.51 | $22.89 | $67.40 |
Always price from the wage determination attached to the solicitation (and any amendment): it is the one that applies to that contract. Rates shown are copied from the public SAM.gov documents; check the official document before you bid.